- -

Implementación de la metodología BIM como medida conservativa y de puesta en valor de los bienes integrados en la Lista Roja del Patrimonio. Caso de estudio El Molino del Cubo.

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Implementación de la metodología BIM como medida conservativa y de puesta en valor de los bienes integrados en la Lista Roja del Patrimonio. Caso de estudio El Molino del Cubo.

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Ramón Fernández, Francisca es_ES
dc.contributor.author Sáez Cañada, Alberto es_ES
dc.coverage.spatial east=-3.9407015; north=37.7438976; name=Vía sin nombre, 23650 Torredonjimeno, Jaén, Espanya
dc.date.accessioned 2022-07-05T11:04:46Z
dc.date.available 2022-07-05T11:04:46Z
dc.date.created 2022-06-02
dc.date.issued 2022-07-05 es_ES
dc.identifier.uri http://hdl.handle.net/10251/183828
dc.description.abstract [ES] El riesgo de desaparición, destrucción o alteración de los valores de los bienes integrantes del patrimonio cultural y natural; se ven influenciados en gran medida por el progreso y el cambio urbanístico que se desarrolla tanto en las ciudades como en áreas rurales y naturales, propiciadas por las mejoras tecnológicas o los cambios de gusto y estilo. De este modo para evitar la propagación de estos riesgos, es necesario hacer llegar a la población civil las herramientas necesarias para adquirir los conocimientos y la sensibilización por el patrimonio, promoviendo la actuación de la sociedad para salvaguardar los elementos patrimoniales en riesgo. El presente trabajo, dirigido por la Dra. Francisca Ramón Fernández, se engloba dentro del marco del Máster en Conservación y Restauración de Bienes Culturales, impartido en la Universidad Politécnica de Valencia, como Tesis de Final de Máster. Esta propuesta tiene como fin complementar la iniciativa de La Lista roja del Patrimonio promovida por la Asociación Hispania Nostra. De este modo, se procede mediante la implementación de las Metodología BIM (Building Information Management) como herramienta conservativa y de puesta en valor del Patrimonio Arquitectónico recogido en esta lista. Con la ayuda de esta metodología se realiza el volcado de la información documental de los bienes en un modelo 3D que se emplea como base de datos de toda la información referente a los temas relacionados con el bien (Históricos, artísticos, científicos, conservativos, intervenciones, etc.) Esta Metodología contempla diferentes dimensiones que corresponden a distintas fases del proceso. Para comprobar la viabilidad de esta propuesta se realiza un caso de estudio, El Molino del Cubo, Torredonjimeno (Jaén). En el cual se implementan y desarrollan los procesos necesarios para llevar a cabo la conservación y puesta en valor del mismo mediante el uso de la metodología BIM. es_ES
dc.description.abstract [EN] The risk of disappearance, destruction or alteration of the values of the assets that make up the cultural and natural heritage; are largely influenced by progress and urban development that takes place both in cities and in rural and natural areas, driven by technological improvements or changes in taste and style. In this way, to avoid the spread of these risks, it is necessary to provide the civilian population with the necessary tools to acquire knowledge and awareness of the heritage, promoting the action of society to safeguard the assets at risk. This work, directed by Dr. Francisca Ramón Fernández, is included within the framework of the Master's Degree in Conservation and Restoration of Cultural Assets, taught at the Polytechnic University of Valencia, as a Master's Final Thesis The purpose of this proposal is to complement the initiative of The Red List of the Heritage promoted by the Hispania Nostra Association. In this way, we proceed through the implementation of the BIM (Building Information Management) Methodology as a conservative tool and valuation of the Architectural Heritage included in this list. With the help of this methodology, the documented information of the assets is dumped into a 3D model that is used as a database with all the information regarding the issues related to the asset (Historical, artistic, scientific, conservative, interventions, etc.) This Methodology contemplates different dimensions that correspond to different phases of the process. To verify the viability of this proposal, a case study is carried out, El Molino del Cubo, Torredonjimeno (Jaén). In which the necessary processes are implemented and developed to carry out its conservation and valuation through the use of the BIM methodology. es_ES
dc.format.extent 94 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reconocimiento - Compartir igual (by-sa) es_ES
dc.subject Cultural heritage es_ES
dc.subject Heritage conservation es_ES
dc.subject Patrimonio cultural es_ES
dc.subject Heritage Building Information Modeling (HBIM) es_ES
dc.subject Building Information Modeling (BIM) es_ES
dc.subject Red List of Endangered Heritage es_ES
dc.subject Red List of the Heritage es_ES
dc.subject Lista roja de patrimonio en peligro es_ES
dc.subject Conservación del patrimonio es_ES
dc.subject Molino del Cubo (Torredonjimeno, Jaén) es_ES
dc.subject.classification DERECHO CIVIL es_ES
dc.subject.other Máster Universitario en Conservación y Restauración de Bienes Culturales-Màster Universitari en Conservació i Restauració de Béns Culturals es_ES
dc.title Implementación de la metodología BIM como medida conservativa y de puesta en valor de los bienes integrados en la Lista Roja del Patrimonio. Caso de estudio El Molino del Cubo. es_ES
dc.title.alternative Implementation of the BIM Methodology as a Conservative Measure and to Point Out the Value of the Assets Integrated in The Red List of Heritage. Case of Study El Molino del Cubo. es_ES
dc.title.alternative Implementació de la metodologia bim com a mesura conservativa i de posada en valor dels béns integrats en la Llista Roja del Patrimoni. Cas d'estudi El Molí del poal es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Urbanismo - Departament d'Urbanisme es_ES
dc.description.bibliographicCitation Sáez Cañada, A. (2022). Implementación de la metodología BIM como medida conservativa y de puesta en valor de los bienes integrados en la Lista Roja del Patrimonio. Caso de estudio El Molino del Cubo. Universitat Politècnica de València. http://hdl.handle.net/10251/183828 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\146800 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem