- -

Seguimiento de ejecución de la rehabilitación de edificio de 4 viviendas y bajo comercial en Valencia

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Seguimiento de ejecución de la rehabilitación de edificio de 4 viviendas y bajo comercial en Valencia

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Albiol Ibáñez, José Ramón es_ES
dc.contributor.author Giménez Cueco, José es_ES
dc.coverage.spatial east=-0.3769375; north=39.4740625; name=Plaça de Lope de Vega, 8, 46001 València, Valencia, Espanya
dc.date.accessioned 2015-03-17T16:57:01Z
dc.date.available 2015-03-17T16:57:01Z
dc.date.created 2014-09-12
dc.date.issued 2015-03-17
dc.identifier.uri http://hdl.handle.net/10251/48098
dc.description.abstract TFG en modalidad convenio con empresa. Empresa : Estudios Métodos de la Restauración es_ES
dc.description.abstract [ES] El presente Proyecto Fin de Grado consiste en el seguimiento de ejecución de la rehabilitación de edificio de 4 viviendas y bajo comercial en Valencia, para ello realizamos un previo estudio del proyecto original para analizar sus carencias, incoherencias e incongruencias a fin de detectar, con antelación, los fallos u olvidos para que no sean trasladados a la ejecución de la obra. Junto con dicho análisis desarrollamos un seguimiento diario de la obra desde diferentes perspectivas: constructiva, con la finalidad de conocer ideas, matices y singularidades de la obra que únicamente en la realidad del día a día y del estar al pie de obra se pueden adquirir; de calidad, con el objetivo de analizar y completar los diferentes documentos para cumplir con las instrucciones y normativas marcadas; de seguridad y salud, comprobando que en la documentación del proyecto se reflejen todas las líneas preventivas a poner en practica durante el transcurso de la obra con el fin de garantizar un elevado grado de seguridad; de programación y de la estructura económica, analizando las desviaciones que se producen entre la previsión y los datos reales obtenidos, exponiendo sus causas y proponiendo medidas correctoras. Para la confección de dicho proyecto nos hemos ayudado de diversas herramientas entre ellas la documentación facilitada por la empresa como (proyecto básico de ejecución de la obra, programación prevista, plan de seguridad y salud…) y de los conocimientos previos adquiridos durante el desarrollo de la carrera profesional. es_ES
dc.description.abstract [EN] This undergraduate program final project consists of an execution tracing of a building rehabilitation, which is integrated by four housing and a commercial lounge and located in Valencia. To develop this tracing a previous study of the original project has been done, to analyze its deficiencies and inconsistencies, in order to detect any failures or omissions in advance, achieving a work performance free of them. Along with this analysis there is also a daily work’s monitoring from different perspectives: constructive, with the target of knowing ideas, refinements and singularities of the work which can be acquired only on site and day by day; of quality, to analyze and complete the different documents needed to accomplish the established instructions and regulations; of safety and health, checking the project documentation reflects all the preventive lines to put into practice during the work performance in order to guarantee a high safety level; and finally of schedule and economic structure, following the deviations produced between the prevision and the obtained real data, exposing their causes and proposing corrective actions. During the fulfillment of the mentioned project several support tools have been used; among these the documentation provided by the company, i.e. the work execution basic project, the expected schedule and the safety and health plan, and also the background learned and acquired during the professional degree development. es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Rehabilitación de edificios es_ES
dc.subject Viviendas es_ES
dc.subject Proyectos de construcción es_ES
dc.subject Proyectos de arquitectura es_ES
dc.subject Control de calidad es_ES
dc.subject Buildings, Repair and reconstruction es_ES
dc.subject Dwellings es_ES
dc.subject Construction projects es_ES
dc.subject Quality control es_ES
dc.subject.classification CONSTRUCCIONES ARQUITECTONICAS es_ES
dc.subject.other Grado en Ingeniería de Edificación-Grau en Enginyeria d'Edificació es_ES
dc.title Seguimiento de ejecución de la rehabilitación de edificio de 4 viviendas y bajo comercial en Valencia es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Gestión en la Edificación - Escola Tècnica Superior de Gestió en l'Edificació es_ES
dc.description.bibliographicCitation Giménez Cueco, J. (2014). Seguimiento de ejecución de la rehabilitación de edificio de 4 viviendas y bajo comercial en Valencia. http://hdl.handle.net/10251/48098. es_ES
dc.description.accrualMethod Archivo delegado es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem