Silva, W. T. P.; Campos, M. M.; Santos, A. A.(Universitat Politècnica de València, 2016-04-29)
[EN] In order to move operational efficiency from the water system supply (Waterworks, i.e. a combined water purification plant and pumping station) forecast water consumption values 24 h ahead are required. The objective ...