Jijek, MiroslavWaliño Ariete, Sheila2013-06-042013-06-042011-06-302013-06-04https://riunet.upv.es/handle/10251/29420Consulta en la Biblioteca ETSI Industriales (8771)[EN] The objective of this project is to design a power plant of 120 MW that works in a reheat-regenerative Rankine cycle, to obtain: 1. Determine the fractions of steam extracted from the turbine each time. 2. Determine the thermal efficiency of the cycle 3. Determine the fuel and air consumption rates of the power plant 4. Design the needed heat exchangers (boiler, reheater, condenser, closed feedwater heaters). 5. Second analysis of essential units of the power plan is expected 6. For future improvement of the design find more effective extraction pressures.Reserva de todos los derechosConsulta en la Biblioteca ETSI IndustrialesCentrales eléctricasINGENIERIA ELECTRICAIngeniero Industrial-Enginyer IndustrialPower plant 130 MWProyecto/Trabajo fin de carrera/gradoCerrado