- -

Implantación de sistema GMAO para planta de fabricación ITC Packaging

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Implantación de sistema GMAO para planta de fabricación ITC Packaging

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Hilario Caballero, Adolfo es_ES
dc.contributor.author Vidal Lillo, Rafael es_ES
dc.coverage.spatial east=-0.5919957160949707; north=38.61560464485824; name=Calle Sevilla, 38, 03440 Ibi, Alicante, Espanya es_ES
dc.coverage.spatial east=-0.5929516; north=38.61630279999999; name=Av. Juguete, 1, 03440 Ibi, Alicante, Espanya es_ES
dc.coverage.spatial east=-0.5850587; north=38.61449229999999; name=Calle Valladolid, 12, 03440 Ibi, Alicante, Espanya es_ES
dc.date.accessioned 2020-07-13T14:59:36Z
dc.date.available 2020-07-13T14:59:36Z
dc.date.created 2020-06-22
dc.date.issued 2020-07-13 es_ES
dc.identifier.uri http://hdl.handle.net/10251/147885
dc.description.abstract [ES] Se realizará la implantación de un sistema GMAO, (Gestión del Mantenimiento Asistido por Ordenador) en una planta de fabricación de inyección de plástico. Esta, está constituida de 28 máquinas inyectoras de plástico, robots, sistemas auxiliares del tipo compresores, climatizadoras, maquinas enfriadoras del circuito del agua de refrigeración, etc. Para ello, se utilizará el software escogido por la empresa PGMwin , el cual no solo se limita a la planificación del mantenimiento de los activos de la empresa, también está diseñado, entre otras funciones, para gestionar los almacenes de recambios de una empresa, la gestión de compras de los mismos, recepción de albaranes y facturas, y un asistente documental para gestionar toda la documentación tanto legal, como de productos químicos, PRL, etc. Se mostrarán todas las fases de la implantación de este sistema en una empresa del calibre de ITC Packaging, desde la formación a los técnicos, a la definición de todas las pautas preventivas, recopilación de información del parque de maquinaria de la empresa, etc. Ademas de las mejoras realizadas por el equipo de implantación del software PGMwin para adaptar el programa a la dinámica de trabajo de ITC Packaging. es_ES
dc.description.abstract [EN] This Project will explain the implantation of a CMMS system (Computer Aided Maintenance Management) on a plastic injection manufacturing plant. This factory contains 28 plastic injection machines, robots, auxiliary systems such as air compressors, air conditioning or cooling machines of the cooling water circuit. For this purpose, the software chosen by the company is ¿PGMwin¿, which is not only limited to elaborating a maintenance plan of the company assets, but is also designed, among other functions, to manage the spare part warehouses of a company, the management of their purchases, the receipt of delivery notes and invoices, and a record keeper assistant to manage all the documentation, either legal or related to chemical products or health and safety. Each phase of the implementation of this system in a company of the size of ITC Packaging will be revealed, from training to technicians to the definition of every maintenance task, including the compilation of all the information from the company's machinery fleet, as well as the improvements achieved by the PGMwin software implementation team, aimed to adapt the software to ITC Packaging's work dynamic. es_ES
dc.format.extent 84 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Implantación es_ES
dc.subject GMAO es_ES
dc.subject Mantenimiento es_ES
dc.subject Activos es_ES
dc.subject PGMwin es_ES
dc.subject Almacén es_ES
dc.subject Repuestos es_ES
dc.subject Compras es_ES
dc.subject Implantation es_ES
dc.subject CMMS es_ES
dc.subject Maintenance es_ES
dc.subject Assets es_ES
dc.subject Spare Parts Warehouse es_ES
dc.subject Purchases. es_ES
dc.subject.classification INGENIERIA DE SISTEMAS Y AUTOMATICA es_ES
dc.subject.other Grado en Ingeniería Eléctrica-Grau en Enginyeria Elèctrica es_ES
dc.title Implantación de sistema GMAO para planta de fabricación ITC Packaging es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Instituto Universitario de Automática e Informática Industrial - Institut Universitari d'Automàtica i Informàtica Industrial es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Politécnica Superior de Alcoy - Escola Politècnica Superior d'Alcoi es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería de Sistemas y Automática - Departament d'Enginyeria de Sistemes i Automàtica es_ES
dc.description.bibliographicCitation Vidal Lillo, R. (2020). Implantación de sistema GMAO para planta de fabricación ITC Packaging. http://hdl.handle.net/10251/147885 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\126577 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem