- -

Evaluation of risk impact of changes to Completion Times addressing model and parameter uncertainties

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Evaluation of risk impact of changes to Completion Times addressing model and parameter uncertainties

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Martorell Alsina, Sebastián Salvador es_ES
dc.contributor.author Martón Lluch, Isabel es_ES
dc.contributor.author Villamizar León, Maryory Patricia es_ES
dc.contributor.author Sánchez Galdón, Ana Isabel es_ES
dc.contributor.author Carlos Alberola, Sofía es_ES
dc.date.accessioned 2016-10-06T12:28:59Z
dc.date.available 2016-10-06T12:28:59Z
dc.date.issued 2014-10
dc.identifier.issn 0951-8320
dc.identifier.uri http://hdl.handle.net/10251/71312
dc.description.abstract This paper presents an approach and an example of application for the evaluation of risk impact of changes to Completion Times within the License Basis of a Nuclear Power Plant based on the use of the Probabilistic Risk Assessment addressing identification, treatment and analysis of uncertainties in an integrated manner. It allows full development of a three tired approach (Tier 1-3) following the principles of the risk-informed decision-making accounting for uncertainties as proposed by many regulators. Completion Time is the maximum outage time a safety related equipment is allowed to be down, e.g. for corrective maintenance, which is established within the Limiting Conditions for Operation included into Technical Specifications for operation of a Nuclear Power Plant. The case study focuses on a Completion Time change of the Accumulators System of a Nuclear Power Plant using a level 1 PRA. It focuses on several sources of model and parameter uncertainties. The results obtained show the risk impact of the proposed a change including both types of epistemic uncertainties is small as compared with current safety goals of concern to Tier 1. However, what concerns to Tier 2 and 3, the results obtained show how the use of some traditional and uncertainty importance measures helps in identifying high risky configurations that should be avoided in NPP technical specifications no matter the duration of CT (Tier 2), and other configurations that could take part of a configuration risk management program (Tier 3). es_ES
dc.description.sponsorship Authors are grateful to the Spanish Ministry of Science and Innovation for the financial support of this work (Research Project ENE2010-17449 and ENE2013-45540-R). en_EN
dc.language Inglés es_ES
dc.publisher Elsevier es_ES
dc.relation.ispartof Reliability Engineering and System Safety es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Probabilistic Risk Assessment es_ES
dc.subject Completion Times es_ES
dc.subject Allowed outage times es_ES
dc.subject Technical Specifications es_ES
dc.subject Uncertainty es_ES
dc.subject Risk-informed es_ES
dc.subject Decision-making es_ES
dc.subject.classification ESTADISTICA E INVESTIGACION OPERATIVA es_ES
dc.subject.classification INGENIERIA NUCLEAR es_ES
dc.title Evaluation of risk impact of changes to Completion Times addressing model and parameter uncertainties es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.1016/j.ress.2014.06.003
dc.relation.projectID info:eu-repo/grantAgreement/MICINN//ENE2010-17449/ES/DESARROLLO DE UNA METODOLOGIA BASADA EN EL APR PARA EL ESTUDIO DE MEJORAS EN LAS CLO DE LAS CCNN TENIENDO EN CUENTA EL EFECTO DE LAS INCERTIDUMBRES/ / es_ES
dc.relation.projectID info:eu-repo/grantAgreement/MINECO//ENE2013-45540-R/ES/DESARROLLO DE REQUISITOS DE VIGILANCIA AVANZADOS ENFOCADOS A LA SEGURIDAD Y COMPETITIVIDAD DE LA OPERACION A LARGO PLAZO DE CENTRALES NUCLEARES/ es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería Química y Nuclear - Departament d'Enginyeria Química i Nuclear es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Estadística e Investigación Operativa Aplicadas y Calidad - Departament d'Estadística i Investigació Operativa Aplicades i Qualitat es_ES
dc.description.bibliographicCitation Martorell Alsina, SS.; Marton Lluch, I.; Villamizar León, MP.; Sánchez Galdón, AI.; Carlos Alberola, S. (2014). Evaluation of risk impact of changes to Completion Times addressing model and parameter uncertainties. Reliability Engineering and System Safety. 130:190-201. doi:10.1016/j.ress.2014.06.003 es_ES
dc.description.accrualMethod S es_ES
dc.relation.publisherversion http://dx.doi.org/10.1016/j.ress.2014.06.003 es_ES
dc.description.upvformatpinicio 190 es_ES
dc.description.upvformatpfin 201 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 130 es_ES
dc.relation.senia 269112 es_ES
dc.identifier.eissn 1879-0836


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem