Wang, Yamin; Li, Xiaoping; Ruiz García, Rubén; Sui, S.(Institute of Electrical and Electronics Engineers, 2018-05)
[EN] The mixed no-wait flowshop problem with both wait and no-wait constraints has many potential real-life applications. The problem can be regarded as a generalization of the traditional permutation flowshop and the ...