- -

Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Nieto, Enrique es_ES
dc.contributor.author Moyano, Juan José es_ES
dc.contributor.author García, Álvaro es_ES
dc.date.accessioned 2019-02-06T08:42:21Z
dc.date.available 2019-02-06T08:42:21Z
dc.date.issued 2019-01-28
dc.identifier.uri http://hdl.handle.net/10251/116465
dc.description.abstract [EN] Building Information Modelling (BIM) is a collaborative system used extensively in the design and management of the Architecture, Engineering and Construction (AEC) industries. Current platforms manage the information as data centres (i.e. databases) related to graphical representations located in 3D parametric models. Today, these new technologies are nowadays being incorporated in heritage assets. This paper aims to establish a methodology, based on these efficient platforms, for studying built heritage, including historical and construction aspects by adding the chronology of those interventions made in the historic building. This case study is focused on the Palace of the Children of Don Gome, a historic building located in the city of Andújar, in Jaén (Spain). The interest of this case study lies in the historic innovations and areas added to this palace. Likewise, the collection and manipulation of the graphic information and data related to the interventions have been based on an interoperable 3D graphic model, which allows users to include all the related documentation from different disciplines associated with the conservation and heritage restoration processes. In this paper, the construction process carried out during the last restoration of the building is studied. Specifically, it analyses the last building intervention in 1989, in particular an area of the coffered ceiling slab in the northern nave, located on the first floor. Within this model, all the elements that constitute the roof of the tower, mudwall walls, slabs and coffered ceilings of the northern nave have been studied, using photogrammetry for data acquisition and 3D modelling, and these data are included in a 3D digital model of the building generated using ArchiCAD software. Moreover, the system will be used to improve the management of the information obtained during heritage maintenance, creating a record of the whole building life cycle. As well as the historical documentation and graphical research, and the analysis of the procedures carried out during the last refurbishment of the building, new building construction system proposals have arisen which have been modelled to fulfil the Level Of Development (LOD) 300. Further analysis of these construction solutions used provides knowledge of how large 16th century palaces were built, and the kind of restoration conducted by architects at the end of the 20th century. The results obtained show how current BIM platforms are able to record construction and evolutionary aspects of a building’s history, by identifying all the original elements and classifying them before their demolition. Also, by making a detailed inventory of the whole coffered ceiling in which the position and the temporal order (original – later addition) of the elements are included, it is possible to virtually replace those elements in their original positions, reducing the visual impact of the intervention. On the other hand, multiple errors in projects based on graphical systems of representation, mainly Computer-Aided Design (CAD), may derive from contradictions in the official sources consulted, such as the plans of the cadastre, the city council, and those produced through manual measurement procedures. However, in this paper, real graphical documentation has been generated using specific 3D surveying techniques for capturing geometry and accurate measurements, as well as by utilising the BIM system. es_ES
dc.description.abstract [ES] El presente documento pretende exponer una metodología eficiente para el estudio del patrimonio construido que englobe aspectos históricos y constructivos al incorporar la cronología de las intervenciones realizadas en el edificio histórico. El caso de estudio se centra en el Palacio de los niños de Don Gome, un edificio histórico situado en la localidad de Andújar, en Jaén (España). La recopilación y manipulación de la información gráfica y de datos relacionados se sustentará en un modelo gráfico 3D interoperable, que permita una gestión de toda la documentación integrada en el mismo desde todos los campos disciplinares relacionados con el proceso de conservación y rehabilitación patrimonial. Además, el sistema permitirá ampliar la gestión de la información que se obtiene en el mantenimiento del patrimonio, cumpliendo así su ciclo de vida. En el trabajo expuesto se analiza el proceso constructivo llevado a cabo en la última rehabilitación del edificio. En concreto, se analiza la fase realizada en la última intervención del edificio en el año 1989 y en una zona puntual del artesonado del forjado de la Nave Norte, situada en la primera planta. Estos datos se incluyen en un modelo digital 3D de información del edificio generado mediante el software ArchiCAD. Dentro del propio modelo se han estudiado en profundidad todos los elementos que conforman la cubierta de la torre, los muros de tapial, forjados, cubiertas y artesonados de la nave norte, empleando en esta última zona la fotogrametría como técnica de adquisición de datos y reproducción en 3D. Se lleva a cabo una clasificación tipológica de los elementos singulares de los canes originales del siglo XVI en el modelo 3D y se implanta un nuevo procedimiento de marcadores de revisión que identifican tanto las omisiones del proyecto como las intervenciones a lo largo de la historia del edificio patrimonial en el Proyecto HBIM. Lo más destacado: Estudio constructivo mediante tecnología BIM que desarrolla la clasificación tipológica de los elementos singularede valor histórico en el patrimonio arquitectónico. Registro, organización de datos y marcadores de revisión que identifican las fases de intervención en el ProyectHBIM. Análisis del proceso constructivo de la rehabilitación de 1989 del Palacio de los niños de Don Gome en Andújar bajo un enfoque BIM. es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València
dc.relation.ispartof Virtual Archaeology Review
dc.rights Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) es_ES
dc.subject Proyecto HBIM (Modelado Histórico de Información para la Construcción) es_ES
dc.subject Modelo de información patrimonial es_ES
dc.subject Fotogrametría es_ES
dc.subject Arqueología de la arquitectura es_ES
dc.subject BIM es_ES
dc.subject HBIM (Historic Building Information Modelling) Project es_ES
dc.subject Heritage information model es_ES
dc.subject Photogrammetry es_ES
dc.subject Archaeology of architecture es_ES
dc.title Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project es_ES
dc.title.alternative Estudio constructivo del Palacio de los Niños de Don Gome (Andújar, Jaén), gestionado desde el proyecto HBIM es_ES
dc.type Artículo es_ES
dc.date.updated 2019-02-05T13:51:48Z
dc.identifier.doi 10.4995/var.2019.10567
dc.rights.accessRights Abierto es_ES
dc.description.bibliographicCitation Nieto, E.; Moyano, JJ.; García, Á. (2019). Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project. Virtual Archaeology Review. 10(20):84-97. https://doi.org/10.4995/var.2019.10567 es_ES
dc.description.accrualMethod SWORD es_ES
dc.relation.publisherversion https://doi.org/10.4995/var.2019.10567 es_ES
dc.description.upvformatpinicio 84 es_ES
dc.description.upvformatpfin 97 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 10
dc.description.issue 20
dc.identifier.eissn 1989-9947
dc.description.references Angulo Fornos, R. (2013). Construcción de la base gráfica para un sistema de información y gestión del patrimonio arquitectónico: Casa de Hylas. Arqueología de la Arquitectura, (9), 11-25. https://doi.org/10.3989/arqarqt.2012.10005 es_ES
dc.description.references Antón, D., Medjdoub, B., Shrahily, R., & Moyano, J. (2018). Accuracy evaluation of the semi-automatic 3D modeling for historical building information models. International Journal of Architectural Heritage, 12(5), 790-805. https://doi.org/10.1080/15583058.2017.1415391 es_ES
dc.description.references Banfi, F., Fai, S., & Brumana, R. (2017). BIM automation: advanced modeling generative process for complex structures. ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences, IV-2/W2, 9-16. https://doi.org/10.5194/isprs-annals-IV-2-W2-9-2017 es_ES
dc.description.references Barazzetti, l., Banfi, F., Brumana, R., Oreni, D., Previtali, M., & Roncoroni, F. (2015). HBIM and augmented information: towards a wider user community of image and range-based reconstructions. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XL-5/W7, 35-42. https://doi.org/10.5194/isprsarchives-XL-5-W7-35-2015 es_ES
dc.description.references Barbosa, M. J., Pauwels, P., Ferreira, V., & Mateus, L. (2016). Towards increased BIM usage for existing building interventions. Structural Survey, 34(2), 168-190. https://doi.org/10.1108/SS-01-2015-0002 es_ES
dc.description.references Bassier, M., Hadjidemetriou, G., Vergauwen, M., Van Roy, N., & Verstrynge, E. (2016). Implementation of Scan-to-BIM and FEM for the Documentation and Analysis of Heritage Timber Roof Structures. In M. Ioannides, E. Fink, A. Moropoulou, M. Hagedorn-Saupe, A. Fresa, G. Liestøl, V. Rajcic, & P. Grussenmeyer (Eds.), Digital Heritage. Progress in Cultural Heritage: Documentation, Preservation, and Protection. EuroMed 2016. Lecture Notes in Computer Science, 10058, 79-90. https://doi.org/10.1007/978-3-319-48496-9_7 es_ES
dc.description.references Bosché, F., Ahmed, M., Turkan, Y., Haas, C. T., & Haas, R. (2015). The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components. Automation in Construction, 49, 201-213. https://doi.org/10.1016/j.autcon.2014.05.014 es_ES
dc.description.references Bruno, S., De Fino, M., & Fatiguso, F. (2018). Historic Building Information Modelling: performance assessment for diagnosis-aided information modelling and management. Automation in Construction, 86, 256-276. https://doi.org/10.1016/j.autcon.2017.11.009 es_ES
dc.description.references Brumana, R., Georgopoulos, A., Oreni, D., Raimondi, A., & Reggiani, A. (2013). HBIM for documentation, dissemination and management of built heritage. The case study of St. Maria in Scaria d'Intelvi. International Journal of Heritage in the Digital Era, 2(3), 433-451. https://doi.org/10.1260/2047-4970.2.3.433 es_ES
dc.description.references Brumana, R., Oreni, D., Cuca, B., Binda, L., Condoleo, P., & Triggiani, M. (2014). Strategy for integrated surveying techniques finalized to interpretive models in a Byzantine church, Mesopotam, Albania. International Journal of Architectural Heritage, 8(6), 886-924. https://doi.org/10.1080/15583058.2012.756077 es_ES
dc.description.references Cicaló, E. (2016). B.I.M. per la rappresentazione del patrimonio costruito storico. Il rilievo delle facciate decorate Liberty e Art Dèco. DisegnareCon, 9(16), 18.1-18.10. Retrieved from http://disegnarecon.univaq.it/ojs/index.php/disegnarecon/article/viewFile/141/114 es_ES
dc.description.references de Torres Laguna, C., 1981. Andújar a través de sus actas capitulares (1600-1850). Jaén: Instituto de Estudios Giennenses (CSIC). es_ES
dc.description.references Domínguez, J. (1999). Sobre la construcción del andujare-o palacio "Los Ni-os de Don Gome". Boletín del Instituto de Estudios Giennenses, 172(2), 983-1004. Retrieved from https://dialnet.unirioja.es/servlet/articulo?codigo=1213257 es_ES
dc.description.references Dore, C., Murphy, M., Mccarthy, S., Brechin, F., Casidy, C., & Dirix, E. (2015). Structural simulations and analyzes of conservation - historical building information modeling (HBIM). The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XL-5/W4, 351-357. https://doi.org/10.5194/isprsarchives-XL-5-W4-351-2015 es_ES
dc.description.references Dore, C., & Murphy, M. (2017). Current state of the art historic building information modelling. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XLII-2/W5, 185-192. https://doi.org/10.5194/isprs-archives-XLII-2-W5-185-2017 es_ES
dc.description.references Eastman, C.M., Eastman, C., Teicholz, P., & Sacks, R. (2011). BIM Handbook: A guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors. Hoboken, New Jersey: John Wiley & Sons. es_ES
dc.description.references Fai, S., Graham, K., Duckworth, T., Wood, N., & Attar, R. (2011). Building information modelling and heritage documentation. 18th International Conference on Virtual Systems and Multimedia, XXIII CIPA Symposium, 2011 Prague, Czech Republic (pp. 12-16). Retrieved from https://d2f99xq7vri1nk.cloudfront.net/legacy_app_files/pdf/Fai.pdf es_ES
dc.description.references Fai, S., Filippi, M., & Paliaga, S. (2013). Parametric Modelling (BIM) for the documentation of vernacular construction methods: A BIM model for the Commissariat Building, Ottawa, Canada. ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences, II-5/W1, 115-120. https://doi.org/10.5194/isprsannals-II-5-W1-115-2013 es_ES
dc.description.references García-Valldecabres, J., Pellicer, E., & Jordan-Palomar, I. (2016). BIM Scientific Literature Review for Existing Buildings and a Theoretical Method: Proposal for Heritage Data Management Using HBIM. Construction Research Congress (pp. 2228-2239). San Juan, Puerto Rico. https://doi.org/10.1061/9780784479827.222 es_ES
dc.description.references García, E. S., García-Valldecabres, J., & Blasco, M. J. V. (2018). The use of HBIM models as a tool for dissemination and public use management of historical architecture: A review. International Journal of Sustainable Development and Planning, 13(1), 96-107. https://doi.org/10.2495/SDP-V13-N1-96-107 es_ES
dc.description.references García Gascón, Á. (2015). Estudio y análisis histórico, evolutivo y constructivo del Palacio de los Niños de Don Gome (Andújar, Jaén), gestionado por un modelo gráfico de información (B.I.M.) (Trabajo Fin de Grado). Universidad de Sevilla. es_ES
dc.description.references Hajian, H., & Becerik-Gerber, B. (2010). Scan to BIM: factors affecting operational and computational errors and productivity loss. 27th International Symposium on Automation and Robotics in Construction (pp. 265-272). Retrieved from http://www.iaarc.org/publications/fulltext/Scan_to_BIM_factors_affecting_operational_and_computational_errors_and_productivity_loss.pdf. es_ES
dc.description.references Jerónimo, M., Pauwels, P., Ferreira, V., & Mateus, L. (2016). Towards increased BIM usage for existing building interventions. Structural Survey, 34(2), 168-190. https://doi.org/10.1108/SS-01-2015-0002 es_ES
dc.description.references Lee, G., Sacks, R., & Eastman, C. M. (2006). Specifying parametric building object behavior (BOB) for a building information modeling system. Automation in Construction, 15(6), 758-776. https://doi.org/10.1016/j.autcon.2005.09.009 es_ES
dc.description.references Logothetis, S., Delinasiou, A., & Stylianidis, E. (2015). Building Information Modelling for Cultural Heritage: A review. ISPRS Annals of Photogrammetry, Remote Sensing and Spatial Information Sciences, II-5/W3, 177-183. https://doi.org/10.5194/isprsannals-II-5-W3-177-2015 es_ES
dc.description.references López, F. J., Lerones, P. M., Llamas, J., Gómez-García-Bermejo, J., & Zalama, E. (2018). A review of heritage building information modeling (H-BIM ). Multimodal Technologies and Interaction, 2(21), 1-29. https://doi.org/10.3390/mti2020021 es_ES
dc.description.references Mediavilla, A., Izkara, J. L., & Prieto, I. (2015). HOLISTEEC - Plataforma colaborativa en la nube basada en BIM para el dise-o de edificios energéticamente eficientes. Spanish Journal of BIM, 15(1), 4-11. Retrieved from https://dialnet.unirioja.es/servlet/articulo?codigo=5496888 es_ES
dc.description.references Moyano, J. J., Barrera, J. A., Nieto, J. E., Marín,, D. & Antón, D. (2017). a Geometrical Similarity Pattern As an Experimental Model for Shapes in Architectural Heritage: a Case Study of the Base of the Pillars in the Cathedral of Seville and the Church of Santiago in Jerez, Spain. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XLII-2/W3, 511-517. https://doi.org/10.5194/isprs-archives-XLII-2-W3-511-2017 es_ES
dc.description.references Murphy, M., McGovern, E., & Pavia, S. (2013). Historic Building Information Modelling - Adding intelligence to laser and image based surveys of European classical architecture. Journal of Photogrammetry and Remote Sensing, 76, 89-102. https://doi.org/10.1016/j.isprsjprs.2012.11.006 es_ES
dc.description.references Nieto, J. (2012). Generación de modelos de información para la gestión de una intervención: La cárcel de la Real Fábrica de Tabacos de Sevilla. Virtual Archaeology Review, 3(5), 63-67. https://doi.org/10.4995/var.2012.4525 es_ES
dc.description.references Nieto, J., Moyano, J., Rico, F., & Antón, D. (2013). La necesidad de un modelo de información aplicado al patrimonio arquitectónico. Actas del 1º Congreso nacional BIM - EUBIM 2013, Valencia, (pp. 21-32). Retrieved from https://idus.us.es/xmlui/handle/11441/39441 es_ES
dc.description.references Nieto, J., & Moyano, J. (2014a). El estudio paramental en el modelo de información del edificio histórico o "Proyecto HBIM". Virtual Archaeology Review, 5(11), 73-85. https://doi.org/10.4995/var.2014.4183 es_ES
dc.description.references Nieto, J., Moyano, J., & Fernández‐Valderrama, P. (2014b). Implementación de las nuevas técnicas de levantamiento en el sistema BIM (Building Information Modeling). XII Graphic Expression applied to Building International (Vol. I, pp. 327-337). Retrieved from https://idus.us.es/xmlui/handle/11441/39500 es_ES
dc.description.references Nieto, J., Moyano, J., Rico, F., & Antón, D. (2016). Management of built heritage via HBIM Project: A case study of flooring and tiling. Virtual Archaeology Review, 7(14), 1-12. https://doi.org/10.4995/var.2016.4349 es_ES
dc.description.references Oriel, E., & Clare, P. (2015). HBIM and matching techniques: considerations for late nineteenth- and early twentieth-century buildings. Journal of Architectural Conservation, 21(3), 145-159. https://doi.org/10.1080/13556207.2016.1139852 es_ES
dc.description.references Ortega, H., Moyano, J., Rico, F., Marín, D., & Fresco, R. (2014). Tectografía secuencial como sistema de representación. XII Congreso Internacional de Expresión Gráfica Aplicada a la Edificación, Madrid, 1, (pp. 272-278). Retrieved from https://dialnet.unirioja.es/servlet/articulo?codigo=6098051 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem