- -

Estudio del proceso constructivo de una nave industrial sin uso específico ejecutada con estructura prefabricada de hormigón

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Estudio del proceso constructivo de una nave industrial sin uso específico ejecutada con estructura prefabricada de hormigón

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Angulo Ibáñez, Quiteria es_ES
dc.contributor.author Montero de Espinosa Martínez de Haro, Ernesto Ramón es_ES
dc.coverage.spatial east=-0.4482656; north=39.3513375; name=Carrer Codonyers, 1, 46229 Picassent, Valencia, Espanya
dc.date.accessioned 2015-04-30T08:22:39Z
dc.date.available 2015-04-30T08:22:39Z
dc.date.created 2014-09-12
dc.date.issued 2015-04-30
dc.identifier.uri http://hdl.handle.net/10251/49509
dc.description.abstract [ES] El presente proyecto se realiza el estudio del sistema constructivo de una nave industrial sin uso, ejecutada con estructura prefabricada de hormigón y cubierta tipo sándwich. El objetivo de este trabajo ha sido profundizar en la construcción de la tipología de edificación industrial, basándonos en un caso práctico real y en el seguimiento del mismo realizado en obra. Esto ha permitido dar soluciones a los distintos problemas que han ido surgiendo, sirviendo de aprendizaje en la profesión. En este TFG se desarrollan los sistemas constructivos utilizados, desde el replanteo, movimiento de tierras, cimentación, estructura, cerramientos y sistema de sustentación de la cubierta, haciendo un análisis de todos los puntos singulares, tales como encuentros con los paneles de fachada, ménsulas de apoyo, apoyos de vigas, anclajes de pilares a cimentación, etc. Posteriormente se realiza un análisis de las fases de obra y se confecciona un guion del seguimiento de la misma, dando como resultado la visión completa de la ejecución de la nave y sus detalles constructivos, incluyendo las partidas, su ordenación y tiempos de ejecución. es_ES
dc.description.abstract [EN] This project embodies the study of the construction system of a warehouse unused, executed with prefabricated concrete deck sandwich structure. The aim of this study was to investigate the construction of the typology of industrial buildings, based on a real case study and monitoring conducted in the same work. This has led to solutions to the various problems that have arisen, serving learning in the profession. This construction is implemented following the actual steps taken. The building methods used from the stakeout, earthwork, foundation, structure, enclosures and support system will be developed cover, with analysis of all singular, such as meetings with panels face, bearing brackets, braces points beams, pillars foundation anchors, etc. Then we will proceed to an analysis of the phases of work and a script for monitoring the same shall be drawn, resulting in the complete picture of the operation of the ship and its construction details, including headings, their management and execution times. es_ES
dc.format.extent 110 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Edificios industriales es_ES
dc.subject Construcciones prefabricadas es_ES
dc.subject Hormigón prefabricado es_ES
dc.subject Cimentaciones es_ES
dc.subject Fachadas es_ES
dc.subject Cubiertas (Construcción) es_ES
dc.subject Vigas es_ES
dc.subject Industrial buildings es_ES
dc.subject Buildings, Prefabricated es_ES
dc.subject Precast concrete es_ES
dc.subject Foundations es_ES
dc.subject Façades es_ES
dc.subject Roofs es_ES
dc.subject Girders es_ES
dc.subject.classification CONSTRUCCIONES ARQUITECTONICAS es_ES
dc.subject.other Grado en Arquitectura Técnica-Grau en Arquitectura Tècnica es_ES
dc.title Estudio del proceso constructivo de una nave industrial sin uso específico ejecutada con estructura prefabricada de hormigón es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Gestión en la Edificación - Escola Tècnica Superior de Gestió en l'Edificació es_ES
dc.description.bibliographicCitation Montero De Espinosa Martínez De Haro, ER. (2014). Estudio del proceso constructivo de una nave industrial sin uso específico ejecutada con estructura prefabricada de hormigón. http://hdl.handle.net/10251/49509. es_ES
dc.description.accrualMethod Archivo delegado es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem