Díaz-Madroñero Boluda, Francisco Manuel; Peidro Payá, David; Mula, Josefa(Elsevier, 2014-12-01)
We consider a real-world automobile supply chain in which a first-tier supplier serves an assembler and determines its procurement transport planning for a second-tier supplier by using the automobile assembler's demand ...
Mula, Josefa; Campuzano Bolarín, Francisco; Díaz-Madroñero Boluda, Francisco Manuel; Carpio, Katerine M.(Taylor & Francis: STM, Behavioural Science and Public Health Titles, 2013-07-01)
This article proposes a simulation approach based on system dynamics for operational procurement and transport planning in a two-level, multi-product and multi-period supply chain. This work uses the Vensim((R)) simulation ...
Fuentes Bargues, José Luis; González-Gaya, Cristina(Science Publishing Group, 2013)
[EN] Public works procurement regulates two award procedures from within the same criteria: either the price or a variety of different conditions. Although the question of price may not seem the most important factor to ...
Uranga Ruiz de la Torre, Xabier(Universitat Politècnica de València, 2023-09-27)
[ES] El presente TFM trata sobre el análisis exhaustivo de los indicadores de rendimiento tanto internamente en el departamento de aprovisionamiento como externamente con los proveedores. La empresa en cuestión es una gran ...
Casapino Espinoza, Miguel Ángel(Universitat Politècnica de València, 2016-04-19)
[EN] Most construction projects have as principal sponsor the government of the country. A large number of construction projects that are promoted by public entities are contracted and executed through a bidding process. ...
Navarro Jamain, José(Universitat Politècnica de València, 2021-03-02)
[ES] En el presente TFM se realizará un análisis de todos los procesos de negocio llevados a cabo por una empresa dedicada a la fabricación de torres elevadoras, trusses, tarimas para escenarios y accesorios.
Para ello ...
Pérez-García, Ana; Martín-Dorta, Norena; Aranda Domingo, José Ángel(MDPI AG, 2021-12)
[EN] The use of Building Information Modeling (BIM) is increasingly widespread within the Architecture, Engineering, Construction & Operations (AECO) sector. BIM allows the construction of a digital scale model of the asset ...
García-Rodríguez, Manuel J.; Rodríguez-Montequín, Vicente; Ballesteros-Pérez, Pablo; Love, Peter E. D.; Signor, Regis(Elsevier, 2022-01)
[EN] Collusion is an illegal practice by which some competing companies secretly agree on the prices (bids) they will submit to a future auction. Worldwide, collusion is a pervasive phenomenon in public sector procurement. ...
Siguencia Montero, María Paulina(Universitat Politècnica de València, 2019-01-23)
[EN] In recent years there have been significant reforms at international level within public procurement, which have been the object of internal analysis in multilateral instances of foreign trade development, being ...
Coronado Arroyo, María(Universitat Politècnica de València, 2017-10-04)
[EN] Procurement process has been a real challenge for the AEC Industry in the last years. The obstacles that have been showing up are significant for any facility project; cost overruns, delays, lack of coordination among ...
García-Segura, Tatiana; Montalbán-Domingo, Laura; Sanz-Benlloch, María Amalia; Pellicer, Eugenio; Catalá Alís, Joaquín(Asociación Española de Dirección e Ingeniería de Proyectos (AIEPRO), 2020-07-09)
[ES] Se ha demostrado que las técnicas tradicionales de aprendizaje no consiguen
motivar a los estudiantes de ingeniería a desarrollar sus habilidades. En cambio, la
metodología de Aprendizaje Basado en Proyectos (ABP) ...