- -

Diseño e implantación de un plan de mantenimiento preventivo en la empresa química productos Citrosol

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Diseño e implantación de un plan de mantenimiento preventivo en la empresa química productos Citrosol

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Martínez Sanz, Antonio Vicente es_ES
dc.contributor.author Camarena Espinós, Didac es_ES
dc.coverage.spatial east=-0.19628130000000965; north=38.9170628; name=Carrer Ferrocarril d'Alcoi, 3, 46721 Potríes, Valencia, Espanya es_ES
dc.date.accessioned 2019-10-21T10:52:49Z
dc.date.available 2019-10-21T10:52:49Z
dc.date.created 2019-09-11
dc.date.issued 2019-10-21 es_ES
dc.identifier.uri http://hdl.handle.net/10251/129080
dc.description.abstract [ES] El presente Trabajo de Final de Grado tiene el objetivo de realizar un plan de mantenimiento preventivo para la empresa "PRODUCTOS CITROSOL S.A.", dedicada a la elaboración e investigación de productos para el tratamiento hortofrutícola. Anteriormente la empresa priorizaba el mantenimiento correctivo por encima del preventivo a la hora de mantener sus equipos de planta en funcionamiento. Debido a que el coste siempre es superior si se espera a llegar al final de la vida útil de los componentes, se propuso realizar una programación de mantenimiento preventivo para la fabricación de ceras y fungicidas de la planta ubicada en la población de Potries (València). Este plan de mantenimiento está centrado en la parte de fabricación de los productos que se elaboran en la empresa. Debido a que es una instalación reciente, no había un plan adecuado a las nuevas necesidades de la planta; por lo tanto, se elabora un calendario de tareas programadas para intentar conseguir que el mantenimiento a realizar sea lo menos intrusivo posible y, por lo tanto, conseguir un mejor desarrollo en la producción. Se ha estandarizado toda la documentación para facilitar los trabajos a los operarios de mantenimiento y de fabricación. Se han creado partes de trabajo, gamas de mantenimiento, históricos de reparaciones y finalmente se ha obtenido el listado de tareas con la programación temporal. También se han realizado ideas de mejora para optimizar la producción como la nueva numeración de los elementos de fabricación. También se añade valoración económica del proyecto. es_ES
dc.description.abstract [EN] The present Final Degree Project has the objective of carrying out a preventive maintenance plan for the company "PRODUCTOS CITROSOL S.A.", dedicated to the elaboration and investigation of products for the horticultural treatment. Previously, the company prioritized the corrective maintenance over the preventive maintenance of its plant operation equipment. Because the cost is always higher if it is expected to reach the end of the useful life of the components, it was proposed to carry out a schedule of preventive maintenance for the manufacture of waxes and fungicides of the plant located in the town of Potries (València). This maintenance plan is focused on the manufacturing part of the products that are produced in the company. Because it is a recent installation, there was not an adequate plan for the new needs of the plant; therefore, a calendar of scheduled tasks is prepared to try to ensure that the maintenance to be carried out is as non-intrusive as possible and, therefore, achieve a better development in production. All the documents has been standardized to facilitate the work to the maintenance and manufacturing workers. Work parts, maintenance ranges, historical repairs have been created and finally the list of tasks has been obtained with the temporary programming. Ideas for improvement have also been made to optimize production as the new coding of the manufacturing elements. An economic valuation of the project is also added. es_ES
dc.format.extent 176 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Mantenimiento Preventivo es_ES
dc.subject Postcosecha de cítricos es_ES
dc.subject Ceras es_ES
dc.subject Preventive maintenance es_ES
dc.subject Citrus postharvest es_ES
dc.subject Waxes es_ES
dc.subject.classification INGENIERIA MECANICA es_ES
dc.subject.other Grado en Ingeniería Mecánica-Grau en Enginyeria Mecànica es_ES
dc.title Diseño e implantación de un plan de mantenimiento preventivo en la empresa química productos Citrosol es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Politécnica Superior de Alcoy - Escola Politècnica Superior d'Alcoi es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería Mecánica y de Materiales - Departament d'Enginyeria Mecànica i de Materials es_ES
dc.contributor.affiliation Universitat Politècnica de València. Instituto de Diseño para la Fabricación y Producción Automatizada - Institut de Disseny per a la Fabricació i Producció Automatitzada es_ES
dc.description.bibliographicCitation Camarena Espinós, D. (2019). Diseño e implantación de un plan de mantenimiento preventivo en la empresa química productos Citrosol. http://hdl.handle.net/10251/129080 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\112073 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem