- -

A mixed-integer programming model for cycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

A mixed-integer programming model for cycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Cavdur, F. es_ES
dc.contributor.author Kaymaz, E. es_ES
dc.date.accessioned 2020-07-23T09:38:55Z
dc.date.available 2020-07-23T09:38:55Z
dc.date.issued 2020-07-18
dc.identifier.uri http://hdl.handle.net/10251/148538
dc.description.abstract [EN] In assembly lines, rework stations are generally used for reprocessing defective items. On the other hand, using rework stations for this purpose only might cause inefficient usage of the resources in this station especially in an assembly line with a low defective rate. In this study, a mixed-integer programming model for cycle time minimization is proposed by considering the use of rework stations for performing parallel tasks. By linearizing the non-linear constraint about parallel tasks using a variate transformation, the model is transformed to a linear-mixed-integer form. In addition to different defective rates, different rework station positions are also considered using the proposed model. The performance of the model is analyzed on several test problems from the related literature. es_ES
dc.language Inglés es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.relation.ispartof International Journal of Production Management and Engineering es_ES
dc.rights Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) es_ES
dc.subject Assembly line balancing es_ES
dc.subject Cycle time minimization es_ES
dc.subject Rework station es_ES
dc.subject Parallel tasks es_ES
dc.subject Mixed-integer programming es_ES
dc.title A mixed-integer programming model for cycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.4995/ijpme.2020.12368
dc.rights.accessRights Abierto es_ES
dc.description.bibliographicCitation Cavdur, F.; Kaymaz, E. (2020). A mixed-integer programming model for cycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks. International Journal of Production Management and Engineering. 8(2):111-121. https://doi.org/10.4995/ijpme.2020.12368 es_ES
dc.description.accrualMethod OJS es_ES
dc.relation.publisherversion https://doi.org/10.4995/ijpme.2020.12368 es_ES
dc.description.upvformatpinicio 111 es_ES
dc.description.upvformatpfin 121 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 8 es_ES
dc.description.issue 2 es_ES
dc.identifier.eissn 2340-4876
dc.relation.pasarela OJS\12368 es_ES
dc.description.references Altekin, F. T., Bayindir, Z. P., & Gümüskaya, V. (2016). Remedial actions for disassembly lines with stochastic task times. Computers & Industrial Engineering, 99, 78-96. https://doi.org/10.1016/j.cie.2016.06.027 es_ES
dc.description.references Anderson, E. J., & Ferris, M. C. (1994). Genetic algorithms for combinatorial optimization: the assemble line balancing problem. ORSA Journal on Computing, 6(2), 161-173. https://doi.org/10.1287/ijoc.6.2.161 es_ES
dc.description.references Askin, R. G., & Zhou, M. (1997). A parallel station heuristic for the mixed-model production line balancing problem. International Journal of Production Research, 35(11), 3095-3106. https://doi.org/ 10.1080/002075497194309 es_ES
dc.description.references Bard, J. F. (1989). Assembly line balancing with parallel workstations and dead time. The International Journal of Production Research, 27(6), 1005-1018. https://doi.org/10.1080/00207548908942604 es_ES
dc.description.references Bartholdi, J. J. (1993). Balancing two-sided assembly lines: a case study. International Journal of Production Research, 31(10), 2447-2461. https://doi.org/10.1080/00207549308956868 es_ES
dc.description.references Battaia, O., & Dolgui, A. (2013). A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics, 142(2), 259-277. https://doi.org/10.1016/j.ijpe.2012.10.020 es_ES
dc.description.references Baybars, I. (1986). A survey of exact algorithms for the simple assembly line balancing problem. Management science, 32(8), 909-932. https://doi.org/10.1287/mnsc.32.8.909 es_ES
dc.description.references Baykasoglu, A., & Demirkol Akyol, S. (2014). Ergonomic assembly line balancing. Journal of the Faculty of Engineering and Architecture of Gazi University, 29(4), 785-792. https://doi.org/10.17341/gummfd.00296 es_ES
dc.description.references Becker, C., & Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European journal of operational research, 168(3), 694-715. https://doi.org/10.1016/j.ejor.2004.07.023 es_ES
dc.description.references Boysen, N., Fliedner, M., & Scholl, A. (2007). A classification of assembly line balancing problems. European journal of operational research, 183(2), 674-693. https://doi.org/10.1016/j.ejor.2006.10.010 es_ES
dc.description.references Bryton, B. (1954). Balancing of a continuous production line. Master's Thesis, Northwestern University, Evanston. es_ES
dc.description.references Cercioglu, H., Ozcan, U., Gokcen, H., & Toklu, B. (2009). A simulated annealing approach for parallel assembly line balancing problem. Journal of the Faculty of Engineering and Architecture of Gazi University, 24(2), 331-341. es_ES
dc.description.references Efe, B., Kremer, G. E. O., & Kurt, M. (2018). Age and gender-based workload constraint for assembly line worker assignment and balancing problem in a textile firm. International Journal of Industrial Engineering, 25(1), 1-17. es_ES
dc.description.references Ghosh, S., & Gagnon, R. J. (1989). A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. The International Journal of Production Research, 27(4), 637-670. https://doi.org/10.1080/00207548908942574 es_ES
dc.description.references Gokcen, H., & Baykoc, Ö. F. (1999). A new line remedial policy for the paced lines with stochastic task times. International Journal of Production Economics, 58(2), 191-197. https://doi.org/10.1016/S0925-5273(98)00123-6 es_ES
dc.description.references Gokcen, H., Agpak, K., & Benzer, R. (2006). Balancing of parallel assembly lines. International Journal of Production Economics, 103(2), 600-609. https://doi.org/10.1016/j.ijpe.2005.12.001 es_ES
dc.description.references Guner, B., & Hasgul, S. (2012). U-Type assembly line balancing with ergonomic factors for balance stability. Journal of the Faculty of Engineering and Architecture of Gazi University, 27(2), 407-415. es_ES
dc.description.references Kaplan, O. (2004). Assembly line balancing with task paralleling. Master's Thesis, METU, Ankara. es_ES
dc.description.references Kara, Y., Ozguven, C., Yalcın, N., & Atasagun, Y. (2011). Balancing straight and U-shaped assembly lines with resource dependent task times. International Journal of Production Research, 49(21), 6387-6405. https://doi.org/10.1080/00207543.2010.535039 es_ES
dc.description.references Kara, Y., Atasagun, Y., Gokcen, H., Hezer, S., & Demirel, N. (2014). An integrated model to incorporate ergonomics and resource restrictions into assembly line balancing. International Journal of Computer Integrated Manufacturing, 27(11), 997-1007. https://doi.org/10.1080/0951192X.2013.874575 es_ES
dc.description.references Kazemi, S. M., Ghodsi, R., Rabbani, M., & Tavakkoli-Moghaddam, R. (2011). A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks. The International Journal of Advanced Manufacturing Technology, 55(9-12), 1111-1122. https://doi.org/10.1007/s00170-010-3120-6 es_ES
dc.description.references Kim, Y. K., Kim, Y., & Kim, Y. J. (2000). Two-sided assembly line balancing: a genetic algorithm approach. Production Planning & Control, 11(1), 44-53. https://doi.org/10.1080/095372800232478 es_ES
dc.description.references Kottas, J. F., & Lau, H. S. (1976). A total operating cost model for paced lines with stochastic task times. AIIE Transactions, 8(2), 234-240. https://doi.org/10.1080/05695557608975072 es_ES
dc.description.references Lau, H. S., & Shtub, A. (1987). An exploratory study on stopping a paced line when incompletions occur. IIE transactions, 19(4), 463-467. https://doi.org/10.1080/07408178708975421 es_ES
dc.description.references Lee, T. O., Kim, Y., & Kim, Y. K. (2001). Two-sided assembly line balancing to maximize work relatedness and slackness. Computers & Industrial Engineering, 40(3), 273-292. https://doi.org/10.1016/S0360-8352(01)00029-8 es_ES
dc.description.references Mutlu, O., & Ozgormus, E. (2012). A fuzzy assembly line balancing problem with physical workload constraints. International Journal of Production Research, 50(18), 5281-5291. https://doi.org/10.1080/00207543.2012.709647 es_ES
dc.description.references Ozcan, U., & Toklu, B. (2010). Balancing two-sided assembly lines with sequence-dependent setup times. International Journal of Production Research, 48(18), 5363-5383. https://doi.org/10.1080/00207540903140750 es_ES
dc.description.references Pinto, P., Dannenbring, D. G., & Khumawala, B. M. (1975). A branch and bound algorithm for assembly line balancing with paralleling. The International Journal of Production Research, 13(2), 183-196. https://doi.org/10.1080/00207547508942985 es_ES
dc.description.references Sabuncuoglu, I., Erel, E., & Alp, A. (2009). Ant colony optimization for the single model U-type assembly line balancing problem. International Journal of Production Economics, 120(2), 287-300. https://doi.org/10.1016/j.ijpe.2008.11.017 es_ES
dc.description.references Salveson, M. E. (1955). The assembly line balancing problem. The Journal of Industrial Engineering, 18-25. es_ES
dc.description.references Scholl, A., & Becker, C. (2006). State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, 168(3), 666-693. https://doi.org/10.1016/j.ejor.2004.07.022 es_ES
dc.description.references Shtub, A. (1984). The effect of incompletion cost on line balancing with multiple manning of work stations. The International Journal of Production Research, 22(2), 235-245. https://doi.org/10.1080/00207548408942450 es_ES
dc.description.references Silverman, F. N., & Carter, J. C. (1986). A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Science, 32(4), 455-463. https://doi.org/10.1287/mnsc.32.4.455 es_ES
dc.description.references Simaria, A. S., & Vilarinho, P. M. (2001). The simple assembly line balancing problem with parallel workstations-a simulated annealing approach. Int J Ind Eng-Theory, 8(3), 230-240. es_ES
dc.description.references Sivasankaran, P., & Shahabudeen, P. (2014). Literature review of assembly line balancing problems. The International Journal of Advanced Manufacturing Technology, 73(9-12), 1665-1694. https://doi.org/10.1007/s00170-014-5944-y es_ES
dc.description.references Suer, G. A. (1998). Designing parallel assembly lines. Computers & industrial engineering, 35(3-4), 467-470. https://doi.org/10.1016/S0360-8352(98)00135-1 es_ES
dc.description.references Suwannarongsri, S., & Puangdownreong, D. (2008). Optimal assembly line balancing using tabu search with partial random permutation technique. International Journal of Management Science and Engineering Management, 3(1), 3-18. https://doi.org/10.1080/17509653.2008.10671032 es_ES
dc.description.references Tiacci, L., Saetta, S., & Martini, A. (2006). Balancing mixed-model assembly lines with parallel workstations through a genetic algorithm approach. International Journal of Industrial Engineering, 13(4), 402. es_ES
dc.description.references Ugurdag, H. F., Rachamadugu, R., & Papachristou, C. A. (1997). Designing paced assembly lines with fixed number of stations. European Journal of Operational Research, 102(3), 488-501. https://doi.org/10.1016/S0377-2217(96)00248-2 es_ES
dc.description.references Wei, N. C., & Chao, I. M. (2011). A solution procedure for type E simple assembly line balancing problem. Computers & Industrial Engineering, 61(3), 824-830. https://doi.org/10.1016/j.cie.2011.05.015 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem