- -

Rescheduling in job-shop problems for sustainable manufacturing systems

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Rescheduling in job-shop problems for sustainable manufacturing systems

Mostrar el registro completo del ítem

Salido Gregorio, MA.; Escamilla Fuster, J.; Barber Sanchís, F.; Giret Boggino, AS. (2017). Rescheduling in job-shop problems for sustainable manufacturing systems. Journal of Cleaner Production. 162(20):121-132. https://doi.org/10.1016/j.jclepro.2016.11.002

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/104443

Ficheros en el ítem

Metadatos del ítem

Título: Rescheduling in job-shop problems for sustainable manufacturing systems
Autor: Salido Gregorio, Miguel Angel Escamilla Fuster, Joan Barber Sanchís, Federico Giret Boggino, Adriana Susana
Entidad UPV: Universitat Politècnica de València. Departamento de Sistemas Informáticos y Computación - Departament de Sistemes Informàtics i Computació
Fecha difusión:
Fecha de fin de embargo: 2019-01-01
Resumen:
[EN] Manufacturing industries are faced with environmental challenges, so their industrial processes must be optimized in terms of both profitability and sustainability. Since most of these processes are dynamic, ...[+]
Palabras clave: Manufacturing problem , Multi-objective , Rescheduling , Memetic algorithm , Energy consumption
Derechos de uso: Reserva de todos los derechos
Fuente:
Journal of Cleaner Production. (issn: 0959-6526 )
DOI: 10.1016/j.jclepro.2016.11.002
Editorial:
Elsevier
Versión del editor: http://doi.org/10.1016/j.jclepro.2016.11.002
Código del Proyecto:
info:eu-repo/grantAgreement/MINECO//TIN2015-65515-C4-1-R/ES/ARQUITECTURA PERSUASIVA PARA EL USO SOSTENIBLE E INTELIGENTE DE VEHICULOS EN FLOTAS URBANAS/
info:eu-repo/grantAgreement/EC/FP7/609491/EU/Technology Transfer in Computing Systems/
info:eu-repo/grantAgreement/MINECO//TIN2016-80856-R/ES/TECNOLOGIAS INTELIGENTES PARA LA RESOLUCION CENTRALIZADA Y DISTRIBUIDA DE PROBLEMAS DE SCHEDULING SOSTENIBLE EN PROCESOS INDUSTRIALES Y LOGISTICOS/
Agradecimientos:
This research has been supported by the Seventh Framework Programme under the research project TETRACOM-GA609491 and the Spanish Government under research projects TIN2013-46511-C2-1, TIN2015-65515-C4-1-R and TIN2016-80856-R. ...[+]
Tipo: Artículo

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem