- -

Instalación, integración y puesta en servicio de nuevos elementos de la red EUTRAN

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Instalación, integración y puesta en servicio de nuevos elementos de la red EUTRAN

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Cardona Marcet, Narciso es_ES
dc.contributor.author Miravalls Ferrandis, Carmina es_ES
dc.date.accessioned 2013-11-14T13:25:44Z
dc.date.available 2013-11-14T13:25:44Z
dc.date.created 2013-09-20
dc.date.issued 2013-11-14
dc.identifier.uri http://hdl.handle.net/10251/33597
dc.description.abstract El despliegue de la nueva red Long Term Evolution (LTE) de Cuarta Generación (4G) de telefonía móvil hace necesaria la modernización de la red de acceso y transmisión. Esto implica un proceso de instalación de nuevos equipos, y la integración de esta nueva tecnología con la ya existente. En este sentido, el presente Proyecto Fin de Carrera tiene como objetivo la puesta en servicio de un nuevo eNodeB Huawei en la red de acceso radio y su integración con el Evolved Packet Core (EPC) de Vodafone España. Por tanto, se detalla el procedimiento tanto remoto como local necesario para alcanzar este objetivo. La metodología utilizada en el proyecto consistió en una primera fase de investigación teórica, no solo de las especificaciones del sistema LTE sino también de los distintos parámetros referentes a la gestión de los recursos radio. Posteriormente se emprendió la fase de preparación y procedimiento de integración del nuevo nodo de la red LTE escogiendo la como zona Sur del país para el despliegue, durante esta fase fueron surgiendo distintos problemas que se fueron corrigiendo y recopilando para posteriormente ceder estas recomendaciones a los grupos de trabajo implicados. Como resultado general del proyecto se logró alcanzar el hito Ready for Service (RFS), así como un alto dominio de las herramientas utilizadas. es_ES
dc.description.abstract The deployment of the new Fourth Generation Long Term Evolution network of mobile telephony makes necessary the updating of the access and transmission network. This requires the installation of new equipment, and the integration of this new technology with the existing one. In this sense, the objective of the present Final Year Project is to bring into use the new eNodeB Huawei within the radio access network and integrate it with the Vodafone Spain Evolved Packet Core. Thus, the procedure required for achieving these objectives is detailed both in remote and local. The used methodology was divided in several stages. The first one was focused on the theoretical research of the issue, not only the ones related to the specification of the LTE system but others parameters related to the management of radio resources. Then, the preparation and integration of the new LTE network node was carried out. The southern area of Spain was the location chosen for the deployment. During this stage, several issues were corrected as soon as they appeared. The information about these problems was gathered in order to provide some recommendations to other groups involved in the project, and save them time and work. As a general result, it was possible to achieve the milestone Ready For Service. Furthermore, a high command of the employed tools was attained. es_ES
dc.format.extent 85 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject LTE es_ES
dc.subject despliegue es_ES
dc.subject eNodoB es_ES
dc.subject integración es_ES
dc.subject troubleshooting es_ES
dc.subject deployment es_ES
dc.subject integration es_ES
dc.subject.other Ingeniería en Telecomunicación-Enginyeria en Telecomunicació es_ES
dc.title Instalación, integración y puesta en servicio de nuevos elementos de la red EUTRAN es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Telecomunicación - Escola Tècnica Superior d'Enginyers de Telecomunicació es_ES
dc.description.bibliographicCitation Miravalls Ferrandis, C. (2013). Instalación, integración y puesta en servicio de nuevos elementos de la red EUTRAN. http://hdl.handle.net/10251/33597. es_ES
dc.description.accrualMethod Archivo delegado es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem