- -

Estudio de la utilización del Canal Júcar-Turia para el suministro de agua en sentido inverso a la planta potabilizadora de El Realón desde el Río Turia

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Estudio de la utilización del Canal Júcar-Turia para el suministro de agua en sentido inverso a la planta potabilizadora de El Realón desde el Río Turia

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Espert Alemany, Vicent B. es_ES
dc.contributor.advisor Sancho Iranzo, Heliodoro es_ES
dc.contributor.author Martínez Gutiérrez, Carlos Andrés es_ES
dc.coverage.spatial east=-0.5636136000000533; north=39.2075941; name=Canal Júcar-Turia, 46291, València, Espanya es_ES
dc.coverage.spatial east=-0.47630129999993187; north=39.3940645; name=Potabilizadora El Realon, 46220 Picassent, Valencia, Espanya es_ES
dc.date.accessioned 2018-10-16T06:11:38Z
dc.date.available 2018-10-16T06:11:38Z
dc.date.created 2018-07-16
dc.date.issued 2018-10-16 es_ES
dc.identifier.uri http://hdl.handle.net/10251/110506
dc.description.abstract En la actualidad la ciudad de Valencia es abastecida de agua potable desde las plantas potabilizadoras de El Realón y La Presa. La potabilizadora de El Realón, ubicada en Picassent, tiene como única fuente de suministro el agua proveniente del embalse de Tous a través del canal Júcar-Turia, mientras que la potabilizadora de La Presa (Manises) se abastece de este mismo canal, en su punto final, pero adicionalmente del rio Turia. La continuidad del suministro de agua potable para gran parte de la ciudad de Valencia y su área metropolitana está sujeta al funcionamiento permanente del canal Júcar-Turia. Adicionalmente, debido a esa necesidad de mantener el abastecimiento continuo de Valencia y su área metropolitana, trabajos de reparación y limpieza del canal no han podido realizarse debido a que se ubican aguas arriba de la planta de El Realón, y de hacerse se tendría que cortar el suministro de agua, lo cual no es viable. Existen varias alternativas para el suministro de agua a El Realón, entre las cuales está el bombeo directo desde la Acequia Real del Júcar, el cual está ubicado a 12 km aguas arriba de la potabilizadora. Esta alternativa es viable siempre y cuando los trabajos de mantenimiento y reparación se sitúen entre la presa de Tous y el citado bombeo, pero no sirve cuando el tramo a mantener o reparar se sitúa entre este punto y la Planta. Otra alternativa son los pozos de riego que están ubicados a lo largo del canal, pero la capacidad de estos es limitada. Existen otras alternativas ya estudiadas, pero ninguna ha sido viable por temas tanto técnicos como económicos. Dado que las alternativas anteriormente planteadas para un suministro alternativo de agua potable a la planta de El Realón no son viables, EMIVASA ha planteado una nueva alternativa, y gracias a la Catedra Aguas de Valencia se me otorgó el estudio de esta, para determinar la viabilidad y su posible implementación. Esta nueva alternativa consiste en el funcionamiento inverso del tramo del Canal entre la planta potabilizadora de El Realón y su conexión final con el río Turia, donde está ubicada la potabilizadora de La Presa. Esta alternativa se cree viable dado que la distancia existente entre la planta de El Realón y el río Turia es de 17,6 km, con una diferencia de cotas de 9,60 m, lo que supone una pendiente media de 0,055 %. Lo anterior se pretende conseguir mediante la distribución de una serie de bombeos entre ambos puntos, de manera que se impulse agua entre los tramos definidos mediante las paradas (vertederos) existentes en el Canal, haciendo llegar los caudales impulsados desde el río Turia hasta la parada de la planta de El Realón. Los tramos entre las paradas existentes funcionarían como depósitos en serie desde los cuales se iría elevando el caudal deseado. Para el estudio de la nueva alternativa planteada se desarrollarán las siguientes fases: Recopilación de información del Canal Júcar-Turia entre la ETAP de El Realón y el río Turia; en concreto: planta y perfil, secciones transversales, datos de las paradas intermedias existentes, etc. Aplicación del programa HEC-RAS a un canal piloto, el cual representa un caso simple de bombeo entre tramos de un canal, con objeto de familiarizarse con las capacidades de este programa. Modelización en régimen transitorio mediante HEC-RAS del funcionamiento del Canal en sentido inverso para un caudal de 2 m3/s, entre el río Turia y la ETAP de El Realón. Establecimiento del número de paradas (vertederos) existentes a emplear y su ubicación final, así como de la posición y características de las nuevas paradas a introducir en caso que sea necesario hacerlo. Selección del número y características de los grupos de bombeo a instalar en cada parada, para impulsar el caudal a transportar desde el río Turia hasta la parada de El Realón. Diseño a nivel esquemático de las arquetas de aspiración de los grupos de bombeo es_ES
dc.description.abstract Nowadays, the city of Valencia is supplied with drinking water from the water treatment plants of El Realón and La Presa. The water treatment plant of El Realón located in Picassent has as its sole source of supply the water from the Tous reservoir through the Júcar-Turia channel, while the La Presa water treatment plant is supplied with this same channel, at its end point, but additionally from the Turia river. The continuity of the drinking water supply for a large part of the city of Valencia and its metropolitan area is subject to the permanent operation of the Júcar-Turia channel. In addition, due to the need to maintain the continuous operation of the channel, repair and cleaning works have not been able to be carried out, because they are located upstream of the El Realón plant, and if this were done, the water supply would have to be cut off, which is not viable. There are several alternatives for the water supply to El Realón, one of them being the direct pumping from the Acequia Real del Júcar, which is located 12 km upstream of the water treatment plant; this alternative is viable as long as the maintenance and repairing works are located between the Tous dam and the aforementioned pumping, but that does not work when the section to be maintained or repaired is located between this point and the Realón Plant. Another alternative is the irrigation wells that are located along the channel, but the capacity of these wells is limited. There are other alternatives already studied, but none of them has been viable due to technical and economic issues Given that the alternatives previously proposed to supply raw water to the El Realón plant are not viable, EMIVASA has proposed a new alternative, and thanks to the Aguas de Valencia chair I was granted the study of this, to determine the feasibility and its possible implementation. This new alternative consists of the reverse operation of the Channel section between the El Realón water treatment plant and its final connection with the Turia river, where La Presa water treatment plant is located, which is believed to be viable given that the distance between the Realón plant and the Turia River is 17.6 km, with a difference in levels of 9.60 m, which implies an average slope of 0.054%. The above is intended to be achieved through the distribution of a serie of pumping plants between the two points, so that water is driven between the sections defined by the stops (weirs) in the channel, reaching the flow rates from the Turia River to the stop of the El Realón plant. The sections between the existing stops will work as serial tanks from which the desired flow will be elevated. The following phases will be developed for the study of the new proposed alternative: Collection of information from the Júcar-Turia Canal between El Realón treatment plant and the Turia river; in particular: plant and profile, cross sections, data of existing intermediate stops, etc. Application of the HEC-RAS software to a pilot channel, which represents a simple case of pumping between sections of a channel, in order to become familiar with the capabilities of this software. Unsteady modeling through HEC-RAS of the operation of the Channel in reverse direction for a flow of 2 m3/s, between the Turia river and El Realón. Establishment of the number of stops (weirs) to be used and their final location, as well as the position and characteristics of the new stops to be introduced if necessary. Selection of the number and characteristics of the pumping groups to be installed at each stop, to drive the flow to be transported from the Turia river to the El Realón stop. Schematic design of the suction wells of the pumping groups. Application of the model developed to simulate the behavior of the system in the stop and start maneuvers of the pumping stations. Scheduled start-up plan of the pumping stations. Selection of optimal operating alterna es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Paradas; Estaciones de Bombeo; Maniobras de arranque y parada es_ES
dc.subject Weis; Pumping Stations; strat-up and shut-down maneuvers es_ES
dc.subject.classification INGENIERIA HIDRAULICA es_ES
dc.subject.other Máster Universitario en Ingeniería Hidráulica y Medio Ambiente-Màster Universitari en Enginyeria Hidràulica i Medi Ambient es_ES
dc.title Estudio de la utilización del Canal Júcar-Turia para el suministro de agua en sentido inverso a la planta potabilizadora de El Realón desde el Río Turia es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería Hidráulica y Medio Ambiente - Departament d'Enginyeria Hidràulica i Medi Ambient es_ES
dc.description.bibliographicCitation Martínez Gutiérrez, CA. (2018). Estudio de la utilización del Canal Júcar-Turia para el suministro de agua en sentido inverso a la planta potabilizadora de El Realón desde el Río Turia. http://hdl.handle.net/10251/110506 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\87680 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem