Mostrar el registro sencillo del ítem
dc.contributor.advisor | Roldán Blay, Carlos | es_ES |
dc.contributor.advisor | Roldán Porta, Carlos | es_ES |
dc.contributor.author | González Vega, Jaime | es_ES |
dc.date.accessioned | 2019-10-24T18:24:09Z | |
dc.date.available | 2019-10-24T18:24:09Z | |
dc.date.created | 2019-09-30 | |
dc.date.issued | 2019-10-24 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/129447 | |
dc.description.abstract | [ES] El presente trabajo desarrolla un análisis sobre la viabilidad técnica y económica para la implantación de un sistema generador fotovoltaico instalado sobre la cubierta de un conjunto de naves conexas pertenecientes al mismo titular situadas en la localidad de Ponferrada (León), para cubrir una superficie total de 27.200m2 . El dimensionado de la instalación se realiza a partir de los datos horarios de consumos energéticos reales de la industria. En esta, los consumos son muy elevados, por lo que es una buena oportunidad para maximizar la implantación de paneles sobre la totalidad de la superficie de las cubiertas. La intención en este trabajo es realizar un proyecto lo más cercano a la realidad, de forma que se elegirá de entre las distintas posibilidades de instalaciones, la que mejor se adecúe a las necesidades de la industria y proporcione un payback lo óptimo posible. Para ello se van a tener en cuenta datos sobre orientación de paneles, utilización de estructura coplanar o inclinada, esquemas de conexión, producción de la planta en función de las condiciones de operación (parámetro de tensión e intensidades) o equipos entre otros criterios, para dotar a la instalación de un correcto funcionamiento conectado a la red. El trabajo se acompaña de una plantilla Excel que proporciona un análisis exhaustivo de la producción de las diferentes variantes de instalación sobre cubierta, a través de los consumos horarios de la empresa en día laborables y no laborables. Proporciona datos como la cobertura que cubre la planta, ahorro económico mensual, vertido horario, compra a red en los distintos periodos, etc. A su vez, se realiza la implantación de un transformador de 2500kVA para sustituir al anterior que había instalado en la industria, de manera que sea capaz de verter toda la energía excedentaria de la instalación incluso cuando no haya consumos. Finalmente se obtienen unos resultados que muestran cómo afecta la producción de la planta a la factura eléctrica final de la industria. | es_ES |
dc.description.abstract | [EN] The present work develops an analysis on the technical and economic feasibility for the implementation of a photovoltaic generator system installed on the deck of a set of related ships belonging to the same owner located in Ponferrada (León), to cover a total area of 27,200m2. The sizing of the installation is carried out based on the hourly data of real energy consumption of the industry. In this, the consumptions are very high, so it is a good opportunity to maximize the implantation of panels over the entire surface of the roofs. The intention in this work is to carry out a project as close to reality as possible, so that it will be chosen from among the different possibilities of installations, the one that best suits the needs of the industry and provides the best possible payback. This will take into account data on panel orientation, use of coplanar or inclined structure, connection diagrams, production of the plant depending on the operating conditions (voltage and intensity parameter) or equipment among other criteria, to provide the installation with proper operation connected to the network. The work is accompanied by an Excel template that provides an exhaustive analysis of the production of the different variants of installation on deck, through the hourly consumption of the company in working days and non-working days. It provides data such as the coverage that covers the plant, monthly economic savings, time spills, network purchases in the different periods, etc. In turn, the implementation of a 2500kVA transformer is carried out to replace the previous one that had been installed in the industry, so that it is able to pour all the excess energy from the installation even when there are no consumptions. Finally, results are obtained that show how the production of the plant affects the final electricity bill of the industry. | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Infraestructura eléctrica | es_ES |
dc.subject | Centro de transformación | es_ES |
dc.subject | Generación fotovoltaica | es_ES |
dc.subject | Análisis de rentabilidad | es_ES |
dc.subject | Electrical infrastructure | es_ES |
dc.subject | Transformation center | es_ES |
dc.subject | Photovoltaic generation | es_ES |
dc.subject | Analysis of rentability | es_ES |
dc.subject.classification | INGENIERIA ELECTRICA | es_ES |
dc.subject.other | Máster Universitario en Ingeniería Industrial-Màster Universitari en Enginyeria Industrial | es_ES |
dc.title | Proyecto de instalación fotovoltaica de 3 MW en cubierta de nave industrial con instalación de enlace a red en Ponferrada (León) | es_ES |
dc.type | Tesis de máster | es_ES |
dc.rights.accessRights | Cerrado | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería Eléctrica - Departament d'Enginyeria Elèctrica | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials | es_ES |
dc.description.bibliographicCitation | González Vega, J. (2019). Proyecto de instalación fotovoltaica de 3 MW en cubierta de nave industrial con instalación de enlace a red en Ponferrada (León). http://hdl.handle.net/10251/129447 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\111622 | es_ES |