Zobal, Yevhen(Universitat Politècnica de València, 2019-07-08)
[EN] The main objectives of this project are analysis and evaluation of risks downstream the dam in India. It explains the meaning of risk model, determines the parts an architecture is composed of: loads (Season, day/night, ...
Zobal, Yevhen(Universitat Politècnica de València, 2014-09-25)
[EN] As the title says, the project consists of hydroelectric power situated on the river Cabriel. We will have to build a little weir, which function is going to be an elevating of water surface, for its later caption and ...