Serra Pérez, Ester(Universitat Politècnica de València, 2022-10-17)
[ES] En el presente Trabajo Final de Máster se ha planificado e implementado el sistema de
gestión de trabajo IWS en una línea de producción de una empresa fabricante de snacks.
Previamente a la planificación, se ha ...
[EN] Rapid transit construction projects are major endeavours that require long-term planning by several players, including politicians, urban planners, engineers, management consultants, and citizen groups. Traditionally, ...
[EN] Parallel machine scheduling problems have many practical and industrial applications. In this paper we study a generalization which is the unrelated parallel machine scheduling problem with machine and job sequence ...
Perea Rojas Marcos, Federico; Puerto Albandoz, Justo(Elsevier, 2013-04-16)
This paper discusses and extends some competitive aspects of the games proposed in an earlier work, where a robust railway network design problem was proposed as a non-cooperative zero-sum game in normal form between a ...
Yepes Borrero, Juan Camilo(Universitat Politècnica de València, 2021-01-10)
[ES] En esta tesis doctoral se estudia el problema de secuenciación de máquinas paralelas no relacionadas con necesidad de ajustes y recursos adicionales asignados en los ajustes. En este problema, se tiene un grupo de ...
Perea Rojas Marcos, Federico; Vázquez, Rafael; Galán-Vioque, Jorge(Institute of Electrical and Electronics Engineers (IEEE), 2015-07)
[EN] This paper deals with the swath acquisition planning problem for
multisatellite Earth observation missions. Given a set of satellites and
a mission time frame, the problem we solve consists of selecting a set
of ...
[EN] The problem studied in this paper takes as input data a set of lines
forming a railway network, and an origin¿destination (OD) matrix. The OD pairs
may use either the railway network or an alternative transportation ...
Perea Rojas Marcos, Federico; Menezes, Mozart B. C.; Mesa, Juan A.; Rubio-Del-Rey, Fernando(Springer-Verlag, 2020-07)
[EN] In this paper we analyze the computational complexity of transportation infrastructure network design problems, in the presence of a competing transportation mode. Some of these problems have previously been introduced ...
Yepes Borrero, Juan Camilo(Universitat Politècnica de València, 2017-08-30)
En este trabajo el alumno aborda un problema de secuenciación de máquinas paralelas no relacionadas con tiempos de ajuste entre trabajos. Los tiempos de ajuste dependen tanto de la máquina como de la secuencia de trabajos ...