Xu, Haiyan; Li, Xiaoping; Ruiz García, Rubén; Zhu, Haihong(Institute of Electrical and Electronics Engineers, 2021-05)
[EN] In this paper, we consider single-machine group scheduling with nonperiodical maintenance and deteriorating effects. Nonperiodical maintenance, which has unfixed maintaining interval or the number of jobs in each group ...