Aissaoui, N., Haouari, M., & Hassini, E. (2007). Supplier selection and order lot sizing modeling: A review. Computers & Operations Research, 34(12), 3516-3540. doi:10.1016/j.cor.2006.01.016
Akkerman, R., & van Donk, D. P. (2009). Product mix variability with correlated demand in two-stage food manufacturing with intermediate storage. International Journal of Production Economics, 121(2), 313-322. doi:10.1016/j.ijpe.2006.11.021
Arunapuram, S., Mathur, K., & Solow, D. (2003). Vehicle Routing and Scheduling with Full Truckloads. Transportation Science, 37(2), 170-182. doi:10.1287/trsc.37.2.170.15248
[+]
Aissaoui, N., Haouari, M., & Hassini, E. (2007). Supplier selection and order lot sizing modeling: A review. Computers & Operations Research, 34(12), 3516-3540. doi:10.1016/j.cor.2006.01.016
Akkerman, R., & van Donk, D. P. (2009). Product mix variability with correlated demand in two-stage food manufacturing with intermediate storage. International Journal of Production Economics, 121(2), 313-322. doi:10.1016/j.ijpe.2006.11.021
Arunapuram, S., Mathur, K., & Solow, D. (2003). Vehicle Routing and Scheduling with Full Truckloads. Transportation Science, 37(2), 170-182. doi:10.1287/trsc.37.2.170.15248
Balakrishnan, A., & Geunes, J. (2000). Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning. Manufacturing & Service Operations Management, 2(2), 166-185. doi:10.1287/msom.2.2.166.12349
Bilgen, B.; Günther, H. O. (2009). Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application. OR Spectrum.
Calderon-Lama, J. L.; Garcia-Sabater, J. P.; Lario, F. C. (2009). Modelo para la planificación de Operaciones en Cadenas de Suministro de Productos de Innovación. DYNA Ingeniería e Industria, Vol. 84, nº. 6, pp. 517-526.
Caner Taşkın, Z., & Tamer Ünal, A. (2009). Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products. European Journal of Operational Research, 199(1), 252-261. doi:10.1016/j.ejor.2008.11.024
Carrillo, J. E., & Franza, R. M. (2006). Investing in product development and production capabilities: The crucial linkage between time-to-market and ramp-up time. European Journal of Operational Research, 171(2), 536-556. doi:10.1016/j.ejor.2004.08.040
Carvalho, J., Moreira, N., & Pires, L. (2005). Autonomous Production Systems in virtual enterprises. International Journal of Computer Integrated Manufacturing, 18(5), 357-366. doi:10.1080/09511920500081445
Clement, J.; Coldrick, A.; Sari, J. (1995). Manufacturing data structures: building foundations for excellence with bills of materials and process information. Wiley.
Crama, Y., Pochet, Y., & Wera, R. (2001). Production planning aproaches in the process industry. UCL, Belgium.
David, F., Pierreval, H., & Caux, C. (2006). Advanced planning and scheduling systems in aluminium conversion industry. International Journal of Computer Integrated Manufacturing, 19(7), 705-715. doi:10.1080/09511920500504545
De Kok, T. G., & Fransoo, J. C. (2003). Planning Supply Chain Operations: Definition and Comparison of Planning Concepts. Handbooks in Operations Research and Management Science, 597-675. doi:10.1016/s0927-0507(03)11012-2
Deuermeyer, B. L., & Pierskalla, W. P. (1978). A By-Product Production System with an Alternative. Management Science, 24(13), 1373-1383. doi:10.1287/mnsc.24.13.1373
Escudero, L. F. (1994). CMIT, capacitated multi-level implosion tool. European Journal of Operational Research, 76(3), 511-528. doi:10.1016/0377-2217(94)90284-4
Garcia-Sabater, J. P., Maheut, J., & Garcia-Sabater, J. J. (2009a). A Capacited Material Requierements Planning Model considering Delivery Constraints, in 3rd International Conference on Industrial Engineering and Industrial Management, pp. 793-803.
Garcia-Sabater, J. P., Maheut, J., & Garcia-Sabater, J. J. (2009b). A Capacited Material Requierements Planning Model considering Delivery Constraints: A Case Study from the Automotive Industry, in 39th International Conference on Computers & Industrial Engineering, pp. 378-383.
Geunes, J. (2003). Solving large-scale requirements planning problems with component substitution options. Computers & Industrial Engineering, 44(3), 475-491. doi:10.1016/s0360-8352(02)00232-2
Gronalt, M., Hartl, R. F., & Reimann, M. (2003). New savings based algorithms for time constrained pickup and delivery of full truckloads. European Journal of Operational Research, 151(3), 520-535. doi:10.1016/s0377-2217(02)00650-1
GUPTA, S. M., & TALEB, K. N. (1994). Scheduling disassembly. International Journal of Production Research, 32(8), 1857-1866. doi:10.1080/00207549408957046
Hachicha, W., Masmoudi, F., & Haddar, M. (2008). A Taguchi method application for the part routing selection in generalised group technology. International Journal of Materials and Structural Integrity, 2(4), 396. doi:10.1504/ijmsi.2008.022999
Hachicha, W., Masmoudi, F., & Haddar, M. (2009). Plans d’expérience et analyse des corrélations pour la résolution du problème de formation de cellules avec gammes alternatives. Mécanique & Industries, 10(5), 337-350. doi:10.1051/meca/2009068
Inderfurth, K., & Langella, I. M. (2005). Heuristics for solving disassemble-to-order problems with stochastic yields. OR Spectrum, 28(1), 73-99. doi:10.1007/s00291-005-0007-2
Lang, J. C., & Domschke, W. (2008). Efficient reformulations for dynamic lot-sizing problems with product substitution. OR Spectrum, 32(2), 263-291. doi:10.1007/s00291-008-0148-1
Lin, J. T., Chen, T.-L., & Lin, Y.-T. (2009). Critical material planning for TFT-LCD production industry. International Journal of Production Economics, 122(2), 639-655. doi:10.1016/j.ijpe.2009.05.027
Lyon, P., Milne, R. J., Orzell, R., & Rice, R. (2001). Matching Assets with Demand in Supply-Chain Management at IBM Microelectronics. Interfaces, 31(1), 108-124. doi:10.1287/inte.31.1.108.9693
Matta, A., Tomasella, M., & Valente, A. (2007). Impact of ramp-up on the optimal capacity-related reconfiguration policy. International Journal of Flexible Manufacturing Systems, 19(3), 173-194. doi:10.1007/s10696-007-9023-7
Nilsson, C., & Nordahl, H. (1995). Making manufacturing flexibility operational – part 1: a framework. Integrated Manufacturing Systems, 6(1), 5-11. doi:10.1108/09576069510076108
Öner, S., & Bilgiç, T. (2008). Economic lot scheduling with uncontrolled co-production. European Journal of Operational Research, 188(3), 793-810. doi:10.1016/j.ejor.2007.05.016
Pantelides, C. C. (1994). Unified Frameworks for the Optimal Process Planning and Scheduling, in 2nd Conference on the Foundations of Computer Aided Operations, Cache Publications, pp. 253-274.
Persona, A., Battini, D., Manzini, R., & Pareschi, A. (2007). Optimal safety stock levels of subassemblies and manufacturing components. International Journal of Production Economics, 110(1-2), 147-159. doi:10.1016/j.ijpe.2007.02.020
Pires, L. C. M., Carvalho, J. D. A., & Moreira, N. A. (2008). The role of Bill of Materials and Movements (BOMM) in the virtual enterprises environment. International Journal of Production Research, 46(4), 1163-1185. doi:10.1080/00207540600943951
Ram, B., Naghshineh-Pour, M. R., & Yu†, X. (2006). Material requirements planning with flexible bills-of-material. International Journal of Production Research, 44(2), 399-415. doi:10.1080/00207540500251505
Sabri, E. H., & Beamon, B. M. (2000). A multi-objective approach to simultaneous strategic and operational planning in supply chain design. Omega, 28(5), 581-598. doi:10.1016/s0305-0483(99)00080-8
Schütz, P., Tomasgard, A., & Ahmed, S. (2009). Supply chain design under uncertainty using sample average approximation and dual decomposition. European Journal of Operational Research, 199(2), 409-419. doi:10.1016/j.ejor.2008.11.040
Segerstedt, A. (1996). A capacity-constrained multi-level inventory and production control problem. International Journal of Production Economics, 45(1-3), 449-461. doi:10.1016/0925-5273(96)00017-5
Soman, C. A., van Donk, D. P., & Gaalman, G. J. C. (2007). Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study. International Journal of Production Economics, 108(1-2), 191-199. doi:10.1016/j.ijpe.2006.12.042
Sousa, R., Shah, N., & Papageorgiou, L. G. (2008). Supply chain design and multilevel planning—An industrial case. Computers & Chemical Engineering, 32(11), 2643-2663. doi:10.1016/j.compchemeng.2007.09.005
Spengler, T., Püchert, H., Penkuhn, T., & Rentz, O. (1997). Environmental integrated production and recycling management. European Journal of Operational Research, 97(2), 308-326. doi:10.1016/s0377-2217(96)00200-7
Stadtler, H. (2005). Supply chain management and advanced planning––basics, overview and challenges. European Journal of Operational Research, 163(3), 575-588. doi:10.1016/j.ejor.2004.03.001
Stadtler, H., & Kilger, C. (Eds.). (2002). Supply Chain Management and Advanced Planning. doi:10.1007/978-3-662-10142-1
Tagaras, G. (1999). Pooling in multi-location periodic inventory distribution systems. Omega, 27(1), 39-59. doi:10.1016/s0305-0483(98)00030-9
Vidal-Carreras, P. I., & Garcia-Sabater, J. P. (2009). Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction. Journal of Industrial Engineering and Management, 2(3). doi:10.3926/jiem.2009.v2n3.p437-463
Weidema, B. P. (1999). System expansions to handle co-products of renewable materials, pp. 45-48.
Wilson, S., & Platts, K. (2010). How do companies achieve mix flexibility? International Journal of Operations & Production Management, 30(9), 978-1003. doi:10.1108/01443571011075074
[-]