In the no-idle flowshop, machines cannot be idle after finishing one job and before starting the next one.
Therefore, start times of jobs must be delayed to guarantee this constraint. In practice machines show
this ...
We consider a Distributed Assembly Permutation Flowshop Scheduling Problem with sequence dependent setup times and the objective of makespan minimization. The problem consists of two stages, production and assembly. The ...
[EN] In practice due dates usually behave more like intervals rather than specific points in time. This paper studies hybrid flowshops where jobs, if completed inside a due window, are considered on time. The objective is ...
The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as from multi-objective perspectives. To the best of our knowledge, little has been done regarding ...
Fanjul Peyró, Luis(Universitat Politècnica de València, 2011-02-01)
Para iniciar esta Tesis Doctoral se buscó un problema de producción sencillo
pero de amplia aplicación práctica que permitiera adaptarlo para llegar
a problemas más generales y de más amplia aplicación. Por este motivo, ...
Hatami, Sara(Universitat Politècnica de València, 2016-05-16)
[EN] Nowadays, manufacturing systems meet different new global challenges and
the existence of a collaborative manufacturing environment is essential to face
with. Distributed manufacturing and assembly systems are two ...