Barberá Carpio, Alejandro(Universitat Politècnica de València, 2017-10-19)
[EN] System transportation is composed by a lot of components. From them outline bridges due to their consideration like critical elements that can cause important problems in case of fail or collapse (Chang and Nojima or ...
Esteve García, Daniel(Universitat Politècnica de València, 2015-09-07)
[EN] The Draft aims to solve the existing problems at the intersection of road CV 405 with the CV-415 road in the town of Montserrat (Valencia), via a diamond interchange with an overpass. This work fulfills the objectives ...
Morcillo Martínez, Emilio(Universitat Politècnica de València, 2015-09-15)
[EN] The Draft aims to solve the existing problems at the intersection of road CV 405 with the CV-415 road in the town of Montserrat (Valencia), via a diamond interchange with an overpass. This work fulfills the objectives ...
Lidón Rocamora, Ana(Universitat Politècnica de València, 2015-09-21)
[EN] The Draft aims to solve the existing problems at the intersection of road CV 405 with the CV-415 road in the town of Montserrat (Valencia), via a diamond interchange with an overpass. This work fulfills the objectives ...
Ortiz Verdú, Carlos(Universitat Politècnica de València, 2019-01-31)
[EN]
The present Master's Thesis which is entitled "Structural design of the overpass of the access link to Mercapalma on Llevant Motorway (Ma-19), TM of El Coll d'En Rabassa (Mallorca)" consists of the design structural ...
Cornejo Leal, Felipe(Universitat Politècnica de València, 2019-02-06)
[EN] The structural design of the overpass is made by lightened prestressed concrete slab bridge, with a variable edge. To save the two spans of 54 m of lenght, the overpass is pretessed by four prestressed cables, drawn ...
Martí Albiñana, José Vicente(Universitat Politècnica de València, 2010-10-13)
Los tableros de vigas prefabricadas de hormigón pretensado se utilizan habitualmente en todo el mundo para resolver estructuras de viaductos y de pasos superiores sobre carreteras. Son escasos los trabajos de inestigación ...
Pardo Goicoechea, Enrique(Universitat Politècnica de València, 2014-07-16)
[EN] The main objective of this project is to check and design the structure of the overpass on the northbound highway (CV-30) which connects Burjassot with the neighborhood of "Ciutat Fallera" in Valencia. The tasks done ...
Barberá Carpio, Alejandro(Universitat Politècnica de València, 2014-07-16)
[EN] The main objective of this project is to check and design the structure of the overpass on the northbound highway (CV-30) which connects Burjassot with the neighborhood of "Ciutat Fallera" in Valencia. The tasks done ...
Palomar Ordóñez, Marta(Universitat Politècnica de València, 2016-09-07)
[EN] The following Study of reconditioning is consistent to the objectives set for a Final work of degree. It represents an application of the professional skills associated with the degree, putting into practice knowledge ...
Cebrián Sánchez, Paloma(Universitat Politècnica de València, 2016-09-07)
[EN] The following Study of reconditioning is consistent to the objectives set for a Final work of degree. It represents an application of the professional skills associated with the degree, putting into practice knowledge ...
Molina Martínez, Antonio(Universitat Politècnica de València, 2016-09-29)
[EN] The following Study of reconditioning is consistent to the objectives set for a Final work of degree. It represents an application of the professional skills associated with the degree, putting into practice knowledge ...
Rubio Muñoz, Carlos(Universitat Politècnica de València, 2022-07-28)
[ES] Se pretende realizar un estudio de soluciones para un paso superior. Se realizará un predimensionamiento de unas posibles soluciones y, posteriormente, se escogerá razonadamente una de ellas. Esta solución se modelizará ...
Peris Fernández, Raúl(Universitat Politècnica de València, 2016-10-03)
[EN] The main objective of this project is the study of solutions, design and the alternative proposals of a deck to overpass, located on the highway CV-35, in PK 1+400. The work done by the student, all of them in the ...
Karim, Mouncef(Universitat Politècnica de València, 2018-12-19)
[EN] The aim of this Final Degree Project is the study of solutions, design and alternative proposals for the sub-structural elements for the overpass located in the CV-21 Highway, Camí Travessada de la Tanca intersection ...
Lozano Prado, Rafael(Universitat Politècnica de València, 2018-01-10)
[EN] It is the construction of a mixed board of two bays of 40 meters and 14 meters wide. The bridge has a road of 9 meters and on the sides a bike path and another pedestrian. It is solved with a metal box 8 meters wide. ...