- -

BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects

Mostrar el registro completo del ítem

Rojas, MJ.; Herrera, RF.; Mourgues, C.; Ponz-Tienda, JL.; Alarcón, LF.; Pellicer, E. (2019). BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects. Advances in Civil Engineering. 2019:1-9. https://doi.org/10.1155/2019/9094254

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/145424

Ficheros en el ítem

Metadatos del ítem

Título: BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects
Autor: Rojas, María José Herrera, Rodrigo F. Mourgues, Claudio Ponz-Tienda, José Luis Alarcón, Luis F. Pellicer, Eugenio
Entidad UPV: Universitat Politècnica de València. Departamento de Construcciones Arquitectónicas - Departament de Construccions Arquitectòniques
Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil
Fecha difusión:
Resumen:
[EN] The evaluation of BIM capabilities and repeatability enables a company or project to identify its current status and how to improve continuously; this evaluation can be performed with BIM maturity models. However, ...[+]
Derechos de uso: Reconocimiento (by)
Fuente:
Advances in Civil Engineering. (issn: 1687-8086 )
DOI: 10.1155/2019/9094254
Editorial:
Hindawi Limited
Versión del editor: https://doi.org/10.1155/2019/9094254
Código del Proyecto:
info:eu-repo/grantAgreement/CONICYT//2018-21180884/
info:eu-repo/grantAgreement/FONDECYT//1181648/
Agradecimientos:
This work was supported by FONDECYT (1181648 to Alarcón L. F. and Mourgues C.) and CONICYT, Chile (PCHA/National Doctorate/2018-21180884 to Herrera R. F.).
Tipo: Artículo

References

Azhar, S. (2011). Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry. Leadership and Management in Engineering, 11(3), 241-252. doi:10.1061/(asce)lm.1943-5630.0000127

Succar, B., Sher, W., & Williams, A. (2012). Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2), 120-142. doi:10.1080/17452007.2012.659506

Sydow, J., & Braun, T. (2018). Projects as temporary organizations: An agenda for further theorizing the interorganizational dimension. International Journal of Project Management, 36(1), 4-11. doi:10.1016/j.ijproman.2017.04.012

McHugh, M. L. (2012). Interrater reliability: the kappa statistic. Biochemia Medica, 276-282. doi:10.11613/bm.2012.031

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem