Geometric and harmonic means based priority dispatching rules for single machine scheduling problems

dc.contributor.authorAhmad, Shafies_ES
dc.contributor.authorKhan, Zahid Akhtares_ES
dc.contributor.authorAli, Mohammedes_ES
dc.contributor.authorAsjad, Mohammades_ES
dc.date.accessioned2021-07-29T09:53:37Z
dc.date.available2021-07-29T09:53:37Z
dc.date.issued2021-07-28
dc.description.abstract[EN] This work proposes two new prority dispatching rules (PDRs) for solving single machine scheduling problems. These rules are based on the geometric mean (GM) and harmonic mean (HM) of the processing time (PT) and the due date (DD) and they are referred to as GMPD and HMPD respectively. Performance of the proposed PDRs is evaluated on the basis of five measures/criteria i.e. Total Flow Time (TFT), Total Lateness (TL), Number of Late Jobs (TNL), Total Earliness (TE) and Number of Early Parts (TNE). It is found that GMPD performs better than other PDRs in achieving optimal values of multiple performance measures. Further, effect of variation in the weight assigned to PT and DD on the combined performance of TFT and TL is also examined which reveals that for deriving optimal values of TFT and TL, weighted harmonic mean (WHMPD) rule with a weight of 0.105 outperforms other PDRs. The weighted geometric mean (WGMPD) rule with a weight of 0.37 is found to be the next after WHMPD followed by the weighted PDT i.e. WPDT rule with a weight of 0.76.en_EN
dc.description.accrualMethodOJSes_ES
dc.description.bibliographicCitationAhmad, S.; Khan, ZA.; Ali, M.; Asjad, M. (2021). Geometric and harmonic means based priority dispatching rules for single machine scheduling problems. International Journal of Production Management and Engineering. 9(2):93-102. https://doi.org/10.4995/ijpme.2021.15217es_ES
dc.description.issue2es_ES
dc.description.referencesBaharom, M. Z., Nazdah, W., &Hussin, W. (2015). Scheduling Analysis for Job Sequencing in Veneer Lamination Line. Journal of Industrial and Intelligent Information, 3(3). https://doi.org/10.12720/jiii.3.3.181-185es_ES
dc.description.referencesChan, F. T. S., Chan, H. K., Lau, H. C. W., & Ip, R. W. L. (2003). Analysis of dynamic dispatching rules for a flexible manufacturing system. Journal of Materials Processing Technology, 138(1), 325-331. https://doi.org/10.1016/S0924-0136(03)00093-1es_ES
dc.description.referencesCheng, T. C. E., &Kahlbacher, H. G. (1993). Single-machine scheduling to minimize earliness and number of tardy jobs. Journal of Optimization Theory and Applications, 77(3), 563-573. https://doi.org/10.1007/BF00940450es_ES
dc.description.referencesda Silva, N. C. O., Scarpin, C. T., Pécora, J. E., & Ruiz, A. (2019). Online single machine scheduling with setup times depending on the jobs sequence. Computers & Industrial Engineering, 129, 251-258. https://doi.org/10.1016/j.cie.2019.01.038es_ES
dc.description.referencesDoh, H.H., Yu, J.M., Kim, J.S., Lee, D.H., & Nam, S.H. (2013). A priority scheduling approach for flexible job shops with multiple process plans. International Journal of Production Research, 51(12), 3748-3764. https://doi.org/10.1080/00207543.2013.765074es_ES
dc.description.referencesDominic, Panneer D. D., Kaliyamoorthy, S., & Kumar, M. S. (2004). Efficient dispatching rules for dynamic job shop scheduling. The International Journal of Advanced Manufacturing Technology, 24(1), 70-75.es_ES
dc.description.referencesÐurasević, M., &Jakobović, D. (2018). A survey of dispatching rules for the dynamic unrelated machines environment. Expert Systems with Applications, 113, 555-569. https://doi.org/10.1016/j.eswa.2018.06.053es_ES
dc.description.referencesForrester, P. (2006). Operations Management: An Integrated Approach. International Journal of Operations & Production Management.es_ES
dc.description.referencesGeiger, C. D., &Uzsoy, R. (2008). Learning effective dispatching rules for batch processor scheduling. International Journal of Production Research, 46(6), 1431-1454. https://doi.org/10.1080/00207540600993360es_ES
dc.description.referencesHamidi, M. (2016). Two new sequencing rules for the non-preemptive single machine scheduling problem. The Journal of Business Inquiry, 15(2), 116-127.es_ES
dc.description.referencesHolthaus, O., & Rajendran, C. (1997). New dispatching rules for scheduling in a job shop-An experimental study. The International Journal of Advanced Manufacturing Technology, 13(2), 148-153. https://doi.org/10.1007/BF01225761es_ES
dc.description.referencesHussain, M. S., & Ali, M. (2019). A Multi-agent Based Dynamic Scheduling of Flexible Manufacturing Systems. Global Journal of Flexible Systems Management, 20(3), 267-290. https://doi.org/10.1007/s40171-019-00214-9es_ES
dc.description.referencesJayamohan, M. S., & Rajendran, C. (2000). New dispatching rules for shop scheduling: A step forward. International Journal of Production Research, 38(3), 563-586. https://doi.org/10.1080/002075400189301es_ES
dc.description.referencesKadipasaoglu, S. N., Xiang, W., &Khumawala, B. M. (1997). A comparison of sequencing rules in static and dynamic hybrid flow systems. International Journal of Production Research, 35(5), 1359-1384. https://doi.org/10.1080/002075497195371es_ES
dc.description.referencesKanet, J. J., & Li, X. (2004). A Weighted Modified Due Date Rule for Sequencing to Minimize Weighted Tardiness. Journal of Scheduling, 7(4), 261-276. https://doi.org/10.1023/B:JOSH.0000031421.64487.95es_ES
dc.description.referencesLee, D.K., Shin, J.H., & Lee, D.H. (2020). Operations scheduling for an advanced flexible manufacturing system with multi-fixturing pallets. Computers & Industrial Engineering, 144, 106496. https://doi.org/10.1016/j.cie.2020.106496es_ES
dc.description.referencesLu, C.C., Lin, S.W., & Ying, K.C. (2012). Robust scheduling on a single machine to minimize total flow time. Computers & Operations Research, 39(7), 1682-1691. https://doi.org/10.1016/j.cor.2011.10.003es_ES
dc.description.referencesKrishnan, M., Chinnusamy, T. R., & Karthikeyan, T. (2012). Performance Study of Flexible Manufacturing System Scheduling Using Dispatching Rules in Dynamic Environment. Procedia Engineering, 38, 2793-2798. https://doi.org/10.1016/j.proeng.2012.06.327es_ES
dc.description.referencesMunir, E. U., Li, J., Shi, S., Zou, Z., & Yang, D. (2008). MaxStd: A task scheduling heuristic for heterogeneous computing environment. Information Technology Journal, 7(4), 679-683. https://doi.org/10.3923/itj.2008.679.683es_ES
dc.description.referencesOyetunji, E. O. (2009). Some common performance measures in scheduling problems. Research Journal of Applied Sciences, Engineering and Technology, 1(2), 6-9.es_ES
dc.description.referencesPinedo, M. L. (2009). Planning and Scheduling in Manufacturing and Services (2nd ed.). Springer-Verlag. https://doi.org/10.1007/978-1-4419-0910-7es_ES
dc.description.referencesPrakash, A., Chan, F. T. S., & Deshmukh, S. G. (2011). FMS scheduling with knowledge based genetic algorithm approach. Expert Systems with Applications, 38(4), 3161-3171. https://doi.org/10.1016/j.eswa.2010.09.002es_ES
dc.description.referencesRafsanjani, M. K., &Bardsiri, A. K. (2012). A New Heuristic Approach for Scheduling Independent Tasks on Heterogeneous Computing Systems. International Journal of Machine Learning and Computing, 371-376. https://doi.org/10.7763/IJMLC.2012.V2.147es_ES
dc.description.referencesTyagi, N., Tripathi, R. P., &Chandramouli, A. B. (2016). Single Machine Scheduling Model with Total Tardiness Problem. Indian Journal of Science and Technology, 9(37). https://doi.org/10.17485/ijst/2016/v9i37/97527es_ES
dc.description.referencesVinod, V., & Sridharan, R. (2008). Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis. The International Journal of Advanced Manufacturing Technology, 36(3), 355-372. https://doi.org/10.1007/s00170-006-0836-4es_ES
dc.description.referencesWaikar, A. M., Sarker, B. R., & Lal, A. M. (1995). A comparative study of some priority dispatching rules under different shop loads. Production Planning & Control, 6(4), 301-310. https://doi.org/10.1080/09537289508930284es_ES
dc.description.upvformatpfin102es_ES
dc.description.upvformatpinicio93es_ES
dc.description.volume9es_ES
dc.identifier.doi10.4995/ijpme.2021.15217
dc.identifier.eissn2340-4876
dc.identifier.urihttps://riunet.upv.es/handle/10251/170825
dc.languageIngléses_ES
dc.publisherUniversitat Politècnica de Valènciaes_ES
dc.relation.ispartofInternational Journal of Production Management and Engineeringes_ES
dc.relation.pasarelaOJS\15217es_ES
dc.relation.publisherversionhttps://doi.org/10.4995/ijpme.2021.15217es_ES
dc.relation.references10.12720/jiii.3.3.181-185es_ES
dc.relation.references10.1016/S0924-0136(03)00093-1es_ES
dc.relation.references10.1007/BF00940450es_ES
dc.relation.references10.1016/j.cie.2019.01.038es_ES
dc.relation.references10.1080/00207543.2013.765074es_ES
dc.relation.references10.1016/j.eswa.2018.06.053es_ES
dc.relation.references10.1080/00207540600993360es_ES
dc.relation.references10.1007/BF01225761es_ES
dc.relation.references10.1007/s40171-019-00214-9es_ES
dc.relation.references10.1080/002075400189301es_ES
dc.relation.references10.1080/002075497195371es_ES
dc.relation.references10.1023/B:JOSH.0000031421.64487.95es_ES
dc.relation.references10.1016/j.cie.2020.106496es_ES
dc.relation.references10.1016/j.cor.2011.10.003es_ES
dc.relation.references10.1016/j.proeng.2012.06.327es_ES
dc.relation.references10.3923/itj.2008.679.683es_ES
dc.relation.references10.1007/978-1-4419-0910-7es_ES
dc.relation.references10.1016/j.eswa.2010.09.002es_ES
dc.relation.references10.7763/IJMLC.2012.V2.147es_ES
dc.relation.references10.17485/ijst/2016/v9i37/97527es_ES
dc.relation.references10.1007/s00170-006-0836-4es_ES
dc.relation.references10.1080/09537289508930284es_ES
dc.rightsReconocimiento - No comercial - Sin obra derivada (by-nc-nd)es_ES
dc.rights.accessRightsAbiertoes_ES
dc.subjectJob sequencinges_ES
dc.subjectPriority dispatching rulees_ES
dc.subjectSingle machine schedulinges_ES
dc.subjectGeometric mean of the processing time and due date (GMPD)es_ES
dc.subjectHarmonic mean of the processing time and due date (HMPD)es_ES
dc.titleGeometric and harmonic means based priority dispatching rules for single machine scheduling problemses_ES
dc.typeArtículoes_ES
dc.type.versioninfo:eu-repo/semantics/publishedVersiones_ES
dspace.entity.typePublication
upv.uuid1048e313-298d-475e-8cee-4f7f5e158ae2es_ES

Archivos

Bloque original

Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
AhmadKhanAli - Geometric and harmonic means based priority dispatching rules for single machine s....pdf
Tamaño:
776.35 KB
Formato:
Adobe Portable Document Format
Descripción:
Versión editorial