Resumen

TFG en intercambio académico. KaHo Sint-Lieven University College. Ghent (Belgium)


[EN] This project is based on the study of a parking building, called "Keppekouter", in the town of Erembodegem (Belgium). The main objective is to track construction works and learn about the prefabricated construction process, which are widely used in the country, mainly due to weather conditions and the cost of labor. In this case, the work consists on precast and in situ elements, so both construction processes have been known. Another objective is to perform costs and duration scheduling plan of the work.


[ES] El proyecto está basado en el seguimiento de obra de un edificio destinado a aparcamiento en la localidad de Erembodegem (Bélgica), incidiendo en los procesos constructivos utilizados (elementos prefabricados y construcción "in situ"). Así mismo, se realiza la programación de la obra, en tiempo y costes. El parking consta de tres alturas y un semisótano sobre la rasante, con una altura total de 12,40 m. Se caracteriza por su planta divida en dos para combinar niveles de forjado alternativos que difieren media planta entre ellos. Este diseño junto con las rampas situadas en lados opuestos, crean el movimiento circular de los vehículos en su interior. El edificio consta de dos sótanos y un semisótano. La cimentación está realizada "in situ", hasta la rasante en un lado, y cota + 0,5 en otro. A partir de estos niveles se construye íntegramente mediante elementos prefabricados.

Fuente

DOI

Versión del editor

Enlaces relacionados

URL