Mostrar el registro completo del ítem
Zhu, X.; Ruiz García, R.; Li, S.; Li, X. (2017). An effective heuristic for project scheduling with resource availability cost. European Journal of Operational Research. 257(3):746-762. https://doi.org/10.1016/j.ejor.2016.08.049
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/149538
Título: | An effective heuristic for project scheduling with resource availability cost | |
Autor: | Li, Shiyu Li, Xiaoping | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] The resource constrained project scheduling problem (RCPSP) is widely studied in the literature and has a host of applications in practice. As a variant of the RCPSP, the resource availability cost problem (RACP), ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | https://doi.org/10.1016/j.ejor.2016.08.049 | |
Código del Proyecto: |
|
|
Agradecimientos: |
This work is supported by the National Natural Science Foundation of China (Nos. 61572127, 61272377), the Key Research & Development program in Jiangsu Province (No. BE2015728) and the Collaborative Innovation Center of ...[+]
|
|
Tipo: |
|