Mostrar el registro completo del ítem
Asensio Cuesta, S.; Gómez-Gasquet, P. (2017). A model to define setup time sequence dependent flow shop scheduling considering productivity and ergonomic. Dyna. New Technologies. 5:1-15. doi:10.6036/NT8632
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/101451
Título: | A model to define setup time sequence dependent flow shop scheduling considering productivity and ergonomic | |
Otro titulo: |
|
|
Autor: | ||
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] The manufacturer industry is characterized by the presence of highly repetitive movements, which is a major risk factor associated with work musculoskeletal disorders (WMSDs). Moreover, this risk factor worsens when ...[+]
[ES] La industria manufacturera se caracteriza por la presencia de una
elevada repetitividad de movimientos de sus trabajadores, siendo éste un importante factor de riesgo asociado con los trastornos
musculoesqueléticos ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reserva de todos los derechos | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | http://dx.doi.org/10.6036/NT8632 | |
Tipo: |
|