- -

Developing a novel based productivity model by investigating potential bounds of production plant: A case study

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

Developing a novel based productivity model by investigating potential bounds of production plant: A case study

Show full item record

Hussain, Z. (2019). Developing a novel based productivity model by investigating potential bounds of production plant: A case study. International Journal of Production Management and Engineering. 7(2):151-159. https://doi.org/10.4995/ijpme.2019.10911

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/125560

Files in this item

Item Metadata

Title: Developing a novel based productivity model by investigating potential bounds of production plant: A case study
Author: Hussain, Zahid
Issued date:
Abstract:
[EN] Productivity level is based on reliability impression which is the rudimentary aspect of automatic assembly line for continuous production. Productivity forecasting is a professional tool helping to enhance production ...[+]
Subjects: Automatic assembly lines , Availability , Productivity level , Productivity models
Copyrigths: Reconocimiento - No comercial - Sin obra derivada (by-nc-nd)
Source:
International Journal of Production Management and Engineering. (issn: 2340-5317 ) (eissn: 2340-4876 )
DOI: 10.4995/ijpme.2019.10911
Publisher:
Universitat Politècnica de València
Publisher version: https://doi.org/10.4995/ijpme.2019.10911
Type: Artículo

recommendations

 

This item appears in the following Collection(s)

Show full item record