- -

Analysis of maintenance optimization in a hydroelectric power plant

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Analysis of maintenance optimization in a hydroelectric power plant

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Martinez Monseco, Francisco Javier es_ES
dc.date.accessioned 2020-07-24T09:33:01Z
dc.date.available 2020-07-24T09:33:01Z
dc.date.issued 2020-07-21
dc.identifier.uri http://hdl.handle.net/10251/148630
dc.description.abstract [EN] This article presents a guide to designing a maintenance plan for any industrial system. As an example, it develops a maintenance plan for highly reliable equipment, such as a hydroelectric power plant, where instant availability and reliability are crucial in its operation. The development of the proposal serves as a basis for the transversal development of any industrial system that has the same operational objectives (manufacturing lines), transport (trains, aircraft) and also involves safety and environmental aspects in its proper functioning. Today’s society requires that there are more and more industrial processes in which the maximum availability of the systems must be guaranteed, and at the same time there must be a minimum number of incidents that prevent the unavailability of the process. The methodology used has consisted firstly of dividing the complex industrial system into systems to be analysed on the basis of the functions they have to perform, then on the basis of the fault history a list of potential faults to be analysed has been determined, taking into account the risk of the system itself. From here, the systems of the hydroelectric plant have been classified to determine the priorities of actions. The different maintenance techniques to be applied have been carefully considered, focusing on the need to analyse condition-based maintenance techniques, such as predictive techniques, which allow us to define the point of potential failure based on parameters, and thus be able to plan maintenance actions in a justified manner. In the specific case of a hydroelectric generation plant, the fundamental objective is based on the commitment tooperate in the electricity market (high reliability and immediate availability), and the performance of maintenance actions imply in most cases the shutdown of the plant and therefore the loss of income from electricity production. Finally, a design of a justified maintenance plan for a hydroelectric power plant has been proposed based on the methodology explained. es_ES
dc.language Inglés es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.relation.ispartof Journal of Applied Research in Technology & Engineering es_ES
dc.rights Reconocimiento - No comercial - Compartir igual (by-nc-sa) es_ES
dc.subject Maintenance es_ES
dc.subject Reliability es_ES
dc.subject Power plants es_ES
dc.subject Industrial processes es_ES
dc.title Analysis of maintenance optimization in a hydroelectric power plant es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.4995/jarte.2020.13738
dc.rights.accessRights Abierto es_ES
dc.description.bibliographicCitation Martinez Monseco, FJ. (2020). Analysis of maintenance optimization in a hydroelectric power plant. Journal of Applied Research in Technology & Engineering. 1(1):23-29. https://doi.org/10.4995/jarte.2020.13738 es_ES
dc.description.accrualMethod OJS es_ES
dc.relation.publisherversion https://doi.org/10.4995/jarte.2020.13738 es_ES
dc.description.upvformatpinicio 23 es_ES
dc.description.upvformatpfin 29 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 1 es_ES
dc.description.issue 1 es_ES
dc.identifier.eissn 2695-8821
dc.relation.pasarela OJS\13738 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem