Montávez Cifre, Jaime(Universitat Politècnica de València, 2015-09-23)
[EN] The reason for the drafting of the present TFG was born as a necessity before the existing problems in the municipality of Alboraya, well over it runs surface line 3 of F.G.V and therefore, Alboraya station (of the ...
Garcia Garcia, Sergio(Universitat Politècnica de València, 2015-09-23)
[EN] The reason for the drafting of the present TFG was born as a necessity before the existing problems in the municipality of Alboraya, well over it runs surface line 3 of F.G.V and therefore, Alboraya station (of the ...
Belda Ortuño, Adrián Ismael(Universitat Politècnica de València, 2016-09-14)
[ES] Este proyecto constituye el Trabajo Final de Grado de título "PROYECTO BÁSICO DE PASO INFERIOR BAJO TRÁFICO RODADO EN ZONA URBANA, MUSEROS (VALENCIA). SOLUCIÓN C" del alumno Adrián Ismael Belda Ortuño.
La necesidad ...