- -

Estudio previo para la duplicación de vía de la línea Valencia-Utiel entre la bifurcación a Xirivella-Alter y la estación de Aldaia (Valencia)

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Estudio previo para la duplicación de vía de la línea Valencia-Utiel entre la bifurcación a Xirivella-Alter y la estación de Aldaia (Valencia)

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Salvador Zuriaga, Pablo es_ES
dc.contributor.author Fuentes Beta, Nicolás de es_ES
dc.coverage.spatial east=-0.44971238730355134; north=39.46163885408766; name=Carrer Unitat Actuació 21 N, 46960 Aldaia, Valencia, Espanya es_ES
dc.date.accessioned 2020-01-30T18:35:56Z
dc.date.available 2020-01-30T18:35:56Z
dc.date.created 2019-12-19
dc.date.issued 2020-01-30 es_ES
dc.identifier.uri http://hdl.handle.net/10251/136086
dc.description.abstract [ES] El presente trabajo trata sobre el estudio de la duplicación de vía de la línea Valencia Utiel entre la bifurcación a Xirivella-Alter y la estación de Aldaia. La línea C-3 es una vía de entrada a Valencia para la gente del interior de la comunidad. Dicha vía, al tener bastante tiempo, se dimensionó en vía única. Actualmente presenta problemas de saturación durante distintas horas del día. Además su servicio es deficiente, pues al ser vía única, las frecuencias de paso son demasiado elevadas, siendo de cuarenta y cinco minutos en días ordinarios y de sesenta minutos los días festivos. Con este trabajo se pretende estudiar la viabilidad de las distintas opciones del desdoblamiento de vía para el tramo indicado y adoptar una solución final para mejorar el servicio ofrecido y poder disponer de una vía para cada sentido, lo cual mejoraría sustancialmente el servicio al haber más trenes por hora y suprimir los retrasos acumulados que se podían ocasionar en el estado de vía única. es_ES
dc.description.abstract [EN] This paper is about the study of the duplication of the Valencia Utiel line between the Xirivella-Alter fork and the Aldaia Station. The C-3 line is a Gateway to Valencia for people who live inside the community. This route, having enought time, was sized in a single way. Currently it has saturation problems during different times of the day. In addition, its service is poor, since being a single track, the frequencies of passage are too high, being forty-five minutes on ordinary days and sixty minutes on holidays. This work aims to study the feasibility of the different options of the splitting of the track for the indicated section and adopt a final solution to improve the service offered and to have a route for each direction, which would substantially improve the service by having more trains per hour and suppress the accumulated delays that could be caused in the one-way state. es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Ferrocarril es_ES
dc.subject Vía. es_ES
dc.subject Railway es_ES
dc.subject.classification INGENIERIA E INFRAESTRUCTURA DE LOS TRANSPORTES es_ES
dc.subject.other Grado en Ingeniería Civil-Grau en Enginyeria Civil es_ES
dc.title Estudio previo para la duplicación de vía de la línea Valencia-Utiel entre la bifurcación a Xirivella-Alter y la estación de Aldaia (Valencia) es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería e Infraestructura de los Transportes - Departament d'Enginyeria i Infraestructura dels Transports es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports es_ES
dc.contributor.affiliation Universitat Politècnica de València. Instituto del Transporte y Territorio - Institut del Transport i Territori es_ES
dc.description.bibliographicCitation Fuentes Beta, ND. (2019). Estudio previo para la duplicación de vía de la línea Valencia-Utiel entre la bifurcación a Xirivella-Alter y la estación de Aldaia (Valencia). http://hdl.handle.net/10251/136086 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\122321 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem