Barberá Carpio, Alejandro(Universitat Politècnica de València, 2017-10-19)
[EN] System transportation is composed by a lot of components. From them outline bridges due to their consideration like critical elements that can cause important problems in case of fail or collapse (Chang and Nojima or ...
Esteve Vilar, Víctor(Universitat Politècnica de València, 2016-11-02)
[EN] The aim of this master's thesis is to perform the structural analysis of a bridge of prestressed beams in order to give continuity to the motorway to Mascara (Algeria) throughOued The Mouassiya ravine. The total length ...
Cervera Vallbona, Ana(Universitat Politècnica de València, 2016-11-02)
[EN] The object of this master's final work is to perform the structural analysis of a bridge of prestressed beams in order to give continuity to the motorway to Mascara (Algeria) to its passage by the ravine Oued The ...
Jiménez Serrano de la Cruz, David(Universitat Politècnica de València, 2016-11-02)
[EN] The aim of this master's thesis is to perform the structural analysis of a bridge of prestressed beams in order to give continuity to the motorway to Mascara (Algeria) through Oued The Mouassiya ravine. The total ...
Kubaychuk, Kostyantyn(Universitat Politècnica de València, 2016-10-26)
[EN] The aim of this master¿s thesis is to perform the structural analysis of a bridge of prestressed beams in order to give continuity to the motorway to Mascara (Algeria) through Oued. The Mouassiya ravine. The total ...
Mas Buigues, Víctor(Universitat Politècnica de València, 2018-09-12)
[ES] El presente anteproyecto se centra en realizar una propuesta de pasarela sobre el cauce del río Gorgos en su paso por la localidad de Xàbia. Para el desarrollo se han tenido en cuenta los condicionantes técnicos del ...
Noguera Pastor, Rafael(Universitat Politècnica de València, 2014-07-04)
[EN] The prestressed slab bridges are some of the most common solutions road bridge, with its stronger application on overpasses on highways and motorways. Your design must meet all the external factors, and is a common ...
Sáenz Rada, Asier(Universitat Politècnica de València, 2015-10-19)
[EN] In this document the designing of a structure has been carried out. This structure is located along the road CV-190 passing by Figueroles and spanning the ravine to the east of Figueroles. In order to do that an ...
Sánchez Laosa, Javier(Universitat Politècnica de València, 2015-09-09)
[EN] In this document the designing of a structure has been carried out. This structure is located along the road CV-190 passing by Figueroles and spanning the Lucena river as well as the ravine previous to this one. In ...
Camarena Escribano, Marina(Universitat Politècnica de València, 2016-07-06)
[ES] En el documento a continuación se ha llevado a cabo el dimensionamiento de la estructura ubicada dentro de la variante CV-190 a su paso por Figueroles que salva el Río Lucena. Para ello se realizado un extenso estudio ...
Natividad Roig, Francisco(Universitat Politècnica de València, 2015-11-02)
[ES] En el documento a continuación se ha llevado a cabo el dimensionamiento de la estructura ubicada dentro de la variante CV-190 a su paso por Figueroles que salva el Río Lucena. Para ello se realizado un extenso estudio ...
Zheng Lu, Jia Wei(Universitat Politècnica de València, 2015-10-30)
[EN] On this document about structures calculus, analyzes a variation of the CV-190 road passing through the south of the municipality of Figueroles province of Castellon are studied. The need for this new route is due to ...
Zheng Lu, Jia Yi(Universitat Politècnica de València, 2015-09-11)
[EN] The object of this final degree paper is the design of the deck from a bridge over the Lucena river. This construction is produced because of a detour of the CV-190 road passing by the south of the town of Figueroles, ...
Álvarez Mondaca, Ignacio José(Universitat Politècnica de València, 2015-10-27)
[EN] On this document works structural calculation generated by a variation of the CV-190 road passing through the south of the municipality of Figueroles province of Castellon are studied. The need for this new route is ...
Palao Puche, Juan Pedro(Universitat Politècnica de València, 2015-09-07)
[EN] The aim of this Project is to analyze the interaction between the Lucena River and the road¿s new bridge at the southern part of Figueroles. The calculus had to be done considering an avenue of 100 year return period ...
Andújar Zabal, Ángel(Universitat Politècnica de València, 2016-10-25)
[EN] This Basic Project aims to design and dimension the link structure between the RN23 motorway and the East Round of Tiaret in Algeria. Currently both routes are perpendicular at the same level by a roundabout intersection ...
Llorens Pérez, Celia(Universitat Politècnica de València, 2016-10-25)
[EN] This Basic Project aims to design and dimension the link structure between the RN23 motorway and the East Round of Tiaret in Algeria. Currently both routes are perpendicular at the same level by a roundabout intersection ...
Hernández Maset, Manuel(Universitat Politècnica de València, 2018-12-28)
[EN] The present TFM arises from the project with name "Conditioning of the Port of Querol, N-232, PPKK 46 + 300 to 54 + 900. Barranco de la Bota-Masía de la Torreta section. Province of Castellón". Specifically viaduct ...
Martínez Muñoz, David(Universitat Politècnica de València, 2018-12-27)
[EN] The present TFM arises from the project with name "Conditioning of the Port of Querol, N-232, PPKK 46 + 300 to 54 + 900. Barranco de la Bota-Masía de la Torreta section. Province of Castellón". Specifically viaduct ...
Porebska, Adrianna(Universitat Politècnica de València, 2017-09-07)
[EN] The purpose of this bachelor project is concept development and design of two footbridges that cross the Júcar river between the municipalities of Alarcón and Sisante, Cuenca. Both structures ...