Mostrar el registro sencillo del ítem
dc.contributor.author | Esteso, Ana | es_ES |
dc.contributor.author | Mula, Josefa | es_ES |
dc.contributor.author | Campuzano-Bolarín, Francisco | es_ES |
dc.contributor.author | Alemany Díaz, María Del Mar | es_ES |
dc.contributor.author | Ortiz Bas, Ángel | es_ES |
dc.date.accessioned | 2020-11-17T04:32:07Z | |
dc.date.available | 2020-11-17T04:32:07Z | |
dc.date.issued | 2019-03-04 | es_ES |
dc.identifier.issn | 0020-7543 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/155118 | |
dc.description.abstract | [EN] This article aims to deal with the reallocating supply problem in both its real and planned contexts, to orders that result from the order promising process under shortage. To this end, we propose a system dynamics-based simulation model to facilitate modelling for order managers, and to provide a graphic support tool to understand the process and to make decisions. The basis of the simulation model's structure is a mixed-integer linear programming approach that intends to maximise profits by considering the possibility of making partial and delayed deliveries. To illustrate this, we consider a real-world problem from the ceramic sector that contemplates 35 orders. We obtained a solution by a mathematical programming model and a simulation model. The results show the simulation model's capacity to obtain near-optimum results, and to provide a simulated history of the system. | es_ES |
dc.description.sponsorship | "This is an Author's Accepted Manuscript of an article published in Esteso, Ana, Josefa Mula, Francisco Campuzano-Bolarín, MME Alemany Diaz, and Angel Ortiz. 2018. Simulation to Reallocate Supply to Committed Orders under Shortage. International Journal of Production Research 57 (5). Informa UK Limited: 1552 70. doi:10.1080/00207543.2018.1493239, available online at: https://www.tandfonline.com/doi/full/10.1080/00207543.2018.1493239" | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Taylor & Francis | es_ES |
dc.relation.ispartof | International Journal of Production Research | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Available-to-promise | es_ES |
dc.subject | Lack of homogeneity | es_ES |
dc.subject | Shortage | es_ES |
dc.subject | Simulation | es_ES |
dc.subject | System dynamics | es_ES |
dc.subject | Ceramic sector | es_ES |
dc.subject.classification | ORGANIZACION DE EMPRESAS | es_ES |
dc.title | Simulation to reallocate supply to committed orders under shortage | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.1080/00207543.2018.1493239 | es_ES |
dc.relation.projectID | info:eu-repo/grantAgreement/MICINN//DPI2011-23597/ES/METODOS Y MODELOS PARA LA PLANIFICACION DE OPERACIONES Y GESTION DE PEDIDOS EN CADENAS DE SUMINISTRO CARACTERIZADAS POR LA FALTA DE HOMOGENEIDAD EN EL PRODUCTO/ | es_ES |
dc.relation.projectID | info:eu-repo/grantAgreement/MECD//FPU15%2F03595/ES/FPU15%2F03595/ | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Organización de Empresas - Departament d'Organització d'Empreses | es_ES |
dc.description.bibliographicCitation | Esteso, A.; Mula, J.; Campuzano-Bolarín, F.; Alemany Díaz, MDM.; Ortiz Bas, Á. (2019). Simulation to reallocate supply to committed orders under shortage. International Journal of Production Research. 57(5):1552-1570. https://doi.org/10.1080/00207543.2018.1493239 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | https://doi.org/10.1080/00207543.2018.1493239 | es_ES |
dc.description.upvformatpinicio | 1552 | es_ES |
dc.description.upvformatpfin | 1570 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 57 | es_ES |
dc.description.issue | 5 | es_ES |
dc.relation.pasarela | S\368333 | es_ES |
dc.contributor.funder | Ministerio de Ciencia e Innovación | es_ES |
dc.contributor.funder | Ministerio de Educación, Cultura y Deporte | es_ES |
dc.description.references | Alarcón, F., Alemany, M. M. E., Lario, F. C., & Oltra, R. F. (2011). La falta de homogeneidad del producto (FHP) en las empresas cerámicas y su impacto en la reasignación del inventario. Boletín de la Sociedad Española de Cerámica y Vidrio, 50(1), 49-58. doi:10.3989/cyv.072011 | es_ES |
dc.description.references | Alemany, M. M. E., Alarcón, F., Oltra, R. F., & Lario, F. C. (2013). Reasignación óptima del inventario a pedidos en empresas cerámicas caracterizadas por la falta de homogeneidad en el producto (FHP). Boletín de la Sociedad Española de Cerámica y Vidrio, 52(1), 31-41. doi:10.3989/cyv.42013 | es_ES |
dc.description.references | Alemany, M. M. E., Grillo, H., Ortiz, A., & Fuertes-Miquel, V. S. (2015). A fuzzy model for shortage planning under uncertainty due to lack of homogeneity in planned production lots. Applied Mathematical Modelling, 39(15), 4463-4481. doi:10.1016/j.apm.2014.12.057 | es_ES |
dc.description.references | Alemany, M. M. E., Lario, F.-C., Ortiz, A., & Gómez, F. (2013). Available-To-Promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: An illustration of a ceramic case. Applied Mathematical Modelling, 37(5), 3380-3398. doi:10.1016/j.apm.2012.07.022 | es_ES |
dc.description.references | ALEMANY, M. M. E., A., A., BOZA, A., & FUERTES-MIQUEL, V. S. (2015). A MODEL-DRIVEN DECISION SUPPORT SYSTEM FOR REALLOCATION OF SUPPLY TO ORDERS UNDER UNCERTAINTY IN CERAMIC COMPANIES. Technological and Economic Development of Economy, 21(4), 596-625. doi:10.3846/20294913.2015.1055613 | es_ES |
dc.description.references | Boza, A., Alemany, M. M. E., Alarcón, F., & Cuenca, L. (2013). A model-driven DSS architecture for delivery management in collaborative supply chains with lack of homogeneity in products. Production Planning & Control, 25(8), 650-661. doi:10.1080/09537287.2013.798085 | es_ES |
dc.description.references | Campuzano-Bolarín, F., Mula, J., & Peidro, D. (2013). An extension to fuzzy estimations and system dynamics for improving supply chains. International Journal of Production Research, 51(10), 3156-3166. doi:10.1080/00207543.2012.760854 | es_ES |
dc.description.references | Framinan, J. M., & Leisten, R. (2009). Available-to-promise (ATP) systems: a classification and framework for analysis. International Journal of Production Research, 48(11), 3079-3103. doi:10.1080/00207540902810544 | es_ES |
dc.description.references | Georgiadis, P., & Michaloudis, C. (2012). Real-time production planning and control system for job-shop manufacturing: A system dynamics analysis. European Journal of Operational Research, 216(1), 94-104. doi:10.1016/j.ejor.2011.07.022 | es_ES |
dc.description.references | Georgiadis, P., & Politou, A. (2013). Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems. Computers & Industrial Engineering, 65(4), 689-703. doi:10.1016/j.cie.2013.04.013 | es_ES |
dc.description.references | Grillo, H., Alemany, M. M. E., & Ortiz, A. (2016). A review of mathematical models for supporting the order promising process under Lack of Homogeneity in Product and other sources of uncertainty. Computers & Industrial Engineering, 91, 239-261. doi:10.1016/j.cie.2015.11.013 | es_ES |
dc.description.references | Grillo, H., Alemany, M. M. E., Ortiz, A., & Mula, J. (2017). A Fuzzy Order Promising Model With Non-Uniform Finished Goods. International Journal of Fuzzy Systems, 20(1), 187-208. doi:10.1007/s40815-017-0317-y | es_ES |
dc.description.references | Jeon, S. M., & Kim, G. (2016). A survey of simulation modeling techniques in production planning and control (PPC). Production Planning & Control, 27(5), 360-377. doi:10.1080/09537287.2015.1128010 | es_ES |
dc.description.references | Mula, J., Campuzano-Bolarin, F., Díaz-Madroñero, M., & Carpio, K. M. (2013). A system dynamics model for the supply chain procurement transport problem: comparing spreadsheets, fuzzy programming and simulation approaches. International Journal of Production Research, 51(13), 4087-4104. doi:10.1080/00207543.2013.774487 | es_ES |
dc.description.references | Olhager, J. (2003). Strategic positioning of the order penetration point. International Journal of Production Economics, 85(3), 319-329. doi:10.1016/s0925-5273(03)00119-1 | es_ES |
dc.description.references | Tako, A. A., & Robinson, S. (2012). The application of discrete event simulation and system dynamics in the logistics and supply chain context. Decision Support Systems, 52(4), 802-815. doi:10.1016/j.dss.2011.11.015 | es_ES |
dc.subject.ods | 09.- Desarrollar infraestructuras resilientes, promover la industrialización inclusiva y sostenible, y fomentar la innovación | es_ES |