Selection of maintenance, renewal and improvement projects in rail lines using the analytic network process

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Selection of maintenance, renewal and improvement projects in rail lines using the analytic network process

Mostrar el registro completo del ítem

Montesinos-Valera, J.; Aragonés-Beltrán, P.; Pastor-Ferrando, J. (2017). Selection of maintenance, renewal and improvement projects in rail lines using the analytic network process. Structure and Infrastructure Engineering. 13(11):1476-1496. https://doi.org/10.1080/15732479.2017.1294189

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/153049

Ficheros en el ítem

Metadatos del ítem

Título: Selection of maintenance, renewal and improvement projects in rail lines using the analytic network process
Autor: Montesinos-Valera, Jesús Aragonés-Beltrán, Pablo Pastor-Ferrando, Juan-Pascual
Entidad UPV: Universitat Politècnica de València. Departamento de Proyectos de Ingeniería - Departament de Projectes d'Enginyeria
Fecha difusión:
Resumen:
[EN] This paper addresses one of the most common problems that a railway infrastructure manager has to face: to prioritise a portfolio of maintenance, renewal and improvement (MR&I) projects in a railway network. This ...[+]
Palabras clave: Maintenance , Renewal & improvement , Rail line projects , Analytic network process , Project portfolio management , Project management
Derechos de uso: Reserva de todos los derechos
Fuente:
Structure and Infrastructure Engineering. (issn: 1573-2479 )
DOI: 10.1080/15732479.2017.1294189
Editorial:
Taylor & Francis
Versión del editor: https://doi.org/10.1080/15732479.2017.1294189
Agradecimientos:
The translation of this paper was funded by the Universitat Politecnica de Valencia.
Tipo: Artículo

References

Abril, M., Barber, F., Ingolotti, L., Salido, M. A., Tormos, P., & Lova, A. (2008). An assessment of railway capacity. Transportation Research Part E: Logistics and Transportation Review, 44(5), 774-806. doi:10.1016/j.tre.2007.04.001

Ahern, A., & Anandarajah, G. (2007). Railway projects prioritisation for investment: Application of goal programming. Transport Policy, 14(1), 70-80. doi:10.1016/j.tranpol.2006.10.003

Al-Harbi, K. M. A.-S. (2001). Application of the AHP in project management. International Journal of Project Management, 19(1), 19-27. doi:10.1016/s0263-7863(99)00038-1 [+]
Abril, M., Barber, F., Ingolotti, L., Salido, M. A., Tormos, P., & Lova, A. (2008). An assessment of railway capacity. Transportation Research Part E: Logistics and Transportation Review, 44(5), 774-806. doi:10.1016/j.tre.2007.04.001

Ahern, A., & Anandarajah, G. (2007). Railway projects prioritisation for investment: Application of goal programming. Transport Policy, 14(1), 70-80. doi:10.1016/j.tranpol.2006.10.003

Al-Harbi, K. M. A.-S. (2001). Application of the AHP in project management. International Journal of Project Management, 19(1), 19-27. doi:10.1016/s0263-7863(99)00038-1

Aragonés-Beltrán, P., Chaparro-González, F., Pastor-Ferrando, J. P., & Rodríguez-Pozo, F. (2010). An ANP-based approach for the selection of photovoltaic solar power plant investment projects. Renewable and Sustainable Energy Reviews, 14(1), 249-264. doi:10.1016/j.rser.2009.07.012

Aragonés-Beltrán, P., Chaparro-González, F., Pastor-Ferrando, J.-P., & Pla-Rubio, A. (2014). An AHP (Analytic Hierarchy Process)/ANP (Analytic Network Process)-based multi-criteria decision approach for the selection of solar-thermal power plant investment projects. Energy, 66, 222-238. doi:10.1016/j.energy.2013.12.016

Arif, F., Bayraktar, M. E., & Chowdhury, A. G. (2016). Decision Support Framework for Infrastructure Maintenance Investment Decision Making. Journal of Management in Engineering, 32(1), 04015030. doi:10.1061/(asce)me.1943-5479.0000372

Arunraj, N. S., & Maiti, J. (2010). Risk-based maintenance policy selection using AHP and goal programming. Safety Science, 48(2), 238-247. doi:10.1016/j.ssci.2009.09.005

Asensio, J., & Matas, A. (2008). Commuters’ valuation of travel time variability. Transportation Research Part E: Logistics and Transportation Review, 44(6), 1074-1085. doi:10.1016/j.tre.2007.12.002

Bana e Costa, C. A., & Oliveira, R. C. (2002). Assigning priorities for maintenance, repair and refurbishment in managing a municipal housing stock. European Journal of Operational Research, 138(2), 380-391. doi:10.1016/s0377-2217(01)00253-3

Bana e Costa, C. A., & Vansnick, J.-C. (2008). A critical analysis of the eigenvalue method used to derive priorities in AHP. European Journal of Operational Research, 187(3), 1422-1428. doi:10.1016/j.ejor.2006.09.022

Belton, V., & Stewart, T. J. (2002). Multiple Criteria Decision Analysis. doi:10.1007/978-1-4615-1495-4

Bouch, C. J., Roberts, C., & Amoore, J. (2010). Development of a common set of European high-level track maintenance cost categories. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 224(4), 327-335. doi:10.1243/09544097jrrt316

Bouyssou, D., Marchant, T., Pirlot, M., Perny, P., Tsoukiàs, A., & Vincke, P. (2000). Evaluation and Decision Models. International Series in Operations Research & Management Science. doi:10.1007/978-1-4615-1593-7

Evaluation and Decision Models with Multiple Criteria. (2006). International Series in Operations Research & Management Science. doi:10.1007/0-387-31099-1

Brans, J. P., Vincke, P., & Mareschal, B. (1986). How to select and how to rank projects: The Promethee method. European Journal of Operational Research, 24(2), 228-238. doi:10.1016/0377-2217(86)90044-5

Cantarelli, C. C., van Wee, B., Molin, E. J. E., & Flyvbjerg, B. (2012). Different cost performance: different determinants? Transport Policy, 22, 88-95. doi:10.1016/j.tranpol.2012.04.002

Cheng, C.-H. (1997). Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function. European Journal of Operational Research, 96(2), 343-350. doi:10.1016/s0377-2217(96)00026-4

Cheng, E. W. L., & Li, H. (2005). Analytic Network Process Applied to Project Selection. Journal of Construction Engineering and Management, 131(4), 459-466. doi:10.1061/(asce)0733-9364(2005)131:4(459)

Damart, S., & Roy, B. (2009). The uses of cost–benefit analysis in public transportation decision-making in France. Transport Policy, 16(4), 200-212. doi:10.1016/j.tranpol.2009.06.002

Durango-Cohen, P. L., & Madanat, S. M. (2008). Optimization of inspection and maintenance decisions for infrastructure facilities under performance model uncertainty: A quasi-Bayes approach. Transportation Research Part A: Policy and Practice, 42(8), 1074-1085. doi:10.1016/j.tra.2008.03.004

Durango-Cohen, P. L., & Sarutipand, P. (2009). Maintenance optimization for transportation systems with demand responsiveness. Transportation Research Part C: Emerging Technologies, 17(4), 337-348. doi:10.1016/j.trc.2009.01.001

Dyer, J. S. (1990). Remarks on the Analytic Hierarchy Process. Management Science, 36(3), 249-258. doi:10.1287/mnsc.36.3.249

Famurewa, S. M., Asplund, M., Rantatalo, M., Parida, A., & Kumar, U. (2014). Maintenance analysis for continuous improvement of railway infrastructure performance. Structure and Infrastructure Engineering, 11(7), 957-969. doi:10.1080/15732479.2014.921929

Famurewa, S. M., Stenström, C., Asplund, M., Galar, D., & Kumar, U. (2014). Composite indicator for railway infrastructure management. Journal of Modern Transportation, 22(4), 214-224. doi:10.1007/s40534-014-0051-1

Figueira, J., Greco, S., & Ehrogott, M. (2005). Multiple Criteria Decision Analysis: State of the Art Surveys. International Series in Operations Research & Management Science. doi:10.1007/b100605

FitzRoy, F., & Smith, I. (1995). The demand for rail transport in European countries. Transport Policy, 2(3), 153-158. doi:10.1016/0967-070x(95)96745-7

Furuya, A., & Madanat, S. (2013). Accounting for Network Effects in Railway Asset Management. Journal of Transportation Engineering, 139(1), 92-100. doi:10.1061/(asce)te.1943-5436.0000477

Gao, L., Guo, R., & Zhang, Z. (2013). An augmented Lagrangian decomposition approach for infrastructure maintenance and rehabilitation decisions under budget uncertainty. Structure and Infrastructure Engineering, 9(5), 448-457. doi:10.1080/15732479.2011.557388

Gerçek, H., Karpak, B., & Kılınçaslan, T. (2004). A multiple criteria approach for the evaluation of the rail transit networks in Istanbul. Transportation, 31(2), 203-228. doi:10.1023/b:port.0000016572.41816.d2

Goverde, R. M. P. (2010). A delay propagation algorithm for large-scale railway traffic networks. Transportation Research Part C: Emerging Technologies, 18(3), 269-287. doi:10.1016/j.trc.2010.01.002

Grimes, G. A., & Barkan, C. P. L. (2006). Cost-Effectiveness of Railway Infrastructure Renewal Maintenance. Journal of Transportation Engineering, 132(8), 601-608. doi:10.1061/(asce)0733-947x(2006)132:8(601)

Harker, P. T., & Vargas, L. G. (1990). Reply to «Remarks on the Analytic Hierarchy Process» by J. S. Dyer. Management Science, 36(3), 269-273. doi:10.1287/mnsc.36.3.269

Huisman, T., & Boucherie, R. J. (2001). Running times on railway sections with heterogeneous train traffic. Transportation Research Part B: Methodological, 35(3), 271-292. doi:10.1016/s0191-2615(99)00051-x

Hwang, C.-L., & Yoon, K. (1981). Multiple Attribute Decision Making. Lecture Notes in Economics and Mathematical Systems. doi:10.1007/978-3-642-48318-9

Ieda, H., Kanayama, Y., Ota, M., Yamazaki, T., & Okamura, T. (2001). How can the quality of rail services in Tokyo be further improved? Transport Policy, 8(2), 97-106. doi:10.1016/s0967-070x(01)00002-6

Ishizaka, A., & Labib, A. (2011). Review of the main developments in the analytic hierarchy process. Expert Systems with Applications. doi:10.1016/j.eswa.2011.04.143

Ishizaka, A., & Nemery, P. (2013). Multi-Criteria Decision Analysis. doi:10.1002/9781118644898

Ivanović, I., Grujičić, D., Macura, D., Jović, J., & Bojović, N. (2013). One approach for road transport project selection. Transport Policy, 25, 22-29. doi:10.1016/j.tranpol.2012.10.001

Johansson, P., & Nilsson, J.-E. (2004). An economic analysis of track maintenance costs. Transport Policy, 11(3), 277-286. doi:10.1016/j.tranpol.2003.12.002

Kabir, G., Sadiq, R., & Tesfamariam, S. (2013). A review of multi-criteria decision-making methods for infrastructure management. Structure and Infrastructure Engineering, 10(9), 1176-1210. doi:10.1080/15732479.2013.795978

Karanik, M., Wanderer, L., Gomez-Ruiz, J. A., & Pelaez, J. I. (2016). Reconstruction methods for AHP pairwise matrices: How reliable are they? Applied Mathematics and Computation, 279, 103-124. doi:10.1016/j.amc.2016.01.008

Karydas, D. M., & Gifun, J. F. (2006). A method for the efficient prioritization of infrastructure renewal projects. Reliability Engineering & System Safety, 91(1), 84-99. doi:10.1016/j.ress.2004.11.016

Kułakowski, K. (2015). Notes on order preservation and consistency in AHP. European Journal of Operational Research, 245(1), 333-337. doi:10.1016/j.ejor.2015.03.010

Kumar, G., & Maiti, J. (2012). Modeling risk based maintenance using fuzzy analytic network process. Expert Systems with Applications, 39(11), 9946-9954. doi:10.1016/j.eswa.2012.01.004

Lee, A. H. I., Chen, H. H., & Kang, H.-Y. (2009). Operations management of new project development: innovation, efficient, effective aspects. Journal of the Operational Research Society, 60(6), 797-809. doi:10.1057/palgrave.jors.2602605

LEE, A. H. I., KANG, H.-Y., & CHANG, C.-C. (2011). AN INTEGRATED INTERPRETIVE STRUCTURAL MODELING–FUZZY ANALYTIC NETWORK PROCESS–BENEFITS, OPPORTUNITIES, COSTS AND RISKS MODEL FOR SELECTING TECHNOLOGIES. International Journal of Information Technology & Decision Making, 10(05), 843-871. doi:10.1142/s0219622011004592

Liang, C., & Li, Q. (2008). Enterprise information system project selection with regard to BOCR. International Journal of Project Management, 26(8), 810-820. doi:10.1016/j.ijproman.2007.11.001

Macharis, C., & Bernardini, A. (2015). Reviewing the use of Multi-Criteria Decision Analysis for the evaluation of transport projects: Time for a multi-actor approach. Transport Policy, 37, 177-186. doi:10.1016/j.tranpol.2014.11.002

Mardani, A., Jusoh, A., & Zavadskas, E. K. (2015). Fuzzy multiple criteria decision-making techniques and applications – Two decades review from 1994 to 2014. Expert Systems with Applications, 42(8), 4126-4148. doi:10.1016/j.eswa.2015.01.003

Medury, A., & Madanat, S. (2013). Incorporating network considerations into pavement management systems: A case for approximate dynamic programming. Transportation Research Part C: Emerging Technologies, 33, 134-150. doi:10.1016/j.trc.2013.03.003

Millet, I., & Saaty, T. L. (2000). On the relativity of relative measures – accommodating both rank preservation and rank reversals in the AHP. European Journal of Operational Research, 121(1), 205-212. doi:10.1016/s0377-2217(99)00040-5

Nyström, B., & Söderholm, P. (2010). Selection of maintenance actions using the analytic hierarchy process (AHP): decision-making in railway infrastructure. Structure and Infrastructure Engineering, 6(4), 467-479. doi:10.1080/15732470801990209

Olsson, N. O. E., Økland, A., & Halvorsen, S. B. (2012). Consequences of differences in cost-benefit methodology in railway infrastructure appraisal—A comparison between selected countries. Transport Policy, 22, 29-35. doi:10.1016/j.tranpol.2012.03.005

Özgür, Ö. (2011). Performance analysis of rail transit investments in Turkey: İstanbul, Ankara, İzmir and Bursa. Transport Policy, 18(1), 147-155. doi:10.1016/j.tranpol.2010.07.004

Özkır, V., & Demirel, T. (2012). A fuzzy assessment framework to select among transportation investment projects in Turkey. Expert Systems with Applications, 39(1), 74-80. doi:10.1016/j.eswa.2011.06.051

Pardo-Bosch, F., & Aguado, A. (2014). Investment priorities for the management of hydraulic structures. Structure and Infrastructure Engineering, 11(10), 1338-1351. doi:10.1080/15732479.2014.964267

Phillips, L. D., & Bana e Costa, C. A. (2007). Transparent prioritisation, budgeting and resource allocation with multi-criteria decision analysis and decision conferencing. Annals of Operations Research, 154(1), 51-68. doi:10.1007/s10479-007-0183-3

Roy, B. (1991). The outranking approach and the foundations of electre methods. Theory and Decision, 31(1), 49-73. doi:10.1007/bf00134132

Saaty, T. L. (1990). How to make a decision: The analytic hierarchy process. European Journal of Operational Research, 48(1), 9-26. doi:10.1016/0377-2217(90)90057-i

Saaty, T. L. (2006). Rank from comparisons and from ratings in the analytic hierarchy/network processes. European Journal of Operational Research, 168(2), 557-570. doi:10.1016/j.ejor.2004.04.032

Saaty, T. L. (2008). Relative measurement and its generalization in decision making why pairwise comparisons are central in mathematics for the measurement of intangible factors the analytic hierarchy/network process. Revista de la Real Academia de Ciencias Exactas, Fisicas y Naturales. Serie A. Matematicas, 102(2), 251-318. doi:10.1007/bf03191825

SAATY, T. L., & SAGIR, M. (2009). EXTENDING THE MEASUREMENT OF TANGIBLES TO INTANGIBLES. International Journal of Information Technology & Decision Making, 08(01), 7-27. doi:10.1142/s0219622009003247

Saaty, T. L., & Shih, H.-S. (2009). Structures in decision making: On the subjective geometry of hierarchies and networks. European Journal of Operational Research, 199(3), 867-872. doi:10.1016/j.ejor.2009.01.064

Saaty, T. L., & Tran, L. T. (2007). On the invalidity of fuzzifying numerical judgments in the Analytic Hierarchy Process. Mathematical and Computer Modelling, 46(7-8), 962-975. doi:10.1016/j.mcm.2007.03.022

Saaty, T. L., & Vargas, L. G. (1993). Experiments on rank preservation and reversal in relative measurement. Mathematical and Computer Modelling, 17(4-5), 13-18. doi:10.1016/0895-7177(93)90171-t

Salem, O. M., Miller, R. A., Deshpande, A. S., & Arurkar, T. P. (2013). Multi-criteria decision-making system for selecting an effective plan for bridge rehabilitation. Structure and Infrastructure Engineering, 9(8), 806-816. doi:10.1080/15732479.2011.615843

Seyedshohadaie, S. R., Damnjanovic, I., & Butenko, S. (2010). Risk-based maintenance and rehabilitation decisions for transportation infrastructure networks. Transportation Research Part A: Policy and Practice, 44(4), 236-248. doi:10.1016/j.tra.2010.01.005

Shattuck, M., & Wagner, C. (2016). Peter Fishburn’s analysis of ambiguity. Theory and Decision, 81(2), 153-165. doi:10.1007/s11238-016-9534-3

Sohn, K. (2008). A systematic decision criterion for the elimination of useless overpasses. Transportation Research Part A: Policy and Practice, 42(8), 1043-1055. doi:10.1016/j.tra.2008.03.003

Thomas, L. J., Rhind, D. J. A., & Robinson, K. J. (2005). Rail passenger perceptions of risk and safety and priorities for improvement. Cognition, Technology & Work, 8(1), 67-75. doi:10.1007/s10111-005-0021-9

Tsamboulas, D. A. (2007). A tool for prioritizing multinational transport infrastructure investments. Transport Policy, 14(1), 11-26. doi:10.1016/j.tranpol.2006.06.001

Vaidya, O. S., & Kumar, S. (2006). Analytic hierarchy process: An overview of applications. European Journal of Operational Research, 169(1), 1-29. doi:10.1016/j.ejor.2004.04.028

Wallenius, J., Dyer, J. S., Fishburn, P. C., Steuer, R. E., Zionts, S., & Deb, K. (2008). Multiple Criteria Decision Making, Multiattribute Utility Theory: Recent Accomplishments and What Lies Ahead. Management Science, 54(7), 1336-1349. doi:10.1287/mnsc.1070.0838

[-]

recommendations

 