- -

Implementación de la metodología Lean Manufacturing en el contrato de mantenimiento de los centros de Atención Primaria del Departamento de Salud de la Ribera

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Implementación de la metodología Lean Manufacturing en el contrato de mantenimiento de los centros de Atención Primaria del Departamento de Salud de la Ribera

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Cantó Perelló, Julián es_ES
dc.contributor.author Colombo Martí, Miguel Ángel es_ES
dc.coverage.spatial east=-0.4178164; north=39.1602849; name=Departamento de Salud de la Ribera, km 1, Ctra. Corbera, 46600 Alzira, Valencia, Espanya es_ES
dc.date.accessioned 2021-10-20T14:13:28Z
dc.date.available 2021-10-20T14:13:28Z
dc.date.created 2021-09-22
dc.date.issued 2021-10-20 es_ES
dc.identifier.uri http://hdl.handle.net/10251/175129
dc.description.abstract [ES] El mantenimiento integral de edificios es especialmente crítico en instalaciones sanitarias. Una buena gestión de este permite que las instalaciones puedan ser utilizadas con el mayor grado de seguridad y comodidad por los usuarios. El contrato de mantenimiento de los Centros de Atención Primaria del Departamento de Salud de la Ribera supone gestionar que diversos sistemas, como el sistema eléctrico de baja tensión, climatización, protección contra incendios, suministro de agua potable y ACS, saneamiento, etc. funcionen correctamente y que se realice el mantenimiento preventivo técnico-legal a cada sistema que aplique. La dificultad reside en que este contrato engloba 15 Centros de salud y 35 Consultorios médicos, distribuidos entre las diferentes localidades de la zona. El tiempo invertido en desplazamientos y la distribución de las órdenes de trabajo correctivas y preventivas entre la plantilla son elementos clave. El no realizar los mantenimientos correspondientes en el plazo establecido en el contrato puede suponer una sanción a la empresa mantenedora por parte del cliente, además de poder mermar las prestaciones del Centro de Atención Primaria. Conociendo este problema, este proyecto plantea en primer lugar la medición de los tiempos de trabajo y el análisis de estos datos. Seguido a ello, se fijarán objetivos en base a nuestros datos de partida, y se realizarán propuestas basadas en los principios del Lean Manufacturing para la mejora de los tiempos productivos sin incrementar los costes. Por último, realizaremos una nueva medición y valoraremos el cumplimiento de los objetivos marcados. es_ES
dc.description.abstract [EN] Integral building maintenance is especially critical in healthcare facilities. Good management of this allows the facilities to be used with the highest degree of safety and comfort by users. The maintenance contract for the Primary Care Centers of the La Ribera Health Department involves ensuring that various systems, such as the low voltage electrical system, air conditioning, fire protection, drinking water and DHW supply, sanitation, etc. work correctly and that the technical-legal preventive maintenance is carried out for each applicable system. The difficulty lies in the fact that this contract covers 15 health centers and 35 medical offices, distributed among the different localities of the area. The time invested in travel and the distribution of corrective and preventive work orders among the staff are key elements. Failure to carry out the corresponding maintenance within the period established in the contract may result in a sanction to the maintenance company by the client, in addition to being able to reduce the performance of the Primary Care Center. Knowing this problem, this project proposes first of all the measurement of the working times and the analysis of this data. Secondly, we will set objectives based on our initial data, and we will make proposals based on the principles of Lean Manufacturing to improve production times without increasing costs. Finally, we will carry out a new measurement and we will evaluate the fulfillment of the objectives set. es_ES
dc.format.extent 869 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Mantenimiento de edificios es_ES
dc.subject Mantenimiento de centros sanitarios es_ES
dc.subject Lean Manufacturing es_ES
dc.subject Mantenimiento preventivo es_ES
dc.subject Mantenimiento correctivo es_ES
dc.subject Gestión de contratos de mantenimiento es_ES
dc.subject KPIs es_ES
dc.subject Building maintenance es_ES
dc.subject Healthcare facility maintenance es_ES
dc.subject Preventive maintenance es_ES
dc.subject Corrective maintenance es_ES
dc.subject Maintenance contract management es_ES
dc.subject.classification INGENIERIA DE LA CONSTRUCCION es_ES
dc.subject.other Máster Universitario en Ingeniería del Mantenimiento-Màster Universitari en Enginyeria del Manteniment es_ES
dc.title Implementación de la metodología Lean Manufacturing en el contrato de mantenimiento de los centros de Atención Primaria del Departamento de Salud de la Ribera es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingeniería del Diseño - Escola Tècnica Superior d'Enginyeria del Disseny es_ES
dc.description.bibliographicCitation Colombo Martí, MÁ. (2021). Implementación de la metodología Lean Manufacturing en el contrato de mantenimiento de los centros de Atención Primaria del Departamento de Salud de la Ribera. Universitat Politècnica de València. http://hdl.handle.net/10251/175129 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\145286 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem