Ruiz López, Francisco José(Universitat Politècnica de València, 2022-03-30)
[ES] Descripción
El trabajo consiste en un análisis comparativo de la implementación del modelo de gestión LEAN en dos empresas de distinto sector. Se pretende demostrar la importancia de una adecuada gestión en todos los ...
Pascual Vanaclocha, Emilio(Universitat Politècnica de València, 2022-12-15)
[ES] El trabajo consiste en el diseño estructural de una pasarela para salvar los aproximadamente 45 metros de luz que tiene de anchura el barranco del Puch, junto a la playa de Aiguadoliva. Esta pasarela permitirá dar ...
Contel Martín, Sara(Universitat Politècnica de València, 2017-10-20)
[EN] The viaduct 0.3B in the connection of Mascara with the East-West dual carriageway (Algeria) presents a 1909,0 m in length with a pre-stressed box-shaped cross section and 39 piles with H-section of 4.0x5.2 m. The ...
Conejero Goterris, María(Universitat Politècnica de València, 2019-07-29)
[EN] Study of technical constraints throughout the execution of a linear construction-step. Practical application to the case of the execution of the bridge over the Seco river.
Castelló Navarro, Roberto(Universitat Politècnica de València, 2022-10-26)
ES] DESCRIPCIÓN El paso elevado sobre las vías de ferrocarril en la Avenida Tenor Fleta de Zaragoza en la actualidad consiste en un puente integrado en la estructura que cubre dichas vía de ferrocarril. Este puente y la ...
Ballesteros Almonacid, María(Universitat Politècnica de València, 2021-10-29)
[ES] Este trabajo titulado "Estudio del estado de la obra de regulación para riego situada en afluente al río Santa Lucía Chico, Uruguay. Propuesta de adecuación de los incumplimientos detectados" se desarrolla en dos ...
Echeverri Reyes, Víctor Manuel(Universitat Politècnica de València, 2018-09-11)
[ES] Con el presente Trabajo Final de Grado, se pretende dar una visión global de la organización general de las obras desde el punto de vista del jefe de obra.
El proyecto trata de una ampliación de dos a tres carriles ...
Fresneda Expósito, Víctor(Universitat Politècnica de València, 2017-09-27)
[EN] The main objective of this degree's final project is to obtain a complete organisation of the necessary work to build the unfolding of the road SG-20 (Segovia's beltway) into a highway.
The project has been made by ...
Oltra Benavent, Teresa(Universitat Politècnica de València, 2017-09-29)
[EN] The main objective of this degree's final project is to obtain a complete organisation of the necessary work to build the unfolding of the road SG-20 (Segovia's beltway) into a highway.
The project has been made by ...
Hernández Durán, Daniel(Universitat Politècnica de València, 2017-09-27)
[EN] The main objective of this degree's final project is to obtain a complete organization of the necessary work to build the unfolding of the road SG-20 (Segovia's beltway) into a highway.
The project has been made by ...
Pascual Vanaclocha, Emilio(Universitat Politècnica de València, 2017-09-27)
[EN] The objective of this final project is to obtain a complete organization of the works necessary to construct the unfolding of the highway SG-20, that is the bypass of Segovia, to freeway.
The work has been done through ...
Ivanov Trifonov, Ilian(Universitat Politècnica de València, 2017-09-19)
[ES] En el presente TFG se van a desarrollar las bases teóricas de un Estudio Económico y su aplicación práctica al Proyecto de Construcción de la 'Conversión en autovía de la carretera SG-20. Circunvalación de Segovia del ...
Azorín Carrión, Antonio(Universitat Politècnica de València, 2016-01-08)
[EN] Selecting an appropriate material storage system typology, for the raw material as well as for the products resulting from the manufacturing process, is essential for the management of production and control stock ...
[EN] Nowadays there are several available techniques applied in cement industry for storing clinker,
the election depends not only on commensurable criteria, but also on intangible factors. This
paper proposes an expert ...