Blasco Cuesta, Francesc David(Universitat Politècnica de València, 2014-07-14)
[EN]
The present project has as goal the structural analyses from an underpass to allowed the transit through a roundabout under the KP 11+557 of the highway of the Mediterranean. this project is located in the municipal ...
Villalba Garzarán, Manuel(Universitat Politècnica de València, 2014-07-14)
[EN] As a consequence of the construction of the A-7 Motorway, in its section Cocentaina-Muro de Alcoy, there is a need of replacing the roads affected by it. Specifically, this project aims to deal with the crossing between ...
Cervera Vallbona, Ana(Universitat Politècnica de València, 2014-07-18)
As a consequence of the construction of the A-7 Motorway in its section Cocentaina-Muro de Alcoy, there is a need of replacing the roads affected by it. Specifically, this project aims to deal with the crossing between the ...
Melero Morán, Pablo(Universitat Politècnica de València, 2014-07-14)
[EN] The project developed in this work is to propose the most effective solution in terms of technical and economical point of view for the replacement of the road in the PK 7 +763 tranche Cocentaina - Muro de Alcoy. This ...
ARNAU COLOMER, ANTONI GERMÁ(Universitat Politècnica de València, 2014-09-19)
[EN] As a result of the construction of the Mediterranean motorway A-7, corresponding to Cocentaina-Muro de Alcoy section, the roads are located where marks the route of the highway are directly affected by the course of ...
Martínez Santos, José Luis(Universitat Politècnica de València, 2015-09-30)
[EN] This present TFG consist in the execution of a construction of underground passage, under the platforms of the La Font Sant Lluis Valencia station, as well as the necessary structures for access to it from the platforms, ...