- -

Propuesta de sistema de recogida de aguas pluviales para la posterior reutilización en sistema de bombeo para riego

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Propuesta de sistema de recogida de aguas pluviales para la posterior reutilización en sistema de bombeo para riego

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Pérez Sánchez, Modesto es_ES
dc.contributor.author Vidal López de la Franca, Sara es_ES
dc.date.accessioned 2019-01-14T11:59:26Z
dc.date.available 2019-01-14T11:59:26Z
dc.date.created 2018-09-20
dc.date.issued 2019-01-14 es_ES
dc.identifier.uri http://hdl.handle.net/10251/115394
dc.description.abstract [ES] En este proyecto se plantea la necesidad de instalar un sistema de aprovechamiento de aguas pluviales, para su posterior uso en riego en el municipio de Pinar de Campoverde, donde el clima es de estepa local. Concretamente, en este proyecto se ha realizado un análisis de la zona de riego. En primer lugar, se ha procedido a delimitar la cuenca para posteriormente saber cuánta agua se recoge en el valle de esta, mediante un estudio de la pluviometría de la zona. Tras esto, se han determinado las necesidades hídricas de la zona del proyecto para poder dimensionar el depósito, realizando también un estudio de los cálculos estructurales del muro de contención de agua. Una vez calculado el depósito, se ha diseñado el sistema de riego, y se han organizado las horas de riego de la zona del proyecto. Tras esto, se ha determinado el caudal máximo y la altura máxima que debe tener la bomba hidráulica para satisfacer las presiones mínimas en todos los puntos de demanda de la zona de riego. Finalmente, se ha escogido la bomba del catálogo de bombas Ideal. es_ES
dc.description.abstract [EN] This project raises the need to install a rainwater harvesting system for use it in irrigation in the municipality of Pinar de Campoverde where the climate is local steppe. Specifically, in this project we made an analysis of the area of irrigation. In first place, the basin has been delimited for knowing how much water is collected in the valley of the basin through a study of the rainfall in the area. Afterwards, the water needs of the project area have been determined in order to be able to size the deposit, also carrying out a study of the structural calculations of the water retaining wall. Once the deposit has been calculated, the irrigation system has been designed, and the irrigation hours of the project area have been organized. After this, the maximum flow rate and the maximum height that the hydraulic pump must have to satisfy the minimum pressures in all the demand points of the irrigation area has been determined. Finally, the bomb of the Ideal pump catalog has been chosen. es_ES
dc.format.extent 82 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Riego eficiente es_ES
dc.subject Aguas pluviales es_ES
dc.subject Eficiencia hídrica es_ES
dc.subject Sistema de bombeo es_ES
dc.subject.classification MECANICA DE FLUIDOS es_ES
dc.subject.classification INGENIERIA HIDRAULICA es_ES
dc.subject.other Grado en Ingeniería Mecánica-Grau en Enginyeria Mecànica es_ES
dc.title Propuesta de sistema de recogida de aguas pluviales para la posterior reutilización en sistema de bombeo para riego es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Abierto es_ES
dc.description.bibliographicCitation Vidal López De La Franca, S. (2018). Propuesta de sistema de recogida de aguas pluviales para la posterior reutilización en sistema de bombeo para riego. http://hdl.handle.net/10251/115394 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\89718 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem