Mostrar el registro sencillo del ítem
dc.contributor.author | Gomez-Cabrera, Adriana | es_ES |
dc.contributor.author | Sanz-Benlloch, María Amalia | es_ES |
dc.contributor.author | Montalbán-Domingo, Laura | es_ES |
dc.contributor.author | Ponz Tienda, José Luis | es_ES |
dc.contributor.author | Pellicer, Eugenio | es_ES |
dc.date.accessioned | 2020-12-08T04:31:54Z | |
dc.date.available | 2020-12-08T04:31:54Z | |
dc.date.issued | 2020-09-09 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/156561 | |
dc.description.abstract | [EN] Rural roads play an indispensable role in economic and social well-being, especially in developing countries, contributing to achieving the Sustainable Development Goals. For this reason, it is necessary to plan these projects properly to guarantee their success. In this line, the objective of this research is to identify significant variables generating overruns in time and cost using empirical data of 535 rural road projects in Colombia from 2015 to 2018. Bivariate analysis, with statistical tools like Spearman's Rho and Kruskal-Wallis, allowed identifying that higher values of variables like budget and project intensity are related to higher deviations in cost and time. Additionally, it was found that projects with shorter durations are reporting higher time overruns. The worst performers are projects executed in the year that council mayors start their terms, those developed in municipalities with more resources, and those awarded using a competitive bidding process. Multivariate analysis, through Random Forest, assessed the effect of considering all variables interacting simultaneously and ranking them in order of importance. The results demonstrated a relationship between cost and time performance, and that numerical variables are more significant than the categorical ones. This study contributes to a better understanding of the causes of delays and cost overruns on rural roads, providing useful insight for researchers and industry practitioners. | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | MDPI AG | es_ES |
dc.relation.ispartof | Sustainability | es_ES |
dc.rights | Reconocimiento (by) | es_ES |
dc.subject | Rural roads | es_ES |
dc.subject | Cost overruns | es_ES |
dc.subject | Time overruns | es_ES |
dc.subject | Public projects | es_ES |
dc.subject | Project management | es_ES |
dc.subject.classification | CONSTRUCCIONES ARQUITECTONICAS | es_ES |
dc.subject.classification | INGENIERIA DE LA CONSTRUCCION | es_ES |
dc.subject.classification | PROYECTOS DE INGENIERIA | es_ES |
dc.title | Identification of Factors Affecting the Performance of Rural Road Projects in Colombia | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.3390/su12187377 | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Construcciones Arquitectónicas - Departament de Construccions Arquitectòniques | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil | es_ES |
dc.description.bibliographicCitation | Gomez-Cabrera, A.; Sanz-Benlloch, MA.; Montalbán-Domingo, L.; Ponz Tienda, JL.; Pellicer, E. (2020). Identification of Factors Affecting the Performance of Rural Road Projects in Colombia. Sustainability. 12(18):1-18. https://doi.org/10.3390/su12187377 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | https://doi.org/10.3390/su12187377 | es_ES |
dc.description.upvformatpinicio | 1 | es_ES |
dc.description.upvformatpfin | 18 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 12 | es_ES |
dc.description.issue | 18 | es_ES |
dc.identifier.eissn | 2071-1050 | es_ES |
dc.relation.pasarela | S\417764 | es_ES |
dc.description.references | http://www.slocat.net/wp-content/uploads/legacy/u15/contribution_of_rural_transport_to_the_sustainable_development_goals_paper_final.pdf | es_ES |
dc.description.references | Burrow, M. P. N., Evdorides, H., Ghataora, G. S., Petts, R., & Snaith, M. S. (2016). The evidence for rural road technology in low-income countries. Proceedings of the Institution of Civil Engineers - Transport, 169(6), 366-377. doi:10.1680/jtran.15.00089 | es_ES |
dc.description.references | Muzira, S., de Díaz, D. H., & Mota, B. F. J. (2015). Rethinking Rural Road Infrastructure Delivery. Transportation Research Record: Journal of the Transportation Research Board, 2474(1), 195-202. doi:10.3141/2474-23 | es_ES |
dc.description.references | FUNDACION PAZ Y RECONCILIACIONhttps://pares.com.co/2016/07/28/las-vias-terciarias-del-postconflicto/ | es_ES |
dc.description.references | Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management, 21(5), 321-326. doi:10.1016/s0263-7863(02)00055-8 | es_ES |
dc.description.references | Flyvbjerg, B., Skamris holm, M. K., & Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71-88. doi:10.1080/01441640309904 | es_ES |
dc.description.references | Kumaraswamy, M. M., & Chan, D. W. M. (1998). Contributors to construction delays. Construction Management and Economics, 16(1), 17-29. doi:10.1080/014461998372556 | es_ES |
dc.description.references | Iyer, K. C., & Jha, K. N. (2006). Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Journal of Construction Engineering and Management, 132(8), 871-881. doi:10.1061/(asce)0733-9364(2006)132:8(871) | es_ES |
dc.description.references | Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating Costs in Public Works Projects:Error or Lie? Journal of the American Planning Association, 68(3), 279-295. doi:10.1080/01944360208976273 | es_ES |
dc.description.references | Shane, J. S., Molenaar, K. R., Anderson, S., & Schexnayder, C. (2009). Construction Project Cost Escalation Factors. Journal of Management in Engineering, 25(4), 221-229. doi:10.1061/(asce)0742-597x(2009)25:4(221) | es_ES |
dc.description.references | Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522-531. doi:10.1016/j.ijproman.2008.07.003 | es_ES |
dc.description.references | Mahamid, I., Bruland, A., & Dmaidi, N. (2012). Causes of Delay in Road Construction Projects. Journal of Management in Engineering, 28(3), 300-310. doi:10.1061/(asce)me.1943-5479.0000096 | es_ES |
dc.description.references | Santoso, D. S., & Soeng, S. (2016). Analyzing Delays of Road Construction Projects in Cambodia: Causes and Effects. Journal of Management in Engineering, 32(6), 05016020. doi:10.1061/(asce)me.1943-5479.0000467 | es_ES |
dc.description.references | Yang, J.-B., & Ou, S.-F. (2008). Using structural equation modeling to analyze relationships among key causes of delay in construction. Canadian Journal of Civil Engineering, 35(4), 321-332. doi:10.1139/l07-101 | es_ES |
dc.description.references | Bhargava, A., Anastasopoulos, P. C., Labi, S., Sinha, K. C., & Mannering, F. L. (2010). Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts. Journal of Construction Engineering and Management, 136(11), 1207-1218. doi:10.1061/(asce)co.1943-7862.0000225 | es_ES |
dc.description.references | Huo, T., Ren, H., Cai, W., Shen, G. Q., Liu, B., Zhu, M., & Wu, H. (2018). Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong. Journal of Construction Engineering and Management, 144(3), 05018001. doi:10.1061/(asce)co.1943-7862.0001444 | es_ES |
dc.description.references | FLYVBJERG, B., SKAMRIS HOLM, M. K., & BUHL, S. L. (2004). What Causes Cost Overrun in Transport Infrastructure Projects? Transport Reviews, 24(1), 3-18. doi:10.1080/0144164032000080494a | es_ES |
dc.description.references | Odeck, J. (2004). Cost overruns in road construction—what are their sizes and determinants? Transport Policy, 11(1), 43-53. doi:10.1016/s0967-070x(03)00017-9 | es_ES |
dc.description.references | Cantarelli, C. C., Molin, E. J. E., van Wee, B., & Flyvbjerg, B. (2012). Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases. Transport Policy, 22, 49-56. doi:10.1016/j.tranpol.2012.04.001 | es_ES |
dc.description.references | Hauke, J., & Kossowski, T. (2011). Comparison of Values of Pearson’s and Spearman’s Correlation Coefficients on the Same Sets of Data. Quaestiones Geographicae, 30(2), 87-93. doi:10.2478/v10117-011-0021-1 | es_ES |
dc.description.references | De Winter, J. C. F., Gosling, S. D., & Potter, J. (2016). Comparing the Pearson and Spearman correlation coefficients across distributions and sample sizes: A tutorial using simulations and empirical data. Psychological Methods, 21(3), 273-290. doi:10.1037/met0000079 | es_ES |
dc.description.references | Gatignon, H. (2009). Introduction. Statistical Analysis of Management Data, 1-8. doi:10.1007/978-1-4419-1270-1_1 | es_ES |
dc.description.references | Breiman, L. (2001). Machine Learning, 45(1), 5-32. doi:10.1023/a:1010933404324 | es_ES |
dc.description.references | Auret, L., & Aldrich, C. (2012). Interpretation of nonlinear relationships between process variables by use of random forests. Minerals Engineering, 35, 27-42. doi:10.1016/j.mineng.2012.05.008 | es_ES |
dc.description.references | Random Forest Regression-Towards Data Sciencehttps://towardsdatascience.com/random-forest-and-its-implementation-71824ced454f | es_ES |
dc.description.references | Grömping, U. (2009). Variable Importance Assessment in Regression: Linear Regression versus Random Forest. The American Statistician, 63(4), 308-319. doi:10.1198/tast.2009.08199 | es_ES |
dc.description.references | James, G., Witten, D., Hastie, T., & Tibshirani, R. (2013). Introduction. An Introduction to Statistical Learning, 1-14. doi:10.1007/978-1-4614-7138-7_1 | es_ES |
dc.description.references | Oshiro, T. M., Perez, P. S., & Baranauskas, J. A. (2012). How Many Trees in a Random Forest? Lecture Notes in Computer Science, 154-168. doi:10.1007/978-3-642-31537-4_13 | es_ES |
dc.description.references | Park, Y., & Papadopoulou, T. C. (2012). Causes of cost overruns in transport infrastructure projects in Asia. Built Environment Project and Asset Management, 2(2), 195-216. doi:10.1108/20441241211280873 | es_ES |
dc.description.references | Gunduz, M., Nielsen, Y., & Ozdemir, M. (2015). Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects. Journal of Management in Engineering, 31(4), 04014055. doi:10.1061/(asce)me.1943-5479.0000261 | es_ES |
dc.description.references | Bagaya, O., & Song, J. (2016). Empirical Study of Factors Influencing Schedule Delays of Public Construction Projects in Burkina Faso. Journal of Management in Engineering, 32(5), 05016014. doi:10.1061/(asce)me.1943-5479.0000443 | es_ES |
dc.description.references | Lo, T. Y., Fung, I. W., & Tung, K. C. (2006). Construction Delays in Hong Kong Civil Engineering Projects. Journal of Construction Engineering and Management, 132(6), 636-649. doi:10.1061/(asce)0733-9364(2006)132:6(636) | es_ES |
dc.description.references | Kaka, A., & Price, A. D. F. (1991). Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), 383-400. doi:10.1080/01446199100000030 | es_ES |
dc.description.references | Kumaraswamy ∗, M. M., & Chan, D. W. M. (1995). Determinants of construction duration. Construction Management and Economics, 13(3), 209-217. doi:10.1080/01446199500000025 | es_ES |
dc.subject.ods | 10.- Reducir las desigualdades entre países y dentro de ellos | es_ES |
dc.subject.ods | 09.- Desarrollar infraestructuras resilientes, promover la industrialización inclusiva y sostenible, y fomentar la innovación | es_ES |