- -

MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Pulido, Raul es_ES
dc.contributor.author Garcia-Sánchez, Álvaro es_ES
dc.contributor.author Ortega-Mier, Miguel es_ES
dc.contributor.author Brun, Asessandro es_ES
dc.date.accessioned 2014-01-23T08:25:15Z
dc.date.available 2014-01-23T08:25:15Z
dc.date.issued 2014-01-13
dc.identifier.issn 2340-5317
dc.identifier.uri http://hdl.handle.net/10251/35024
dc.description.abstract [EN] The inbound logistic for feeding the workstation inside the factory represents a critical issue in the car manufacturing industry. Nowadays, this issue is even more critical than in the past since more types of car are being produced in the assembly lines. Consequently, as workstations have to install many types of components, they also need to have an inventory of different types of the component in a compact space. The replenishment is a critical issue since a lack of inventory could cause line stoppage or reworking. On the other hand, an excess of inventory could increase the holding cost or even block the replenishment paths. The decision of the replenishment routes cannot be made without taking into consideration the inventory needed by each station during the production time which will depend on the production sequence. This problem deals with medium-sized instances and it is solved using online solvers. The contribution of this paper is a MILP for the replenishment and inventory of the components in a car assembly line. es_ES
dc.language Inglés es_ES
dc.publisher Editorial Universitat Politècnica de València
dc.relation.ispartof International Journal of Production Management and Engineering
dc.rights Reconocimiento - No comercial (by-nc) es_ES
dc.subject Integer Programming es_ES
dc.subject Routing es_ES
dc.subject Inventory es_ES
dc.subject Assembly line es_ES
dc.title MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line es_ES
dc.type Artículo es_ES
dc.date.updated 2014-01-23T08:14:14Z
dc.identifier.doi 10.4995/ijpme.2014.1838
dc.rights.accessRights Abierto es_ES
dc.description.bibliographicCitation Pulido, R.; Garcia-Sánchez, Á.; Ortega-Mier, M.; Brun, A. (2014). MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line. International Journal of Production Management and Engineering. 2(1):37-45. https://doi.org/10.4995/ijpme.2014.1838 es_ES
dc.description.accrualMethod SWORD es_ES
dc.relation.publisherversion https://doi.org/10.4995/ijpme.2014.1838 es_ES
dc.description.upvformatpinicio 37 es_ES
dc.description.upvformatpfin 45 es_ES
dc.description.volume 2
dc.description.issue 1
dc.identifier.eissn 2340-4876
dc.description.references Archetti, C., Bertazzi, L., Hertz, A., & Speranza, M. G. (2012). A Hybrid Heuristic for an Inventory Routing Problem. INFORMS Journal on Computing, 24(1), 101-116. doi:10.1287/ijoc.1100.0439 es_ES
dc.description.references Becker, C., & Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 168(3), 694-715. doi:10.1016/j.ejor.2004.07.023 es_ES
dc.description.references Czyzyk, J., Mesnier, M. P., & More, J. J. (1998). The NEOS Server. IEEE Computational Science and Engineering, 5(3), 68-75. doi:10.1109/99.714603 es_ES
dc.description.references Dolan, E. D. (2001). NEOS server 4.0 administrative guide. doi:10.2172/822567 es_ES
dc.description.references Eskigun, E., Uzsoy, R., Preckel, P. V., Beaujon, G., Krishnan, S., & Tew, J. D. (2005). Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers. European Journal of Operational Research, 165(1), 182-206. doi:10.1016/j.ejor.2003.11.029 es_ES
dc.description.references GHOSH, S., & GAGNON, R. J. (1989). A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research, 27(4), 637-670. doi:10.1080/00207548908942574 es_ES
dc.description.references Grønhaug, R., Christiansen, M., Desaulniers, G., & Desrosiers, J. (2010). A Branch-and-Price Method for a Liquefied Natural Gas Inventory Routing Problem. Transportation Science, 44(3), 400-415. doi:10.1287/trsc.1100.0317 es_ES
dc.description.references Jin, M., Luo, Y., & Eksioglu, S. D. (2008). Integration of production sequencing and outbound logistics in the automotive industry. International Journal of Production Economics, 113(2), 766-774. doi:10.1016/j.ijpe.2007.11.003 es_ES
dc.description.references Kaminsky, P., & Simchi-Levi, D. (2003). Production and Distribution Lot Sizing in a Two Stage Supply Chain. IIE Transactions, 35(11), 1065-1075. doi:10.1080/07408170304401 es_ES
dc.description.references Kazemi, S. M., Ghodsi, R., Rabbani, M., & Tavakkoli-Moghaddam, R. (2011). A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks. The International Journal of Advanced Manufacturing Technology, 55(9-12), 1111-1122. doi:10.1007/s00170-010-3120-6 es_ES
dc.description.references Laporte, G. (1992). The vehicle routing problem: An overview of exact and approximate algorithms. European Journal of Operational Research, 59(3), 345-358. doi:10.1016/0377-2217(92)90192-c es_ES
dc.description.references Moin, N. H., Salhi, S., & Aziz, N. A. B. (2011). An efficient hybrid genetic algorithm for the multi-product multi-period inventory routing problem. International Journal of Production Economics, 133(1), 334-343. doi:10.1016/j.ijpe.2010.06.012 es_ES
dc.description.references Monden Y (1983), Toyota production system: practical approach to production management, Industrial Engineering and Management Press, Institute of Industrial Engineers Norcross, GA. es_ES
dc.description.references Prajogo, D., & Olhager, J. (2012). Supply chain integration and performance: The effects of long-term relationships, information technology and sharing, and logistics integration. International Journal of Production Economics, 135(1), 514-522. doi:10.1016/j.ijpe.2011.09.001 es_ES
dc.description.references Régin, J.-C., & Puget, J.-F. (1997). A filtering algorithm for global sequencing constraints. Lecture Notes in Computer Science, 32-46. doi:10.1007/bfb0017428 es_ES
dc.description.references Volling, T., Matzke, A., Grunewald, M., & Spengler, T. S. (2013). Planning of capacities and orders in build-to-order automobile production: A review. European Journal of Operational Research, 224(2), 240-260. doi:10.1016/j.ejor.2012.07.034 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem