- -

Improving IBM POWER8 Performance Through Symbiotic Job Scheduling

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

Improving IBM POWER8 Performance Through Symbiotic Job Scheduling

Show full item record

Feliu-Pérez, J.; Eyerman, S.; Sahuquillo Borrás, J.; Petit Martí, SV.; Eeckhout, L. (2017). Improving IBM POWER8 Performance Through Symbiotic Job Scheduling. IEEE Transactions on Parallel and Distributed Systems. 28(10):2838-2851. doi:10.1109/TPDS.2017.2691708

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/102503

Files in this item

Item Metadata

Title: Improving IBM POWER8 Performance Through Symbiotic Job Scheduling
Author:
UPV Unit: Universitat Politècnica de València. Departamento de Informática de Sistemas y Computadores - Departament d'Informàtica de Sistemes i Computadors
Issued date:
Abstract:
[EN] Symbiotic job scheduling, i.e., scheduling applications that co-run well together on a core, can have a considerable impact on the performance of processors with simultaneous multithreading (SMT) cores. SMT cores share ...[+]
Subjects: Symbiotic job scheduling , Performance estimation , Interference model , IBM POWER8 , Simultaneous multithreading (SMT)
Copyrigths: Reserva de todos los derechos
Source:
IEEE Transactions on Parallel and Distributed Systems. (issn: 1045-9219 )
DOI: 10.1109/TPDS.2017.2691708
Publisher:
Institute of Electrical and Electronics Engineers
Publisher version: http://doi.org/10.1109/TPDS.2017.2691708
Project ID: info:eu-repo/grantAgreement/EC/FP7/259295/EU
Thanks:
This work was supported in part by the Spanish Ministerio de Econom ıa y Competitividad (MINECO) and Plan E funds, under grants TIN2015-66972- C5-1-R and TIN2014-62246-EXP, as well as by the European Research Council under ...[+]
Type: Artículo

This item appears in the following Collection(s)

Show full item record