- -

THE GENERIC MATERIALS AND OPERATIONS PLANNING (GMOP) PROBLEM SOLVED ITERATIVELY: A CASE STUDY IN MULTI-SITE CONTEXT

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

THE GENERIC MATERIALS AND OPERATIONS PLANNING (GMOP) PROBLEM SOLVED ITERATIVELY: A CASE STUDY IN MULTI-SITE CONTEXT

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Maheut ., Julien Philippe es_ES
dc.contributor.author García Sabater, José Pedro es_ES
dc.contributor.author Mula, Josefa es_ES
dc.date.accessioned 2013-07-01T08:31:49Z
dc.date.issued 2012
dc.identifier.isbn 978-3-642-33980-6
dc.identifier.issn 1868-4238
dc.identifier.uri http://hdl.handle.net/10251/30298
dc.description.abstract This paper addresses the Generic Materials and Operations Planning (GMOP) problem, a multi-site operations planning problem based on the ¿stroke¿ concept. The problem considers a multinational company subject to positive and negative backlogs imposed by using returnable racks that have to be filled by end products and transported to customers, alternative operations (purchase, transformation and transport), different BOM structures given the different operation types (injection operations, assembly operations) performed in the various factories of the supply chain, and capacitated production resources. This paper describes and defines the ¿stroke¿ construct that mathematically models the relationships between operations and materials. The mathematical modelling approach is provided, as is a brief description of an operations planning tool that has been implemented. Furthermore, some results obtained in a first-tier level supplier of the automotive industry have been introduced. es_ES
dc.language Inglés es_ES
dc.publisher Springer es_ES
dc.relation.ispartof IFIP Advances in Information and Communication Technology es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject.classification INGENIERÍA DE ORGANIZACIÓN (UPV) es_ES
dc.subject.classification ORGANIZACION DE EMPRESAS es_ES
dc.title THE GENERIC MATERIALS AND OPERATIONS PLANNING (GMOP) PROBLEM SOLVED ITERATIVELY: A CASE STUDY IN MULTI-SITE CONTEXT es_ES
dc.type Capítulo de libro es_ES
dc.embargo.lift 10000-01-01
dc.embargo.terms forever es_ES
dc.identifier.doi 10.1007/978-3-642-33980-6_8
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Organización de Empresas - Departament d'Organització d'Empreses es_ES
dc.description.bibliographicCitation Maheut ., JP.; García Sabater, JP.; Mula, J. (2012). THE GENERIC MATERIALS AND OPERATIONS PLANNING (GMOP) PROBLEM SOLVED ITERATIVELY: A CASE STUDY IN MULTI-SITE CONTEXT. En IFIP Advances in Information and Communication Technology. Springer. 384:66-73. doi:10.1007/978-3-642-33980-6_8 es_ES
dc.description.accrualMethod S es_ES
dc.relation.conferencename IFIP WG 5.7 International Conference, APMS 2011 es_ES
dc.relation.conferencedate September 26-28, 2011 es_ES
dc.relation.conferenceplace Stavanger, Norway es_ES
dc.relation.publisherversion http://dx.doi.org/10.1007/978-3-642-33980-6_8 es_ES
dc.description.upvformatpinicio 66 es_ES
dc.description.upvformatpfin 73 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 384 es_ES
dc.relation.senia 233237
dc.description.references Caridi, M., Sianesi, A.: Trends in planning and control systems: APS - ERP Integration. In: Mertins, K., Krause, O., Schallock, B. (eds.) Global Production Management. Kluwer Academic Publisher (1999) es_ES
dc.description.references Dudek, G.: Collaborative planning in supply chains. A negotiation-based approach. Springer, Berlin (2004) es_ES
dc.description.references Garcia-Sabater, J.P., Maheut, J., Garcia-Sabater, J.J.: A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler. Flexible Services and Manufacturing Journal 24, 171–209 (2012) es_ES
dc.description.references Garcia-Sabater, J.P., Maheut, J., Marin-Garcia, J.A.: A new formulation technique to model Materials and Operations Planning: the Generic Materials and Operations Planning (GMOP) Problem. European J. Industrial Engineering 7 (in press, 2013) es_ES
dc.description.references Günther, H.O., Meyr, H.: Supply chain planning and Advanced Planning Systems. OR Spectrum 31, 1–3 (2009) es_ES
dc.description.references Maheut, J., Garcia-Sabater, J.P.: La Matriz de Operaciones y Materiales y la Matriz de Operaciones y Recursos, un nuevo enfoque para resolver el problema GMOP basado en el concepto del Stroke. Dirección y Organización 45, 46–57 (2011) es_ES
dc.description.references Maheut, J., Garcia-Sabater, J.P., Mula, J.: A supply Chain Operations Lot-Sizing and Scheduling Model with Alternative Operations. In: Sethi, S.P., Bogataj, M., Ros-McDonnell, L. (eds.) Proceedings of Industrial Engineering: Innovative Networks, 5th International Conference on Industrial Engineering and Industrial Management, CIO 2011, Cartagena, Spain. ch. 35, Part 5, pp. 309–316. Springer, London (2011), doi:10.1007/978-1-4471-2321-73_5 es_ES
dc.description.references Stadtler, H.: Supply chain management and advanced planning–basics, overview and challenges. European Journal of Operational Research 163, 575–588 (2005) es_ES
dc.description.references Stadtler, H., Kilger, C.: Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies. Springer (2002) es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem