dc.contributor.advisor | Martínez Sanz, Antonio Vicente | es_ES |
dc.contributor.author | Camarena Espinós, Didac | es_ES |
dc.coverage.spatial | east=-0.19628130000000965; north=38.9170628; name=Carrer Ferrocarril d'Alcoi, 3, 46721 Potríes, Valencia, Espanya | es_ES |
dc.date.accessioned | 2019-10-21T10:52:49Z | |
dc.date.available | 2019-10-21T10:52:49Z | |
dc.date.created | 2019-09-11 | |
dc.date.issued | 2019-10-21 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/129080 | |
dc.description.abstract | [ES] El presente Trabajo de Final de Grado tiene el objetivo de realizar un plan de mantenimiento preventivo para la empresa "PRODUCTOS CITROSOL S.A.", dedicada a la elaboración e investigación de productos para el tratamiento hortofrutícola. Anteriormente la empresa priorizaba el mantenimiento correctivo por encima del preventivo a la hora de mantener sus equipos de planta en funcionamiento. Debido a que el coste siempre es superior si se espera a llegar al final de la vida útil de los componentes, se propuso realizar una programación de mantenimiento preventivo para la fabricación de ceras y fungicidas de la planta ubicada en la población de Potries (València). Este plan de mantenimiento está centrado en la parte de fabricación de los productos que se elaboran en la empresa. Debido a que es una instalación reciente, no había un plan adecuado a las nuevas necesidades de la planta; por lo tanto, se elabora un calendario de tareas programadas para intentar conseguir que el mantenimiento a realizar sea lo menos intrusivo posible y, por lo tanto, conseguir un mejor desarrollo en la producción. Se ha estandarizado toda la documentación para facilitar los trabajos a los operarios de mantenimiento y de fabricación. Se han creado partes de trabajo, gamas de mantenimiento, históricos de reparaciones y finalmente se ha obtenido el listado de tareas con la programación temporal. También se han realizado ideas de mejora para optimizar la producción como la nueva numeración de los elementos de fabricación. También se añade valoración económica del proyecto. | es_ES |
dc.description.abstract | [EN] The present Final Degree Project has the objective of carrying out a preventive maintenance plan for the company "PRODUCTOS CITROSOL S.A.", dedicated to the elaboration and investigation of products for the horticultural treatment. Previously, the company prioritized the corrective maintenance over the preventive maintenance of its plant operation equipment. Because the cost is always higher if it is expected to reach the end of the useful life of the components, it was proposed to carry out a schedule of preventive maintenance for the manufacture of waxes and fungicides of the plant located in the town of Potries (València). This maintenance plan is focused on the manufacturing part of the products that are produced in the company. Because it is a recent installation, there was not an adequate plan for the new needs of the plant; therefore, a calendar of scheduled tasks is prepared to try to ensure that the maintenance to be carried out is as non-intrusive as possible and, therefore, achieve a better development in production. All the documents has been standardized to facilitate the work to the maintenance and manufacturing workers. Work parts, maintenance ranges, historical repairs have been created and finally the list of tasks has been obtained with the temporary programming. Ideas for improvement have also been made to optimize production as the new coding of the manufacturing elements. An economic valuation of the project is also added. | es_ES |
dc.format.extent | 176 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Mantenimiento Preventivo | es_ES |
dc.subject | Postcosecha de cítricos | es_ES |
dc.subject | Ceras | es_ES |
dc.subject | Preventive maintenance | es_ES |
dc.subject | Citrus postharvest | es_ES |
dc.subject | Waxes | es_ES |
dc.subject.classification | INGENIERIA MECANICA | es_ES |
dc.subject.other | Grado en Ingeniería Mecánica-Grau en Enginyeria Mecànica | es_ES |
dc.title | Diseño e implantación de un plan de mantenimiento preventivo en la empresa química productos Citrosol | es_ES |
dc.type | Proyecto/Trabajo fin de carrera/grado | es_ES |
dc.rights.accessRights | Cerrado | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Politécnica Superior de Alcoy - Escola Politècnica Superior d'Alcoi | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería Mecánica y de Materiales - Departament d'Enginyeria Mecànica i de Materials | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Instituto de Diseño para la Fabricación y Producción Automatizada - Institut de Disseny per a la Fabricació i Producció Automatitzada | es_ES |
dc.description.bibliographicCitation | Camarena Espinós, D. (2019). Diseño e implantación de un plan de mantenimiento preventivo en la empresa química productos Citrosol. http://hdl.handle.net/10251/129080 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\112073 | es_ES |