Mostrar el registro sencillo del ítem
dc.contributor.author | Maheut ., Julien Philippe | es_ES |
dc.contributor.author | García Sabater, José Pedro | es_ES |
dc.contributor.author | Mula, Josefa | es_ES |
dc.date.accessioned | 2013-07-01T08:31:49Z | |
dc.date.issued | 2012 | |
dc.identifier.isbn | 978-3-642-33980-6 | |
dc.identifier.issn | 1868-4238 | |
dc.identifier.uri | http://hdl.handle.net/10251/30298 | |
dc.description.abstract | This paper addresses the Generic Materials and Operations Planning (GMOP) problem, a multi-site operations planning problem based on the ¿stroke¿ concept. The problem considers a multinational company subject to positive and negative backlogs imposed by using returnable racks that have to be filled by end products and transported to customers, alternative operations (purchase, transformation and transport), different BOM structures given the different operation types (injection operations, assembly operations) performed in the various factories of the supply chain, and capacitated production resources. This paper describes and defines the ¿stroke¿ construct that mathematically models the relationships between operations and materials. The mathematical modelling approach is provided, as is a brief description of an operations planning tool that has been implemented. Furthermore, some results obtained in a first-tier level supplier of the automotive industry have been introduced. | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Springer | es_ES |
dc.relation.ispartof | IFIP Advances in Information and Communication Technology | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject.classification | INGENIERÍA DE ORGANIZACIÓN (UPV) | es_ES |
dc.subject.classification | ORGANIZACION DE EMPRESAS | es_ES |
dc.title | THE GENERIC MATERIALS AND OPERATIONS PLANNING (GMOP) PROBLEM SOLVED ITERATIVELY: A CASE STUDY IN MULTI-SITE CONTEXT | es_ES |
dc.type | Capítulo de libro | es_ES |
dc.embargo.lift | 10000-01-01 | |
dc.embargo.terms | forever | es_ES |
dc.identifier.doi | 10.1007/978-3-642-33980-6_8 | |
dc.rights.accessRights | Cerrado | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Organización de Empresas - Departament d'Organització d'Empreses | es_ES |
dc.description.bibliographicCitation | Maheut ., JP.; García Sabater, JP.; Mula, J. (2012). THE GENERIC MATERIALS AND OPERATIONS PLANNING (GMOP) PROBLEM SOLVED ITERATIVELY: A CASE STUDY IN MULTI-SITE CONTEXT. En IFIP Advances in Information and Communication Technology. Springer. 384:66-73. doi:10.1007/978-3-642-33980-6_8 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.conferencename | IFIP WG 5.7 International Conference, APMS 2011 | es_ES |
dc.relation.conferencedate | September 26-28, 2011 | es_ES |
dc.relation.conferenceplace | Stavanger, Norway | es_ES |
dc.relation.publisherversion | http://dx.doi.org/10.1007/978-3-642-33980-6_8 | es_ES |
dc.description.upvformatpinicio | 66 | es_ES |
dc.description.upvformatpfin | 73 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 384 | es_ES |
dc.relation.senia | 233237 | |
dc.description.references | Caridi, M., Sianesi, A.: Trends in planning and control systems: APS - ERP Integration. In: Mertins, K., Krause, O., Schallock, B. (eds.) Global Production Management. Kluwer Academic Publisher (1999) | es_ES |
dc.description.references | Dudek, G.: Collaborative planning in supply chains. A negotiation-based approach. Springer, Berlin (2004) | es_ES |
dc.description.references | Garcia-Sabater, J.P., Maheut, J., Garcia-Sabater, J.J.: A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler. Flexible Services and Manufacturing Journal 24, 171–209 (2012) | es_ES |
dc.description.references | Garcia-Sabater, J.P., Maheut, J., Marin-Garcia, J.A.: A new formulation technique to model Materials and Operations Planning: the Generic Materials and Operations Planning (GMOP) Problem. European J. Industrial Engineering 7 (in press, 2013) | es_ES |
dc.description.references | Günther, H.O., Meyr, H.: Supply chain planning and Advanced Planning Systems. OR Spectrum 31, 1–3 (2009) | es_ES |
dc.description.references | Maheut, J., Garcia-Sabater, J.P.: La Matriz de Operaciones y Materiales y la Matriz de Operaciones y Recursos, un nuevo enfoque para resolver el problema GMOP basado en el concepto del Stroke. Dirección y Organización 45, 46–57 (2011) | es_ES |
dc.description.references | Maheut, J., Garcia-Sabater, J.P., Mula, J.: A supply Chain Operations Lot-Sizing and Scheduling Model with Alternative Operations. In: Sethi, S.P., Bogataj, M., Ros-McDonnell, L. (eds.) Proceedings of Industrial Engineering: Innovative Networks, 5th International Conference on Industrial Engineering and Industrial Management, CIO 2011, Cartagena, Spain. ch. 35, Part 5, pp. 309–316. Springer, London (2011), doi:10.1007/978-1-4471-2321-73_5 | es_ES |
dc.description.references | Stadtler, H.: Supply chain management and advanced planning–basics, overview and challenges. European Journal of Operational Research 163, 575–588 (2005) | es_ES |
dc.description.references | Stadtler, H., Kilger, C.: Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies. Springer (2002) | es_ES |