Ponce Nuévalos, Francisco Roberto(Universitat Politècnica de València, 2015-09-21)
[EN] The objective of this Degree Final Project consists in the construction of a container terminal with an area of 52.85 ha which is located in the South Basin of the Puerto ode Castellón.
Because traffic forecasts port ...
Arzo Martí, Roberto(Universitat Politècnica de València, 2015-09-21)
[EN] The objective of this Degree Final Project consists in the construction of a container terminal with an area of 52.85 ha which is located in the South Basin of the Puerto ode Castellón.
Because traffic forecasts port ...