Mostrar el registro sencillo del ítem
dc.contributor.advisor | Antonino Daviu, José Alfonso | es_ES |
dc.contributor.author | Mas Arroyo, Adrián | es_ES |
dc.coverage.spatial | east=-1.1203969000000598; north=39.5003905; name=Calle del Metal, 15, 46340 Requena, Valencia, Espanya | es_ES |
dc.date.accessioned | 2018-11-21T09:08:16Z | |
dc.date.available | 2018-11-21T09:08:16Z | |
dc.date.created | 2018-09-28 | |
dc.date.issued | 2018-11-21 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/112857 | |
dc.description.abstract | [ES] El siguiente trabajo de fin de master , en adelante TF M , desarrolla el plan de mantenimiento de una nave industrial, en concreto un taller de ferralla y estructura metálica. Dicho taller se encuentra en el polígono del Romeral, en el municipio de Requena. En este TF M se repasan los tipos de mantenimiento industrial, dedicando especial atención a los más importantes como son el mantenimiento correctivo, preventivo y predictivo. Se verán las principales ventajas e inconvenientes de los tres y una comparativa. A continuación, se e numeran y detallan las principales verificaciones eléctricas a efectuar en una instalación eléctrica de B.T. Se describen con detalle los ensayos normativos, el equipamiento necesario y los valores límite a cumplir según la normativa . Estas comprobaciones eléctricas se aplican a la instalación antes comentada. Se describen con detalle los ensayos efectuados y se interpretan los resultados obtenidos. A partir de estos resultados , se puede evaluar el estado de la instalación eléctrica y proceder a la modific ación o sustitución de los elementos que lo necesiten. Se incluye un presupuesto del coste de aplicación de este plan. El TFM también incluye diferentes planos como son el de situación, planta y esquema unifilar. El presente TFM se ha realizado con vario s programas de software como son el AutoCAD , CieBT y Excel. | es_ES |
dc.description.abstract | [EN] This final bachelor thesis, from now on TFM , explains the maintenance plan of an industrial plant that consists in a metallic workshop. The workshop is placed in the industrial area known as ‘the Romeral’ in Requena. In this TFM , the different types of industrial maintenance are reviewed, drawing special attention to the most important such as corrective maintenance, preventive maintenance and predictive maintenance. The main advantages and drawbacks of all three will be analyzed and compared. Afterwards, the main verifications to be carried out in a Low Voltage industrial electrical installation are listed and explained in detail. The standard tests, the necessary equipment as well as the limit values established by the regulation are explained in detail. These electrical verifications are appli ed to the aforementioned real industrial installation. The different tests are described in detail and the obtained results are interpreted. Taking into consideration the results, the condition of the electrical installation is evaluated and it is propose d substitution of the elements that need replacement. A bud get of the implementation costs of the plan is included. The TFM also includes different plans, such as the location map, the floorplan and one - wire diagram. This TFM has been deve loped using various software programs such as AutoCAD , CieBT and Excel. | es_ES |
dc.format.extent | 112 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Mantenimiento | es_ES |
dc.subject | Maquinaria | es_ES |
dc.subject | Instalación eléctrica | es_ES |
dc.subject | Plan de mantenimiento | es_ES |
dc.subject | Ingeniería eléctrica | es_ES |
dc.subject | Gestión del mantenimiento | es_ES |
dc.subject.classification | INGENIERIA ELECTRICA | es_ES |
dc.subject.other | Máster Universitario en Ingeniería del Mantenimiento-Màster Universitari en Enginyeria del Manteniment | es_ES |
dc.title | Mejora del plan de mantenimiento de la instalación eléctrica en un taller industrial | es_ES |
dc.type | Tesis de máster | es_ES |
dc.rights.accessRights | Cerrado | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería Eléctrica - Departament d'Enginyeria Elèctrica | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingeniería del Diseño - Escola Tècnica Superior d'Enginyeria del Disseny | es_ES |
dc.description.bibliographicCitation | Mas Arroyo, A. (2018). Mejora del plan de mantenimiento de la instalación eléctrica en un taller industrial. Universitat Politècnica de València. http://hdl.handle.net/10251/112857 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\84458 | es_ES |