- -

Redesigning the in-plant supply logistics: A case study

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Redesigning the in-plant supply logistics: A case study

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Saez-Mas, Aida es_ES
dc.contributor.author García Sabater, José Pedro es_ES
dc.contributor.author García Sabater, Julio Juan es_ES
dc.contributor.author Ruiz, Angel es_ES
dc.date.accessioned 2021-05-12T03:31:39Z
dc.date.available 2021-05-12T03:31:39Z
dc.date.issued 2020-05 es_ES
dc.identifier.issn 0360-8352 es_ES
dc.identifier.uri http://hdl.handle.net/10251/166199
dc.description.abstract [EN] This paper addresses the redesign of an industrial assembly facility's internal logistics. To this end, it proposes a mathematical formulation that optimizes the components and parts' flow to feed the different workstations of the production lines. This flow of components starts at the reception docks where suppliers' trucks arrive. Components unloaded from trucks are moved to one or several storage areas by means of adequate handling equipment. Finally, components are transported to demand point located along the assembly line when required. Numerical results produced by the mathematical formulation for the studied plant show that savings of almost 33% in the total distribution time might be achieved by a better assignment of suppliers to reception docks and parts to storage areas, and by adequately choosing the capacity of the material handling equipment. es_ES
dc.description.sponsorship The work described in this paper has been partially supported by the project "Hiperheuristico Lenitivo de la Variabilidad del Entorno Industrial en la Programacion de Produccion del Lote Econonimo GVA/2017/008" by the Conselleria de Educacion, Investigacion, Cultura y Deporte of the Generalitat Valenciana within the Program "Proyectos de I+D+I para grupos de investigacion emergentes". We would like to thank the two anonymous reviewers and the editor for their valuable comments and suggestions. es_ES
dc.language Inglés es_ES
dc.publisher Elsevier es_ES
dc.relation.ispartof Computers & Industrial Engineering es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Supply system es_ES
dc.subject Material flow es_ES
dc.subject Material handling es_ES
dc.subject Feeding system es_ES
dc.subject Product assignment es_ES
dc.subject.classification ORGANIZACION DE EMPRESAS es_ES
dc.title Redesigning the in-plant supply logistics: A case study es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.1016/j.cie.2020.106422 es_ES
dc.relation.projectID info:eu-repo/grantAgreement/GVA//GV%2F2017%2F008/ es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Organización de Empresas - Departament d'Organització d'Empreses es_ES
dc.description.bibliographicCitation Saez-Mas, A.; García Sabater, JP.; García Sabater, JJ.; Ruiz, A. (2020). Redesigning the in-plant supply logistics: A case study. Computers & Industrial Engineering. 143:1-10. https://doi.org/10.1016/j.cie.2020.106422 es_ES
dc.description.accrualMethod S es_ES
dc.relation.publisherversion https://doi.org/10.1016/j.cie.2020.106422 es_ES
dc.description.upvformatpinicio 1 es_ES
dc.description.upvformatpfin 10 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 143 es_ES
dc.relation.pasarela S\428293 es_ES
dc.contributor.funder Generalitat Valenciana es_ES
dc.description.references Alizon, F., Dallery, Y., Essafi, I., & Feillet, D. (2009). Optimising material handling costs in an assembly workshop. International Journal of Production Research, 47(14), 3853-3866. doi:10.1080/00207540701851764 es_ES
dc.description.references Alnahhal, M., & Noche, B. (2013). Efficient material flow in mixed model assembly lines. SpringerPlus, 2(1). doi:10.1186/2193-1801-2-415 es_ES
dc.description.references Alnahhal, M., & Noche, B. (2015). A genetic algorithm for supermarket location problem. Assembly Automation, 35(1), 122-127. doi:10.1108/aa-02-2014-018 es_ES
dc.description.references Alnahhal, M., & Noche, B. (2015). Dynamic material flow control in mixed model assembly lines. Computers & Industrial Engineering, 85, 110-119. doi:10.1016/j.cie.2015.03.009 es_ES
dc.description.references Arifin, R., & Egbelu, P. J. (2000). Determination of vehicle requirements in automated guided vehicle systems: A statistical approach. Production Planning & Control, 11(3), 258-270. doi:10.1080/095372800232225 es_ES
dc.description.references Bányai, T. (2018). Real-Time Decision Making in First Mile and Last Mile Logistics: How Smart Scheduling Affects Energy Efficiency of Hyperconnected Supply Chain Solutions. Energies, 11(7), 1833. doi:10.3390/en11071833 es_ES
dc.description.references Battini, D., Boysen, N., & Emde, S. (2012). Just-in-Time supermarkets for part supply in the automobile industry. Journal of Management Control, 24(2), 209-217. doi:10.1007/s00187-012-0154-y es_ES
dc.description.references Battini, D., Gamberi, M., Persona, A., & Sgarbossa, F. (2015). Part-feeding with supermarket in assembly systems: transportation mode selection model and multi-scenario analysis. Assembly Automation, 35(1), 149-159. doi:10.1108/aa-06-2014-053 es_ES
dc.description.references Battini, D., Calzavara, M., Otto, A., & Sgarbossa, F. (2017). Preventing ergonomic risks with integrated planning on assembly line balancing and parts feeding. International Journal of Production Research, 55(24), 7452-7472. doi:10.1080/00207543.2017.1363427 es_ES
dc.description.references Battini, D., Faccio, M., Persona, A., & Sgarbossa, F. (2010). «Supermarket warehouses»: stocking policies optimization in an assembly-to-order environment. The International Journal of Advanced Manufacturing Technology, 50(5-8), 775-788. doi:10.1007/s00170-010-2555-0 es_ES
dc.description.references Boudella, M. E. A., Sahin, E., & Dallery, Y. (2018). Kitting optimisation in Just-in-Time mixed-model assembly lines: assigning parts to pickers in a hybrid robot–operator kitting system. International Journal of Production Research, 56(16), 5475-5494. doi:10.1080/00207543.2017.1418988 es_ES
dc.description.references Boysen, N., Emde, S., Hoeck, M., & Kauderer, M. (2015). Part logistics in the automotive industry: Decision problems, literature review and research agenda. European Journal of Operational Research, 242(1), 107-120. doi:10.1016/j.ejor.2014.09.065 es_ES
dc.description.references Boywitz, D., Boysen, N., & Briskorn, D. (2016). Resequencing with parallel queues to minimize the maximum number of items in the overflow area. Naval Research Logistics (NRL), 63(5), 401-415. doi:10.1002/nav.21699 es_ES
dc.description.references Caputo, A. C., Pelagagge, P. M., & Salini, P. (2017). Modeling errors in parts supply processes for assembly lines feeding. Industrial Management & Data Systems, 117(6), 1263-1294. doi:10.1108/imds-08-2016-0333 es_ES
dc.description.references Caputo, A. C., Pelagagge, P. M., & Salini, P. (2017). Modelling human errors and quality issues in kitting processes for assembly lines feeding. Computers & Industrial Engineering, 111, 492-506. doi:10.1016/j.cie.2017.04.004 es_ES
dc.description.references Carter, C. R., & Rogers, D. S. (2008). A framework of sustainable supply chain management: moving toward new theory. International Journal of Physical Distribution & Logistics Management, 38(5), 360-387. doi:10.1108/09600030810882816 es_ES
dc.description.references Ellis, K. P., Meller, R. D., Wilck, J. H., Parikh, P. J., & Marchand, F. (2010). Effective material flow at an assembly facility. International Journal of Production Research, 48(23), 7195-7217. doi:10.1080/00207540903186266 es_ES
dc.description.references Emde, S., & Boysen, N. (2012). Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines. International Journal of Production Economics, 135(1), 393-402. doi:10.1016/j.ijpe.2011.07.022 es_ES
dc.description.references Emde, S., Fliedner, M., & Boysen, N. (2012). Optimally loading tow trains for just-in-time supply of mixed-model assembly lines. IIE Transactions, 44(2), 121-135. doi:10.1080/0740817x.2011.575442 es_ES
dc.description.references Enderer, F., Contardo, C., & Contreras, I. (2017). Integrating dock-door assignment and vehicle routing with cross-docking. Computers & Operations Research, 88, 30-43. doi:10.1016/j.cor.2017.06.018 es_ES
dc.description.references Cedillo-Campos, M. G., Morones Ruelas, D., Lizarraga-Lizarraga, G., Gonzalez-Feliu, J., & Garza-Reyes, J. A. (2017). Decision policy scenarios for just-in-sequence (JIS) deliveries. Journal of Industrial Engineering and Management, 10(4), 581. doi:10.3926/jiem.2090 es_ES
dc.description.references Golz, J., Gujjula, R., Günther, H.-O., Rinderer, S., & Ziegler, M. (2011). Part feeding at high-variant mixed-model assembly lines. Flexible Services and Manufacturing Journal, 24(2), 119-141. doi:10.1007/s10696-011-9116-1 es_ES
dc.description.references Hernández-Rodríguez, S., Hernández-Lira, C. A., Aguilar-Rico, A., Flores-Becerra, G., Flores-Méndez, J., & Vázquez-Cuchillo, O. (2016). A recommender system applied to the indirect materials selection process (RS-IMSP) for producing automobile spare parts. Computers in Industry, 82, 233-244. doi:10.1016/j.compind.2016.07.004 es_ES
dc.description.references Khajavi, S. H., Baumers, M., Holmström, J., Özcan, E., Atkin, J., Jackson, W., & Li, W. (2018). To kit or not to kit: Analysing the value of model-based kitting for additive manufacturing. Computers in Industry, 98, 100-117. doi:10.1016/j.compind.2018.01.022 es_ES
dc.description.references Korytkowski, P., & Karkoszka, R. (2015). Simulation-based efficiency analysis of an in-plant milk-run operator under disturbances. The International Journal of Advanced Manufacturing Technology, 82(5-8), 827-837. doi:10.1007/s00170-015-7442-2 es_ES
dc.description.references Kozan, E. (2000). An integrated material handling system for a truck assembly plant. Journal of the Operational Research Society, 51(3), 263-271. doi:10.1057/palgrave.jors.2600921 es_ES
dc.description.references Nasiri, M. M., Rahbari, A., Werner, F., & Karimi, R. (2018). Incorporating supplier selection and order allocation into the vehicle routing and multi-cross-dock scheduling problem. International Journal of Production Research, 56(19), 6527-6552. doi:10.1080/00207543.2018.1471241 es_ES
dc.description.references Nourmohammadi, A., & Eskandari, H. (2017). Assembly line design considering line balancing and part feeding. Assembly Automation, 37(1), 135-143. doi:10.1108/aa-09-2016-122 es_ES
dc.description.references Nourmohammadi, A., Eskandari, H., & Fathi, M. (2018). Design of stochastic assembly lines considering line balancing and part feeding with supermarkets. Engineering Optimization, 51(1), 63-83. doi:10.1080/0305215x.2018.1439944 es_ES
dc.description.references Saez-Mas, A., Garcia-Sabater, J. P., & Morant-Llorca, J. (2018). Using 4-Layer Architecture to Simulate Product and Information Flows in Manufacturing Systems. International Journal of Simulation Modelling, 17(1), 30-41. doi:10.2507/ijsimm17(1)408 es_ES
dc.description.references Staab, T., Klenk, E., Galka, S., & Günthner, W. A. (2016). Efficiency in in-plant milk-run systems—The influence of routing strategies on system utilization and process stability. Journal of Simulation, 10(2), 137-143. doi:10.1057/jos.2015.6 es_ES
dc.description.references Wagner, S. M., & Silveira-Camargos, V. (2011). Decision model for the application of just-in-sequence. International Journal of Production Research, 49(19), 5713-5736. doi:10.1080/00207543.2010.505216 es_ES
dc.description.references Wang, C., Guan, Z., Shao, X., & Ullah, S. (2014). Simulation-based optimisation of logistics distribution system for an assembly line with path constraints. International Journal of Production Research, 52(12), 3538-3551. doi:10.1080/00207543.2013.874602 es_ES
dc.description.references Wang, J., Chang, Q., Xiao, G., Wang, N., & Li, S. (2011). Data driven production modeling and simulation of complex automobile general assembly plant. Computers in Industry, 62(7), 765-775. doi:10.1016/j.compind.2011.05.004 es_ES
dc.description.references Wänström, C., & Medbo, L. (2008). The impact of materials feeding design on assembly process performance. Journal of Manufacturing Technology Management, 20(1), 30-51. doi:10.1108/17410380910925398 es_ES
dc.description.references Zangaro, F., Battini, D., Calzavara, M., Persona, A., & Sgarbossa, F. (2018). A Model to Optimize the Reference Storage Assignment in a Supermarket to Expedite the Part Feeding Activities. IFAC-PapersOnLine, 51(11), 1470-1475. doi:10.1016/j.ifacol.2018.08.296 es_ES
dc.description.references Zenker, M., Emde, S., & Boysen, N. (2016). Cyclic inventory routing in a line-shaped network. European Journal of Operational Research, 250(1), 164-178. doi:10.1016/j.ejor.2015.10.067 es_ES
dc.description.references Zhou, B., & Peng, T. (2017). Scheduling the in-house logistics distribution for automotive assembly lines with just-in-time principles. Assembly Automation, 37(1), 51-63. doi:10.1108/aa-04-2016-028 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem