Araujo, Felipe F. B.; Costa, Alysson M.; Miralles Insa, Cristóbal Javier(Inderscience Enterprises Ltd., 2015)
[EN] In this paper, we study an assembly line balancing problem that occurs in sheltered worker centres for the disabled, where workers with very different characteristics are present. We are interested in the situation ...
Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier(Elsevier, 2014-09-01)
We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop
Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best
worker assignment to the ...
Araujo, Felipe F.B.; Costa, Alysson M.; Miralles Insa, Cristóbal Javier(Elsevier, 2012)
[EN] In this article, we introduce two new variants of the ALWABP that allow parallelization of and collaboration between heterogeneous workers.
These new approaches suppose an additional level of complexity in the Line ...