Lozano Prado, Rafael(Universitat Politècnica de València, 2018-01-10)
[EN] It is the construction of a mixed board of two bays of 40 meters and 14 meters wide. The bridge has a road of 9 meters and on the sides a bike path and another pedestrian. It is solved with a metal box 8 meters wide. ...