Jiménez Benlloch, Elena(Universitat Politècnica de València, 2014-09-30)
[EN] Has been written the Environmental Impact Study of weir construction project "Santa Quiteria" in the Mijares River town of Villarreal, Castellón province.
The main objective of building the weir is to improve the ...
Yarritu Sánchez, Helena Carla(Universitat Politècnica de València, 2017-09-06)
[EN] This End of Degree Project is a study on solutions of a fisway. The main purpose is to get back the longitudinal continuity of the river which has been pulled off by humanity along history. For that reason, a study ...
Pascual Francés, Salvador(Universitat Politècnica de València, 2018-12-18)
[EN] In this End of Degree Project is done the viability study of a hidroelectric power. Is is studied the cosntruction of a run-of-river mini-hydroelectric power plant. First of all, an analysis of the river's water ...
Sanchis Molines, Borja(Universitat Politècnica de València, 2014-09-23)
[EN] This project wants to analyse the feasibility of a hydroelectric use and it will compare the yearly economic profit with the total cost of the construction. As it knows that this work is just a Final Project Work and ...
Baselga Nicolau, Manuel(Universitat Politècnica de València, 2016-09-07)
[EN] In this Final Project entitled "Restoration and environmental adaptation of rivers and wetlands. Application to the effect of weirs in the upper Turia between Teruel and Benagéber ", the problems and effects exerted ...
Sánchez, Raúl; Juana, Luis(Universitat Politècnica de València, 2022-01-31)
[EN] An analitycal procedure is proposed to study the submergence of broad-crested weirs by means of the Momentum Equation. Both the modular limit of the weir and the flow-rate discharge curve in non-submerged condition ...