Lozano-Galant, José Antonio; Paya-Zaforteza, Ignacio(Elsevier, 2017)
[EN] This paper describes a study of the Tempul Aqueduct, one of the first structures designed and built by Eduardo Torroja. At a time when computers did not exist, Torroja's courage and innovation were outstanding. He was ...
[EN] Due to the rapid growth of the construction industry¿s global environmental impact, especially the environmental impact contribution of bridge structures, it is necessary to study the detailed environmental impact of ...
Andreu García, Carlos(Universitat Politècnica de València, 2019-02-06)
[EN] The following thesis has his objective on the design and structural analysis of a pedestrian footbridge composed by two spiral spans of 35 meters length each and a main cable-sayed span of 60 meters length with a ...
Lozano Galant, José Antonio; Paya-Zaforteza, Ignacio; Turmo Coderque, José("Technika", Vilnius Gediminas Technical University,, 2015)
Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important ...
[EN] The construction industry of all countries in the world is facing the issue of sustainable development. How to make effective and accurate decision-making on the three pillars (Environment; Economy; Social influence) ...
Traditionally the construction process of cable-stayed bridges is modeled according to the backward approach, as its calculation is much easier using an elastic analysis. In this approach the bridge is disassembled according ...
Lozano-Galant, Jose Antonio; Ruiz Ripoll, Lidia; Paya-Zaforteza I.; Turmo, José(VILNIUS GEDIMINAS TECH UNIV, SAULETEKIO AL 11, VILNIUS, LT-10223, LITHUANIA, 2014)
In current practice, the effects of the evolutionary erection of cable-stayed bridge superstructure are rarely included into the simulation of its tensioning process. In fact, stay forces in service are usually defined in ...