Resolución de un problema real de asignación de personal a proyectos de auditoría

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Resolución de un problema real de asignación de personal a proyectos de auditoría

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Villa Juliá, María Fulgencia es_ES
dc.contributor.advisor Vallada Regalado, Eva es_ES
dc.contributor.author Teodoro Lima, Rodrigo es_ES
dc.date.accessioned 2019-10-25T09:50:01Z
dc.date.available 2019-10-25T09:50:01Z
dc.date.created 2019-09-23
dc.date.issued 2019-10-25 es_ES
dc.identifier.uri http://hdl.handle.net/10251/129497
dc.description.abstract [ES] En este trabajo se aplican métodos de programación de la producción para modelizar y resolver un problema real de asignación y secuenciación de proyectos de auditoría al que se hace frente en el órgano de control interno del gobierno federal brasileño. En este problema, un gestor debe determinar, a partir de un conjunto predefinido de proyectos (obligatorios y optativos), el calendario laboral anual de cada uno de los auditores de su equipo, teniendo por objetivo maximizar la suma de beneficios asociados a la realización de los proyectos de naturaleza optativa. Los proyectos poseen restricciones de release times y deadlines, mientras los auditores presentan restricciones de indisponibilidades deterministas. Se propone un modelo de programación entera mixta (MIP) para la comprensión matemática del problema y también para intentar resolverlo óptimamente, pero no se encuentran soluciones óptimas exactas en un tiempo de computación razonable para los propósitos de la investigación. Solamente para las instancias pequeñas y medianas (hasta 10 auditores y 110 proyectos) aleatoriamente generadas para el problema se consigue obtener buenas soluciones factibles. Para las instancias de tamaño más grande, el modelo matemático solo es capaz de encontrar una cota superior relativa a la relajación lineal del problema. De este modo, se desarrollan dos algoritmos heurísticos constructivos con el lenguaje de programación Julia, los cuales logran encontrar, en un tiempo computacional muy pequeño, soluciones de alta calidad para el conjunto total de instancias probadas. Se hace una modificación en el segundo heurístico con el objetivo de incrementar su rendimiento y, al final, mediante un análisis de variancia (ANOVA), se verifica si las medias de los valores de las soluciones encontradas por cada uno de los heurísticos presentan diferencias estadísticamente significativas. es_ES
dc.description.abstract [EN] In this work, production scheduling methods are applied to model and solve a real problem of audit projects assignment and scheduling, which is faced in the internal control body of the Brazilian federal government. In this problem, a manager must determine, from a predefined set of projects (required and optional ones), the annual work calendar of each auditor of his team, with the objective of maximizing the sum of benefits associated with the execution of the optional projects. There are restrictions of release times and deadlines concerning the projects, while auditors have restrictions related to deterministic unavailabilities. A mixed integer linear programming model (MIP) is proposed for the mathematical understanding of the problem and still for trying to solve it optimally, but no exact optimal solutions are found in a reasonable computational time for the purposes of the investigation. Only for small and medium-sized instances (up to 10 auditors and 110 projects) randomly generated for the problem, good feasible solutions can be obtained. For larger instances, the mathematical model is only able to find a best bound related to the linear relaxation of the problem. Then, two constructive heuristic algorithms are developed with Julia programming language, which succeed to find, in a very small computational time, high quality solutions for all randomly generated instances of the problem. A modification is introduced in the second heuristic with the aim of increase its performance and, finally, through a variance analysis (ANOVA), it is verified if the means of the solutions found by each heuristic differ amongst themselves in a statistically significant way. es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) es_ES
dc.subject Asignación y secuenciación de proyectos de auditoría es_ES
dc.subject Modelizado matemático de problemas reales es_ES
dc.subject Programación entera mixta es_ES
dc.subject Algoritmos heurísticos constructivos es_ES
dc.subject Lenguaje de programación Julia es_ES
dc.subject Audit projects assignment and scheduling es_ES
dc.subject Real problems mathematical modelling es_ES
dc.subject Mixed integer programming es_ES
dc.subject Constructive heuristic algorithms es_ES
dc.subject Julia programming language es_ES
dc.subject.classification ESTADISTICA E INVESTIGACION OPERATIVA es_ES
dc.subject.other Máster Universitario en Ingeniería de Análisis de Datos, Mejora de Procesos y Toma de Decisiones-Màster Universitari en Enginyeria D'Anàlisi de Dades, Millora de Processos i Presa de Decisions es_ES
dc.title Resolución de un problema real de asignación de personal a proyectos de auditoría es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Estadística e Investigación Operativa Aplicadas y Calidad - Departament d'Estadística i Investigació Operativa Aplicades i Qualitat es_ES
dc.description.bibliographicCitation Teodoro Lima, R. (2019). Resolución de un problema real de asignación de personal a proyectos de auditoría. http://hdl.handle.net/10251/129497 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\91453 es_ES